Plan Review Notes
Plan Review Notes For Permit 17120813
Permit Number 17120813
Review Stop M
Sequence Number 1
Notes
Date Text
2018-01-26 17:17:141ST REVIEW FBC-2014 MECHANICAL , ENERGY CONSERVATION
 CODES , ASHRAE 170-2008, GUIDELINES FOR DESIGN AND
 CONSTRUCTION OF HEALTH CARE FACILITIES- 2010.
 PERMIT #17120057
 1/26/18
  
 PLAN REVIEW RESULTS: DENIED.
  
  
 1) IN ACCORDANCE WITH SECTION C403.2.1 FBC-14 PROVIDE
 COOLING AND HEATING CALCULATIONS FOR THE RTU'S, AND THE
 PTAC UNITS.
  
 2) THE ARCHITECT AND ENGINEER OF RECORD SHALL PROVIDE
 ELECTRONIC SIGNATURES AND SEALS ON THE COMCHECK
 COMPLIANCE CERTIFICATE- SECTION 61G15-23.005 FAC.
  
 3) SHEETS G010 & M201: THERE ARE MISSING FIRE DAMPERS
 WHERE DUCTS ARE PENETRATING THE FIRE-RATED WALLS AT
 STORAGE 401, SOILED UTILITY 431, & LINEN STORAGE 433.
  
 4) M201: REFER TO SECTION 607.5.4 AND PROVIDE SMOKE
 DAMPERS FOR ALL DUCTS PENETRATING THE CORRIDOR WALLS,
 UNLESS THE WALL IS NOT REQUIRED TO HAVE SMOKE AND DRAFT
 CONTROL DOORS, OR IF MEETING ONE OF THE THREE
 EXCEPTIONS LISTED UNDER THE CODE SECTION.
  
 5) M201: PROVIDE A SYMBOL ON THE PLAN TO INDICATE THE
 LOCATIONS OF REQUIRED DUCT SMOKE DETECTORS PER SECTION
 606.2.1. INDICATE HOW THE DEVICES WILL BE SUPERVISED,
 AND THE SEQUENCE OF OPERATION RELATING TO SHUTDOWN OF
 THE SYSTEM(S) WHEN A DETECTOR ACTUATES- SECTIONS 606.4
 AND 606.4.1;.
  
 6) PROVIDE THE WIND LOAD DESIGN CRITERIA AND COMPLETE
 ENGINEERED DETAILS FOR INSTALLATION OF THE RTU'S AND
 CURBS- SEE SECTION 301.15 FBC-14 MECHANICAL, AND
 SECTION 1609 FBC-14 BUILDING.
  
 7) PROVIDE CONDENSATE DISPOSAL PLANS FOR THE RTU'S AND
 THE PTAC UNITS- SECTION 307.
  
 8) PROVIDE DUCT INSTALLATION DETAILS: TYPE OF DUCTWORK,
 PRESSURE CLASSIFICATION, INSULATION THICKNESS AND
 R-VALUE, AND SUPPORT, HANGING, AND CONNECTION DETAILS.
  
 9) VERIFY THAT THE PTAC UNITS ARE FOR RECIRCULATION
 ONLY AND WILL NOT PROVIDE OUTSIDE AIR AS NOTED IN
 SECTION 4.1-8.2.1(2) GUIDELINES FOR DESIGN AND
 CONSTRUCTION OF HEALTH CARE FACILITIES. OTHERWISE
 MINIMUM MERV 7 FILTERS ARE REQUIRED PER TABLE 6-1
 ASHRAE 170-2008.
  
 10) REFER TO SECTION 6.3.1 ASHRAE 170-2008 AND VERIFY
 HEIGHT CLEARANCE REQUIREMENTS FOR O/A INTAKES ON THE
 ROOF OR AT GRADE.
  
 11) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE GAS
 WATER HEATER.
  
 12) SHOW HOW ACCESS WILL BE PROVIDED TO THE ROOF FOR
 SERVICE AND REPLACEMENT OF THE ROOF TOP MECHANICAL
 EQUIPMENT- SECTION 306.5.
  
 13) PLEASE SEE BUILDING REVIEW COMMENTS RELAIVE TO
 FLOOD ELEVATION AND VERIFY ALL MECHANICAL EQUIPMENT
 WILL BE LOCATED AT OR ABOVE THE REQUIRED FLOOD
 ELEVATION HEIGHT- SECTION 301.16.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved