2018-07-13 16:55:373RD REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION,
 BUILDING
 PERMIT #17110874
 OLD CITY HALL/MARRIOTT HOTEL
 7/13/18
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEETS M-101, LS-101: FIRE DAMPERS MISSING AT THE
 16X14 DUCT PENETRATING THE EXIT CORRIDOR/VESTIBULE
 FIRE-RATED WALL, AND THE TWO14X14 DUCTS PENETRATING THE
 CONFERENCE/MECH FIRE-RATED WALL.
  
 2) M-101: PROVIDE VENTILATION FOR THE FIRE PUMP ROOM-
 SEE SECTION 11.3.2.1 NFPA 20.
  
 3) M-101: PROVIDE EXHAUST VENTILATION FOR THE
 LINEN/TRASH CHUTE ROOM- TABLE 6-4 ASHRAE 62.1-10.
  
 4) M-101 & M600: VENTILATION AND AIR BALANCE
 CALCULATIONS FOR THE FUTURE LAUNDRY HAVE NOT BEEN
 PROVIDED, AND NO MEANS OF PROVIDING THE REQUIRED O/A
 FOR OCCUPANTS IS SHOWN ON THE PLAN. PLEASE CLARIFY IF A
 REVISION TO THE PLAN WILL BE PROVIDED FOR THE LAUNDRY,
 AND IF SO, PLEASE ADD IT TO THE LIST OF DEFERRED
 SUBMITTALS ON SHEET M-001.
  
 5) M-102: THE KITCHEN EXHAUST FANS SHALL HAVE A MINIMUM
 CLEARANCE OF 10' TO THE ADJACENT BUILDING WALLS AND
 PROPERTY LINE- SECTION 506.3.13.3 FBC-14 MECHANICAL.
 THE PLAN SHOWS 5'9-13/32 AND 5'4" WHICH IS
 NON-COMPLIANT.
  
 6) M-102: CLARIFY HOW ACCESS TO THE KSF, KEF'S AND
 OTHER APPLIANCES AND EQUIPMENT ON THE ROOF WILL BE
 PROVIDED FOR SERVICE AND REPLACEMENT- SECTION 306.1
 FBC-14 MECH.
  
 7) M-101,M-105: WHERE REQUIRED BY 606.2.1 FBC-14
 MECHANICAL, THE DUCT SMOKE DETECTORS SHALL BE INSTALLED
 IN THE RETURN AIR SYSTEMS OF THE AIR HANDLERS.THE PLANS
 ARE SHOWING THEM IN THE SUPPLY SIDES.
  
 8) M-101, 102, 103, 104, 105, 705: THE FIRE/SMOKE
 DAMPERS AT SHAFT PENETRATIONS AND OTHER PENETRATION
 LOCATIONS WILL HAVE TO BE MOTORIZED AS PART OF THE
 SMOKE CONTROL SYSTEM. PLEASE PROVIDE THE MOTORIZED
 DAMPER SYMBOLS AT THE REQUIRED LOCATIONS.
  
 9) M-101, 102, 103, 104, 105, 705: PLEASE PLACE VERY
 APPARENT NOTES ON THE MEP PLANS TO INDICATE THE
 STAIRWELL VENTILATION CHASES ARE FOR STAIRWELL
 PRESSURIZATION ONLY AND NO OTHER PIPES, CONDUITS,
 RACEWAYS, WIRING, DUCTS ETC. SHALL BE PERMITTED IN
 THOSE CHASES.
  
 10) M-105: MORE INFORMATION ABOUT THE POOL ROOMS WILL
 BE REQUIRED EITHER UNDER THIS MAIN OR SEPARATE PERMIT.
 PLEASE PROVIDE A LIST OF CHEMICALS TO BE STORED IN THE
 ROOMS INCLUDING THEIR QUANTITIES AND SUBMIT MSDS
 SHEETS. A) PROVIDE EXHAUST VENTILATION CALCULATIONS FOR
 THE POOL ROOM AND ADJACENT STORAGE ROOMS. PLEASE NOTE
 THAT HAZARDOUS EXHAUST DUCT SYSTEMS SHALL RUN
  
 INDEPENDENTLY OF OTHER EXHAUST DUCTS. THE CURRENT PLAN
 SHOWS INTERCONNECTION OF THE EXHAUST DUCTS FROM EACH
 STORAGE ROOM WHICH MAY BE PROHIBITED IF ONLY ONE OF THE
 ROOMS IS STORING CHEMICALS.
  
 11) M-105: PLEASE INCLUDE THE MAKEUP AND EXHAUST AIR
 CALCULATIONS FOR THE POOL ROOMS IN THE AIR BALANCE
 SCHEDULE.
  
 12) M-001: PLEASE ADD THE FOLLOWING ITEMS TO THE
 DEFERRED SUBMITTALS LIST: MANUFACTURER'S SPECIFICATIONS
 FOR THE GENERATOR, DUCT SMOKE DETECTORS, C02 SENSORS,
 DRYERS, AND FACTORY MADE ACCESS PANELS,
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved