| Date |
Text |
| 2018-04-05 07:30:49 | 2ND REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION, |
| | FUEL GAS CODES, AND WEST PALM BEACH AMENDMENTS TO THE |
| | FBC-14 |
| | PERMIT #17120261 |
| | 1/12/18 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) THE AC CALCULATIONS FOR RTU-1, 2, & 3 MUST BE |
| | ELECTRONICALLY SIGNED AND SEALED BY THE ENGINEER WHO |
| | PREPARED THE CALCULATIONS- SECTION 105.3.1.2(3) WPB |
| | AMENDMENTS TO THE FBC, AND SECTIONS 61G15-23.001 AND |
| | 61G15-23.005 FLORIDA ADMINISTRATIVE CODE. |
| | |
| | 2) SHEET MEPO-2: A) AC SYSTEMS FCU-103, FCU-104, |
| | AC-101, AC-102, AND AC-302 ARE OVERSIZED PER THE |
| | SUBMITTED AC CALCULATIONS- SECTION C403.2.2 FBC-14 |
| | ENERGY CONSERVATION. B) THE SCHEDULE SHOWS A DEFICIENT |
| | AMOUNT OF 1100 CFMS OF SUPPLY AIR FOR FC-104 WHICH IS A |
| | 4-TON SYSTEM. |
| | |
| | 3) COMCHECK COMPLIANCE AND SHEETS MEPO-2 & MEPO-3: A) |
| | THE RTU CAPACITIES AND EER'S AS LISTED IN THE COMCHECK |
| | REPORT DO NOT MATCH THE CAPACITIES AND EER'S IN THE |
| | SCHEDULES. B) NO EER IS LISTED IN THE SCHEDULE FOR |
| | MAU-1. C) NO EER'S OR SEER'S FOR THE FAN COIL UNITS AND |
| | SPLIT SYSTEMS HAVE BEEN PROVIDED IN THE SCHEDULES TO |
| | COMPARE WITH THE RATINGS SHOWN IN THE CALCULATIONS. |
| | |
| | 4) THE SUBMITTED CUT SHEETS FOR THE SPACE-RAY OUTDOOR |
| | INFRARED HEATERS DO NOT PROVIDE EVIDENCE OF COMPLIANCE |
| | WITH ANSI Z83.19 OR Z83.20- SECTION 630.1 FBC-14 FUEL |
| | GAS. |
| | |
| | 5) AS PREVIOUSLY REQUESTED IN THE 1ST REVIEW, PLEASE |
| | PROVIDE A COMMISSIONING PLAN AS OUTLINED IN SECTION |
| | C408.2.1 FBC-14 ENERGY CONSERVATION. ACCORDING TO THE |
| | RESPONSE NARRATIVE TO THE 1ST REVIEW COMMENTS, THERE |
| | ARE NOTES ON SHEET M0-1 CLARIFYING THE COMMISSIONING |
| | PLAN. I WAS NOT ABLE TO LOCATE ANY NOTES ON THIS SHEET. |
| | |
| | 6) SHEET M2-1B: EXHAUST SYSTEMS ARE REQUIRED FOR THE |
| | FITTING ROOMS- TABLE 403.3. |
| | |
| | 7) SHEETS M2-2-B & M2-3-B: THE MAU-1 DUCT, AND THE |
| | RTU-3 SUPPLY AND RETURN DUCT CANNOT BE LOCATED IN THE |
| | SAME SHAFT OR CHASE WITH THE GREASE EXHAUST DUCT IN |
| | ACCORDANCE WITH SECTION 506.3.11. CLARIFY IS THE GREASE |
| | EXHAUST DUCT IS TO BE ENCLOSED IN A SEPARATE SHAFT, OR |
| | HAVE A FIELD-APPLIED ENCLOSURE SUCH AS FIREWRAPPING |
| | THAT IS COMPLIANT WITH ASTM E 2336. |
| | |
| | 8) PLEASE PLACE THE COMBUSTION AIR CALCULATION FOR THE |
| | GAS-FIRED COOKING APPLIANCES ONTO THE PLAN. |
| | |
| | 9) WIND LOAD ENGINEERING FOR THE ROOFTOP MECHANICAL |
| | EQUIPMENT, THE DESTRATIFICATION FANS, AND INFRARED |
| | HEATERS IS ACKNOWLEDGED TO BE DEFERRED SUBMITTALS. |
| | ADDITIONAL REQUIRED SUBMITTALS TO BE PROVIDED AT THE |
| | PRESENT TIME OR AS DEFERRED SUBMITTALS INCLUDE: AC |
| | STANDS, RTU AND FAN CURBS, DUCT AND PIPE STANDS AND |
| | BRACKETS FOR ROOFTOP ATTACHMENT, FIRE DAMPERS, SMOKE |
| | DETECTORS, MOTORIZED DAMPERS, EXHAUST AND O/A LOUVERS, |
| | WATER HEATER AND WATER HEATER VENT PIPING. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |