2018-04-05 07:30:492ND REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION,
 FUEL GAS CODES, AND WEST PALM BEACH AMENDMENTS TO THE
 FBC-14
 PERMIT #17120261
 1/12/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE AC CALCULATIONS FOR RTU-1, 2, & 3 MUST BE
 ELECTRONICALLY SIGNED AND SEALED BY THE ENGINEER WHO
 PREPARED THE CALCULATIONS- SECTION 105.3.1.2(3) WPB
 AMENDMENTS TO THE FBC, AND SECTIONS 61G15-23.001 AND
 61G15-23.005 FLORIDA ADMINISTRATIVE CODE.
  
 2) SHEET MEPO-2: A) AC SYSTEMS FCU-103, FCU-104,
 AC-101, AC-102, AND AC-302 ARE OVERSIZED PER THE
 SUBMITTED AC CALCULATIONS- SECTION C403.2.2 FBC-14
 ENERGY CONSERVATION. B) THE SCHEDULE SHOWS A DEFICIENT
 AMOUNT OF 1100 CFMS OF SUPPLY AIR FOR FC-104 WHICH IS A
 4-TON SYSTEM.
  
 3) COMCHECK COMPLIANCE AND SHEETS MEPO-2 & MEPO-3: A)
 THE RTU CAPACITIES AND EER'S AS LISTED IN THE COMCHECK
 REPORT DO NOT MATCH THE CAPACITIES AND EER'S IN THE
 SCHEDULES. B) NO EER IS LISTED IN THE SCHEDULE FOR
 MAU-1. C) NO EER'S OR SEER'S FOR THE FAN COIL UNITS AND
 SPLIT SYSTEMS HAVE BEEN PROVIDED IN THE SCHEDULES TO
 COMPARE WITH THE RATINGS SHOWN IN THE CALCULATIONS.
  
 4) THE SUBMITTED CUT SHEETS FOR THE SPACE-RAY OUTDOOR
 INFRARED HEATERS DO NOT PROVIDE EVIDENCE OF COMPLIANCE
 WITH ANSI Z83.19 OR Z83.20- SECTION 630.1 FBC-14 FUEL
 GAS.
  
 5) AS PREVIOUSLY REQUESTED IN THE 1ST REVIEW, PLEASE
 PROVIDE A COMMISSIONING PLAN AS OUTLINED IN SECTION
 C408.2.1 FBC-14 ENERGY CONSERVATION. ACCORDING TO THE
 RESPONSE NARRATIVE TO THE 1ST REVIEW COMMENTS, THERE
 ARE NOTES ON SHEET M0-1 CLARIFYING THE COMMISSIONING
 PLAN. I WAS NOT ABLE TO LOCATE ANY NOTES ON THIS SHEET.
  
 6) SHEET M2-1B: EXHAUST SYSTEMS ARE REQUIRED FOR THE
 FITTING ROOMS- TABLE 403.3.
  
 7) SHEETS M2-2-B & M2-3-B: THE MAU-1 DUCT, AND THE
 RTU-3 SUPPLY AND RETURN DUCT CANNOT BE LOCATED IN THE
 SAME SHAFT OR CHASE WITH THE GREASE EXHAUST DUCT IN
 ACCORDANCE WITH SECTION 506.3.11. CLARIFY IS THE GREASE
 EXHAUST DUCT IS TO BE ENCLOSED IN A SEPARATE SHAFT, OR
 HAVE A FIELD-APPLIED ENCLOSURE SUCH AS FIREWRAPPING
 THAT IS COMPLIANT WITH ASTM E 2336.
  
 8) PLEASE PLACE THE COMBUSTION AIR CALCULATION FOR THE
 GAS-FIRED COOKING APPLIANCES ONTO THE PLAN.
  
 9) WIND LOAD ENGINEERING FOR THE ROOFTOP MECHANICAL
 EQUIPMENT, THE DESTRATIFICATION FANS, AND INFRARED
 HEATERS IS ACKNOWLEDGED TO BE DEFERRED SUBMITTALS.
 ADDITIONAL REQUIRED SUBMITTALS TO BE PROVIDED AT THE
 PRESENT TIME OR AS DEFERRED SUBMITTALS INCLUDE: AC
 STANDS, RTU AND FAN CURBS, DUCT AND PIPE STANDS AND
 BRACKETS FOR ROOFTOP ATTACHMENT, FIRE DAMPERS, SMOKE
 DETECTORS, MOTORIZED DAMPERS, EXHAUST AND O/A LOUVERS,
 WATER HEATER AND WATER HEATER VENT PIPING.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved