| Date |
Text |
| 2017-12-28 18:01:17 | NEW SINGLE FAMILY RESIDENCE (R3), MECHANICAL REVIEW |
| | COMMENTS. |
| | CODE: FBC 5TH EDITION (2014). |
| | |
| | NOTE: |
| | MECHANICAL REVIEW MAY BE APPROVED WITH PROVISO. PROVISO |
| | MEANS THAT CONTRACTOR WILL SUBMIT REQUIRED INFORMATION |
| | AFTER THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO |
| | AVOID CONFLICTS/DELAYS. REVISION FEES MAY APPLY. |
| | CONTRACTOR TO ADVICE IS PROVISO OPTION IS PREFERRED AT |
| | THIS TIME OR IF RE-SUBMITTING REQUIRED INFORMATION. |
| | |
| | 1- REVISE EQUIPMENT SIZING CALCULATIONS: |
| | A) CALCULATIONS NEED TO BE DONE FOR THE ACTUAL |
| | ORIENTATION OF THE BUILDING AS REQUIRED BY SEC. |
| | R403.6.1 FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | REVISE AS REQUIRED. NOTE: IT LOOKS LIKE THE PERSON |
| | PREPARING THE EQUIPMENTS SIZING CALCULATIONS IS THE |
| | SAME PERSON WHO PREPARED THE ENERGY CALCULATIONS. |
| | COORDINATE WITH BUILDING COMMENTS REGARDING THE ENERGY |
| | CALCULATIONS. SEE COMMENTS BELOW. |
| | |
| | B) EQUIPMENT LISTED IN THE EQUIPMENT SIZING |
| | CALCULATIONS AND A/C PLAN SUBMITTED DON'T MATCH. REVISE |
| | AS REQUIRED TO MATCH. NOTE: COORDINATE WITH A/C |
| | CONTRACTOR TO AVOID CONFLICTS/DELAYS. SEC. 107.2.1 CITY |
| | AMENDMENTS. |
| | |
| | C) THE COOLING DESIGN CONDITIONS NEED TO BE REVISED AS |
| | REQUIRED BY SEC. C302.1 FBC-ENERGY CONSERVATION. THE |
| | MINIMUM DESIGN CONDITIONS FOR COOLING IS 75 DEGREES NOT |
| | 74 DEGREES. REVISE AS REQUIRED. |
| | |
| | D) THE NUMBER OF PEOPLE USED FOR THE CALCULATIONS |
| | DOESN'T MATCH THE NUMBER OF PEOPLE SPECIFIED ON THE |
| | ENERGY CALCULATIONS. REVISE AS REQUIRED TO MATCH. SEC. |
| | R403.6.1 FBC-ENERGY CONSERVATION DOESN'T ALLOW ANY |
| | FACTORS THAT WILL AFFECT THE SIZING OF THE EQUIPMENT. |
| | |
| | 2- THERE ARE TWO DIFFERENT A/C PLANS SUBMITTED. ONE |
| | PLAN WAS SUBMITTED WITH THE EQUIPMENT SIZING |
| | CALCULATIONS AND THE ONE WAS SUBMITTED BY THE A/C |
| | CONTRACTOR. THEY DON'T MATCH. SUBMIT ONLY ONE A./C PLAN |
| | TO AVOID CONFLICTS/DELAYS. SEC. 107.2.1 CITY |
| | AMENDMENTS. |
| | |
| | 3- A/C PLAN SUBMITTED BY A/C CONTRACTOR (SMYTH AIR |
| | CONDITIONING INC): |
| | A) PROVIDE THE NAME AND SIGNATURE OF THE A/C CONTRACTOR |
| | RESPONSIBLE FOR THE DESIGN AS REQUIRED BY SEC. 107.2.1 |
| | CITY AMENDMENTS. |
| | |
| | B) EQUIPMENT LISTED IN THE EQUIPMENT SIZING |
| | CALCULATIONS AND A/C PLAN SUBMITTED DON'T MATCH. REVISE |
| | AS REQUIRED TO MATCH. 107.2.1 CITY AMENDMENTS. |
| | |
| | |
| | |
| | ENERGY CALCULATIONS COMMENTS DONE UNDER THE BUILDING |
| | REVIEW: |
| | 1- ENERGY CALCULATIONS SUBMITTED: |
| | A) NUMBER OF BEDROOMS DON'T MATCH PLANS. NOTE: |
| | COORDINATE WITH ENGINEER OF RECORD AND REVISE AS |
| | REQUIRED. COORDINATE WITH ITEM #6 ABOVE. SEC. |
| | R101.5.1.1.1 FBC-ENERGY CONSERVATION, 5TH EDITION |
| | (2014). |
| | |
| | B) REVISE ROOF MATERIAL SPECIFIED ON PAGE 2 OF 4 TO |
| | MATCH PLANS AND PRODUCT APPROVAL SUBMITTED. SEC. |
| | R101.5.1.1.1 FBC-ENERGY CONSERVATION, 5TH EDITION |
| | (2014). |
| | |
| | C) PAGE 2 OF 4 SPECIFIES AN ATTIC VENTILATION RATIO OF |
| | 1/300. PLANS DON'T PROVIDE ANY SPECIFICATIONS FOR THE |
| | 1/300 VENT RATIO. TYPICALLY THE VENT RATIO IS 1/150. IF |
| | USING THE 1/300 VENT RATIO, THEN PLANS WILL NEED TO BE |
| | REVISED SHOWING COMPLIANCE WITH THIS RATIO AS REQUIRED |
| | BY THE EXCEPTION OF SEC. R806.2 FBC-RESIDENTIAL. |
| | COORDINATE WITH ENGINEER OF RECORD AND REVISE AS |
| | REQUIRED. |
| | |
| | D) WALLS AND WINDOWS ORIENTATION NEED TO BE REVISED TO |
| | MATCH PLANS. NOTE: SEE SURVEY AND SITE PLAN FOR THE |
| | CORRECT ORIENTATION. SEC. R101.5.1.1.1 FBC-ENERGY |
| | CONSERVATION, 5TH EDITION (2014). |
| | |
| | E) COOLING AND HEATING INFORMATION DOESN'T MATCH |
| | EQUIPMENT SIZING CALCULATIONS. REVISE AS REQUIRED TO |
| | MATCH. SEC. R101.5.1.1.1 FBC-ENERGY CONSERVATION, 5TH |
| | EDITION (2014). |
| | |
| | |
| | |
| | ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| | COMMENT TO HELP EXPEDITE THE REVIEW PROCESS. |
| | ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD |
| | DRAWINGS. DON'T STAPLE OLD DRAWINGS. SUBMIT OLD |
| | DRAWINGS FOR REFERENCE. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |