| Date |
Text |
| 2018-07-30 15:02:16 | |
| | 3RD REVIEW: FBC 2014 5TH EDITION |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. PROVIDE LONGEST LENGTH FROM .5LB REGULATOR TO |
| | APPLIANCES IN THE KITCHENS. PER FBC FG 402.4.1 |
| | 2. THE SECTION OF PIPE BETWEEN THE REGULATOR FOR THE |
| | GENERATOR UPSTREAM TO THE FIRST TEE IS UNDERSIZED IT |
| | SHALL BE 11/2' USING 300' PER FBCFG TABLE 402.4(5) |
| | 3. PROVIDE COMBUSTION AIR CALCULATIONS FOR THE POOL |
| | HEATER. PER FBC FG 304.5 |
| | 4. THE INTAKE AND EXHAUST FOR THE BOILERS AND GENERATOR |
| | ARE LOCATED DOWN AT THE BOTTOM OF A SHAFT OR PIT HOW |
| | WILL THE EXHAUST BE KEPT FROM BUILDING UP IF THERE IS |
| | NO VENTILATION OF THE AREA SOME DOCUMENTATION FROM THE |
| | MANUFACTURE WILL BE REQUIRED STATING THAT THIS |
| | CONFIGURATION WILL ALLOW THE EQUIPMENT TO FUNCTION |
| | PROPERLY. PER WPB AMEND TO FBC 107.2.1 |
| | 5. SHT. P-407 PLEASE SHOW ON THE PLAN THE MIN DISTANCE |
| | BETWEEN THE INTAKE AND EXHAUST. . PER WPB AMEND TO FBC |
| | 107.2.1 |
| | 6. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT AND PRESSURE |
| | REGULATORS TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54, |
| | NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND |
| | 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES |
| | SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| | FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT |
| | THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES. |
| | SEC.G2408.1. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |