Plan Review Notes
Plan Review Notes For Permit 17120261
Permit Number 17120261
Review Stop P
Sequence Number 2
Notes
Date Text
2018-04-03 10:05:52 
 2ND REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS: PREVIOUS COMMENTS
  
 PARTIALLY COMPLIED 6. PLEASE PROVIDE A LABELING SYSTEM
 FOR THE SANITARY, WATER AND GAS THAT WILL SHOW A
 COHESIVE CORRELATION BETWEEN THE RISER?S ISOMETRIC
 DRAWINGS AND FLOOR PLANS. PER WPB AMEND TO THE FBC
 107.2.1
 THE ISOMETRIC DRAWINGS ARE STILL EXTREMELY CONFUSING I
 CANNOT DETERMINE CODE COMPLIANCE. PER WPB AMEND TO FBC
 2017 SEC 107.2.1 CONSTRUCTION DOCUMENTS SHALL BE OF
 SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND
 EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT
 WILL CONFORM TO THE PROVISIONS OF THIS CODE AND
 RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS
 DETERMINED BY THE BUILDING OFFICIAL.
 A) THE TAGS ON THE SANITARY STACKS ON THE FLOOR PLAN
 ARE ALL LABELLED THE SAME WITH THE KEY NOTE NUMBER
 PLEASE TAG WITH INDIVIDUAL NUMBERS OR LETTERS THAT CAN
 BE FOUND ON THE ISOMETRIC DRAWINGS.
 B) ON THE ENLARGED ISOMETRIC DRAWINGS THE INDIVIDUAL
 PIPES NEED TO BE LABELED MATCH TO THE PIPE IT IS
 CONNECTED TO ON OTHER ISOMETRICS THE ONES SHOWN NOW
 JUST INDICATE OTHER ISOMETRIC NOT INDIVIDUAL PIPES.
 C) THE OVERALL ISOMETRIC ON SHT P7-3 NEEDS TO BE SPLIT
 UP AND ENLARGED ALSO THE FIXTURE AND SOIL STACKS NEED
 TO BE LABELED.
 D) ON ALL THE ISOMETRIC DRAWING PLEASE REMOVE ALL STRAY
 PIPING THAT IS NOT SHOWN TO CONNECT ANYWHERE OR LABEL
 IT.
 E) THE ENLARGED ISOMETRIC DRAWING ARE STILL TO COMPACT
 PLEASE ENLARGE.
  
 PARTIALLY COMPLIED 8. PROVIDE A COMPLETE SANITARY AND
 GREASE ISOMETRIC FOR THE SECOND AND THIRD FLOOR SHOWING
 THE KITCHEN, BATHROOMS AND BAR AREAS, ON THE BRANCHES
 FOR EACH AREA YOU CAN LABEL IT TO COINCIDE TO THE
 ENLARGED ISOMETRIC DRAWING INSTEAD OF DRAWING THE AREA
 TWICE. PER WPB AMEND TO THE FBC 107.2.1
 PLEASE LABEL GREASE AND SANITARY SEPARATELY.
  
 PARTIALLY COMPLIED 12. PLEASE PROVIDE SIZING
 CALCULATIONS FOR THE GREASE INTERCEPTORS. . PER WPB
 AMEND TO THE FBC 107.2.1
 THE SIZING CALCULATIONS FOR THE GREASE INTERCEPTOR
 APPEAR TO BE INCOMPLETE PLEASE PROVIDE THE WASTE WATER
 FACTOR AND THE LOAD FACTOR. I CANNOT DETERMINE HOW YOUR
 CALCULATION FIGURES OUT TO 3305 GAL PLEASE CLARIFY.
  
 NEW COMMENTS:
  
 1. IS THE ELEVATOR A TRACTION TYPE OR HYDRAULIC IF IT
 IS HYDRAULIC AN OIL SEPARATOR IS REQUIRED OR AN OIL
 ALARM SYSTEM. PER FBC PL 1003.4
 2. SHT. P0-1 NOTE #1 THE PLUMBING SHALL BE DESIGNED AND
 SIZED PER THE 2014 FBC PLUMBING 5TH EDITION THE 2012 IS
 SHOWN.
 3. MAXIMUM SIZE OF THE GREASE INTERCEPTOR PER WPB
 UTILITIES IS 1250 GAL YOU CAN CONTACT JEFFERY ODOMS PH
 # 561-822-2172 OR [email protected]
 4. SHT. P4-2 THE 6? HORIZONTAL OVERFLOW STORM DRAIN
 PIPING WITH 5700 + 5740 SQFT IS UNDERSIZED @ 1/8 FT.
 THE MAX FOR 6? IS 4280SQFT.PER FBC PL TABLE 1106.3
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  