| 2018-11-14 09:21:14 | PLAN |
| | REVIEW COMMENTS |
| | 3611 S. FLAGLER DRIVE |
| | "THE CRYSTAL" 6 UNIT, 7 STOREY R-2 (CONDO) |
| | AE FLOOD ZONE |
| | |
| | 5TH REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) NOT ADDRESSED. NEW COMMENTS: THRESHOLD BUILDINGS |
| | REQUIRE THREE SETS OF CONSTRUCTION DOCUMENTS. ONLY TWO |
| | SETS OF THE PILE SURVEYS WERE SUBMITTED. THE LETTER |
| | FROM THE ENGINEER, RONALD M. JEZERINAC P.E., STATES |
| | THAT THE PILE SURVEYS THAT THEY REVIEWED HAVE HIS SHOP |
| | DRAWING APPROVAL STAMP. THE ONES THAT WERE SUBMITTED DO |
| | NOT HAVE SHOP DRAWING REVIEW STAMPS ON THEM. |
| | -FBC 107.2.1.3 PROVIDE CERTIFICATION DOCUMENTS FROM THE |
| | THRESHOLD INSPECTOR THAT HAVE BEEN REVIEWED AND |
| | ACCEPTED BY THE DESIGNER OF RECORD ATTESTING THAT THE |
| | PRODUCTION PILES AND PILE CAPS HAVE BEEN INSPECTED AND |
| | ARE INSTALLED PER THE PLANS FROM THE DESIGNER OF |
| | RECORD. |
| | |
| | 2) NOT ADDRESSED. NEW COMMENT: THE (3) THRESHOLD |
| | INPECTION PLANS THAT WERE SUBMITTED HAVE DIGITAL |
| | SIGNATURES, WHICH ARE ONLY ACCEPTABLE FOR |
| | ELECTRONICALLY SUBMITTED DOCUMENTS. |
| | -FBC 110.3.7 SUBMIT THREE SETS OF A THRESHOLD |
| | INSPECTION PLAN FROM THE NEW DESIGNER OF RECORD. THE |
| | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURES ARE REQUIRED |
| | ON PAPER DOCUMENTS PER FAC 61G15-23.003 |
| | |
| | 3) NOT ADDRESSED. NEW COMMENT: I DID NOT SEE TERMITE |
| | PROTECTION SPECIFIED ON THE PLANS. |
| | -SHOW COMPLIANCE WITH FBC1816.1 TERMITE PROTECTION. |
| | |
| | 4) ADDRESSED. I REDLINED SHEET A101 TO REFER TO REVISED |
| | SHEETS A101 AND S3.1. |
| | -FBC 107.2.1THERE ARE SOME DISCREPANCIES BETWEEN THE |
| | ARCHITECTURAL PLANS AND THE STRUCTURAL PLANS THAT NEED |
| | TO BE ADDRESSED. ON SHEET S3.1 THE OPENING AND STAIRS |
| | ARE SHOWN ON THE WEST SIDE OF THE FIRE PUMP ROOM. THE |
| | SITE PLANS AND SHEETS A101 AND A201 SHOW THE DOOR ON |
| | THE SOUTH END OF THE FIRE PUMP ROOM. |
| | |
| | 5) NEW COMMENTS: THRESHOLD BUILDINGS REQUIRE THREE (3) |
| | SETS OF CONSTRUCTION DOCUMENTS TO BE SUBMITTED FOR |
| | REVIEW. ONLY TWO SETS OF THE GEOTECHNICAL REPORT, THE |
| | SITE-SPECIFIC FLOOD ZONE ANALYSIS THE LETTERS FROM |
| | NUTTING ENGINEERS AND JEZERINAC GROUP WERE SUBMITTED. |
| | FBC 107.1 |
| | |
| | 6) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT A |
| | RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| | COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |
| | |