| Date |
Text |
| 2018-02-02 10:18:25 | 1ST REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION |
| | PERMIT #17110874 |
| | OLD CITY HALL/MARRIOTT HOTEL |
| | 2/1/2018 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) THE SUMMARY AC CALCULATIONS ARE INCOMPLETE. PLEASE |
| | REVIEW SECTION C403.2.1 (EXCEPTION) FBC-14 ENERGY |
| | CONSERVATION: |
| | |
| | EXCEPTION: WHERE MECHANICAL SYSTEMS ARE DESIGNED BY A |
| | REGISTERED ENGINEER, THE ENGINEER HAS THE OPTION OF |
| | SUBMITTING A SIGNED AND SEALED SUMMARY SHEET TO THE |
| | BUILDING DEPARTMENT IN LIEU OF THE COMPLETE SIZING |
| | CALCULATION(S). SUCH SUMMARY SHEET SHALL INCLUDE THE |
| | FOLLOWING (BY ZONE): |
| | 1. PROJECT NAME/OWNER |
| | 2. PROJECT ADDRESS |
| | 3. AREA IN SQUARE FEET |
| | 4. SIZING METHOD USED |
| | 5. OUTDOOR DRY BULB USE |
| | 6. INDOOR DRY BULB |
| | 7. OUTDOOR WET BULB USED |
| | 8. GRAINS WATER (DIFFERENCE) |
| | 9. TOTAL SENSIBLE GAIN |
| | 10. TOTAL LATENT GAIN |
| | 11. RELATIVE HUMIDITY |
| | 12. TOTAL COOLING REQUIRED WITH OUTSIDE AIR |
| | 13. TOTAL HEATING REQUIRED WITH OUTSIDE AIR |
| | PLEASE RESUBMIT REVISED, ELECTRONICALLY SIGNED AND |
| | SEALED CALCULATIONS. |
| | 2) THE SUBMITTED FLORIDA ENERGYGAUGE COMPLIANCE REPORT |
| | IS THE 2017 VERSION, HOWEVER THE PROPOSED PROJECT WAS |
| | SUBMITTED UNDER THE 2014 CODE. PLEASE PROVIDE A REPORT |
| | USING THE FIFTH EDITION 2014 SOFTWARE. PLEASE NOTE THE |
| | FOLLOWING: A) THE REPORT IS MISSING COMPLIANCE DATA FOR |
| | OAU-1, 2, 3, & 4. B) THE DESIGN EFFICIENCIES FOR THE |
| | SYSTEMS APPEAR TO BE LISTED AS SEER INSTEAD OF EER. |
| | 3) COMMISSIONING OF THE MECHANICAL SYSTEMS IS REQUIRED |
| | PER SECTION C408.2 FBC-14 ENERGY CONSERVATION. SUBMIT A |
| | COMMISSIONING PLAN AS OUTLINED IN SECTION C408.2.1 AND |
| | DESCRIBED IN SECTIONS C403.2.2- C408.2.3.3. PLEASE NOTE |
| | THAT A COPY OF THE COMMISSIONING REPORT SHALL BE |
| | SUBMITTED FOR REVIEW AT FINAL INSPECTION. |
| | |
| | 4) IN ACCORDANCE WITH TABLE 403.3 MINIMUM VENTILATION |
| | CALCULATIONS FOR OUTDOOR AIR AND EXHAUST AIR ARE |
| | REQUIRED FOR ALL ROOMS AND SPACES. PLEASE PROVIDE A |
| | SCHEDULE ON THE PLAN THAT INDICATES THE REQUIRED AND |
| | PROVIDED CFMS OF OUTDOOR AND EXHAUST AIR FOR ALL ROOMS |
| | AND SPACES. PLEASE INCLUDE AIR BALANCE CALCULATIONS |
| | 5) SMOKE CONTROL SYSTEMS: REFER TO SECTION 513 AND |
| | SUBMIT ALL RELATIVE DOCUMENTS INCLUDING: |
| | A) SECTION 513.3. SPECIAL INSPECTION AND TEST |
| | REQUIREMENTS. |
| | B) SECTION 513.4- 513.4.6. RATIONAL ANALYSIS |
| | C) SECTION 513.5. SMOKE BARRIER CONSTRUCTION. |
| | D) SECTION 513.6. PRESSURIZATION METHOD. |
| | 6) SMOKE CONTROL EQUIPMENT SUBMITTALS SHALL BE REVIEWED |
| | AND APPROVED BY THE ENGINEER(S) OF RECORD AND SHALL |
| | INCLUDE: |
| | A) SECTION 513.10.2 & 513.10.5: PRESSURIZATION AND |
| | EXHAUST FANS. |
| | B) SECTION 513.10.2: DUCTS. |
| | C) SECTION 513.10.4: AUTOMATIC DAMPERS- FSD'S, FD'S, |
| | MOTORIZED O/A. |
| | 7) REFER TO SECTION 513.11 POWER SYSTEMS: THE STANDBY |
| | POWER SOURCE AND IT'S TRANSFER SWITCHES DO NOT APPEAR |
| | TO BE VENTILATED TO AND FROM THE EXTERIOR, AND THE |
| | GENERATOR ROOM DOES NOT APPEAR TO BE FULLY ENCLOSED IN |
| | 1-HOUR FIRE RATED BARRIERS- SEE SHEETS AS-101, LS-101, |
| | A-101, M-101, E-201, E-301. THESE PLANS APPEAR TO |
| | INDICATE THE GENERATOR ROOM OPEN INTO THE ADJACENT |
| | APARTMENT BUILDING ENCLOSED GARAGE. PLEASE NOTE THAT |
| | THE 1ST FLOOR AND SITE PLANS FOR THE ADJACENT APARTMENT |
| | BUILDING (PERMIT #17110075) DO NOT SHOW THE GENERATOR |
| | ROOM AT THE COMMON WALL BETWEEN THE BUILDINGS. |
| | 8) M-101: LABEL THE GENERATOR ROOM AND MATCH THE ROOM |
| | SIZE AND CONFIGURATION WITH THE FLOOR PLAN DRAWING |
| | A-101. PROVIDE COMPLETE DRAWINGS THAT DEPICT THE |
| | GENERATOR IN THE ROOM WITH ALL WORKING CLEARANCES PER |
| | MANUFACTURER'S SPECIFICATIONS. SHOW THE LOCATIONS OF |
| | THE RADIATOR EXHAUST, THE MAKEUP AIR OPENING, AND THE |
| | ENGINE EXHAUST PIPE. PROVIDE EXHAUST PIPE DETAILS |
| | INCLUDING TYPE AND SIZE OF PIPE, LENGTH OF RUN AND |
| | TERMINATION LOCATION WITH REQUIRED CLEARANCES. SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR |
| | REVIEWED AND APPROVED BY THE EOR. |
| | 9) M-101: THE EXHAUST FROM THE EF-2 AND EF-3 CANNOT |
| | DISCHARGE INTO THE GENERATOR ROOM AND THE ENCLOSED |
| | GARAGE. PLEASE RELOCATE BOTH TERMINATIONS TO THE |
| | OUTDOORS- SECTION 501.3. |
| | 10) M-101: NO TEXT PROVIDED FOR REFERENCE NOTES #6, 7, |
| | 8, 9, & 10. |
| | 11) M-101: IDU-L1-3 APPEARS TO BE RETURNING AIR FROM |
| | THE KITCHEN AND RECIRCULATING IT INTO THE DINING ROOM |
| | WHICH IS PROHIBITED PER SECTION 403.3.2.1(3). |
| | 12) M-101: DUCT SMOKE DETECTORS SHALL BE INSTALLED IN |
| | THE RETURN AIR SYSTEMS OF IDU'S- L1-1, L1-2, L1-3, |
| | L2-3, L2-4, L3-2, & L3-3- SECTION 606.2.1. |
| | 13) M-101: MULTIPLE FIRE DAMPERS MISSING FOR DUCTS |
| | PENETRATING THE FIRE-RATED WALLS AT THE FIRE COMMAND |
| | ROOM, FUTURE LAUNDRY, AND LINEN CHUTE ROOM- SECTION |
| | 607.5.2. |
| | 14) M-101: IT DOESN'T APPEAR ADEQUATE O/A IS BEING |
| | PROVIDED TO THE BRANDING/FLEX-SPACE. THE PLAN IS |
| | INDICATING ONLY 490 CFMS FOR THIS LARGE AREA. PLEASE |
| | SEE COMMENT #4 ABOVE AND PROVIDE O/A CALCULATIONS. |
| | 15) M-101: IT APPEARS THAT THE TRANSFER DUCTS AT THE |
| | MENS AND WOMENS RESTROOMS ARE NOT POSITIONED PROPERLY |
| | ON THE PLAN. |
| | 16) M-101: SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE FOR THE FABRIC DUCT. |
| | PLEASE NOTE THAT NON-METALLIC DUCTS SHALL COMPLY WITH |
| | UL 181- SECTION 603.5. |
| | 17) M-101: CLARIFY HOW AIR IS BEING RETURNED TO |
| | IDU-L2-5 SUPPLYING THE GUEST REGISTRATION AREA. |
| | 17) M-101 & A-101.1: THERE ARE MANY IDU'S AND EF'S |
| | LOCATED ABOVE GYPSUM CEILINGS. SHOW LOCATIONS OF |
| | DIMENSIONED ACCESS PANELS ON THE PLAN AND PROVIDE |
| | CONSTRUCTION DETAILS. PLEASE NOTE THAT NON-COMBUSTIBLE |
| | MATERIALS ARE REQUIRED FOR PANELS LOCATED ABOVE CEILING |
| | PLENUM SPACES. |
| | 18) M-101 & A-101.1: COMBUSTIBLE WOOD CEILINGS ARE |
| | SHOWN ON THE PLAN IN THE GUEST/LOBBY AREA . PLEASE |
| | VERIFY THAT THESE CEILINGS ARE NOT FORMING PART OF AN |
| | ABOVE CEILING PLENUM SPACE- SECTION 602.2.1. |
| | 19) M-101: MANY OF THE RIGID AND FLEXIBLE BRANCH DUCT |
| | SIZES ARE NOT SHOWN. IF USING THE SCHEDULE ON M-600, |
| | PLEASE CUT AND PASTE IT ON THIS AN ALL OTHER LAYOUT |
| | PLANS. |
| | 20) M-101: PLEASE LABEL THE OAU-3 INLET ON THE PLAN AND |
| | CLARIFY HOW THE 6070 CFMS OF AIR IS BEING EXHAUSTED PER |
| | THE SCHEDULE ON M-600. SHOW THE LOCATION OF THE EXHAUST |
| | INLET OR OUTLET ON THE PLAN. PLEASE NOTE THAT AN ERV IS |
| | REQUIRED FOR EXHAUST SIZED AT 100 % OF THE AMOUNT OF |
| | SUPPLY AIR- TABLE C403.2.6 FBC-14 ENERGY CONSERVATION. |
| | 21) M-101: COMBUSTION AIR IS REQUIRED FOR THE GAS-FIRED |
| | COOKING APPLIANCES IN THE KITCHEN. PLEASE SHOW HOW THE |
| | AIR WILL BE SUPPLIED AND PROVIDE CALCULATIONS IN |
| | COMPLIANCE WITH SECTION 304 FBC-14 FUEL GAS. |
| | ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR THE KITCHEN |
| | HOODS AND EXHAUST SYSTEMS, FIRE SUPPRESSION SYSTEMS, |
| | AND WALK-IN COOLERS AND FREEZERS. COMPLETE ENGINEERED |
| | DRAWINGS AND SUBMITTALS ARE REQUIRED FOR EACH PERMIT. |
| | PLEASE NOTE: A)WIND LOAD ENGINEERING FOR INSTALLATION |
| | OF THE ROOF TOP FANS WILL BE REQUIRED. B) THE MAKEUP |
| | AIR TEMPERATURE SHALL BE IN COMPLIANCE WITH SECTION |
| | 508.1.1 |
| | 22) M-101: PROVIDE AIR BALANCE CALCULATIONS. |
| | 23) M-101: CHASES FOR REFRIGERANT LINES NOT SHOWN. |
| | 24) M-102: KEF-1-1, 1-2, & 1-3 APPEAR TO BE WITHIN 10' |
| | OF THE BUILDING EXTERIOR WALLS, AND ALSO THE ADJACENT |
| | PARKING GARAGE WALL. REFER TO SECTION 506.3.13 AND |
| | PROVIDE CLEARANCE DISTANCE MEASUREMENTS ON THE PLANS. |
| | 25) M-102: OUTDOOR VENTILATION AIR IS REQUIRED FOR THE |
| | ELEVATOR LOBBY, THE EMPLOYEE BREAKROOM, AND THE |
| | ENGINEER'S SHOP- TABLE 403.3. |
| | 26) M-102: ROOF LADDER CONTINUATION OR TERMINATION FROM |
| | GENERATOR ROOM ON THE 1ST FLOOR IS NOT SHOWN. |
| | 27) M-102: SHOW THE LOCATION OF NOTE #12 ON THE PLAN- |
| | 16X8 O/A DUCT UP IN SHAFT. |
| | 28) M-102 & M-103: DAMPERS MISSING AT THE EXHAUST DUCT |
| | PENETRATIONS AT THE GUEST-BATHS/SHAFTS. |
| | 29) M-102 & M-103: CHASES FOR REFRIGERANT LINES NOT |
| | SHOWN. |
| | 30) M-103: SHOW THE LOCATION OF NOTE #12 ON THE PLAN- |
| | 16X8 O/A DUCT UP IN SHAFT. |
| | 31) M-104: THE SMOKE PURGE MAKEUP AIR DUCT IN THE |
| | INTERIOR STAIRWELL ENCLOSURE IS PROHIBITED PER SECTION |
| | 1022.5 FBC-14 BUILDING. |
| | 32) M-104: MULTIPLE MISSING FIRE/SMOKE DAMPERS AT O/A |
| | AND EXHAUST DUCTS PENETRATING THE FIRE-RATED SHAFTS. |
| | 33) M-105: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR |
| | THE POOL EQUIPMENT AND STORAGE ROOMS, AND INDICATE HOW |
| | MAKEUP AIR IS BEING PROVIDED FOR THE EXHAUST SYSTEMS. |
| | PROVIDE A LIST OF CHEMICALS AND MATERIALS TO BE STORED |
| | IN THE ROOMS, PROVIDE THEIR HAZARD CLASSIFICATIONS AND |
| | THE STORAGE QUANTITIES. SUBMIT MSDS SHEETS FOR ALL |
| | CHEMICALS AND MATERIALS. |
| | 34) M-105: IN ACCORDANCE WITH SECTION 510.4 THE EXHAUST |
| | FROM THE POOL EQUIPMENT ROOM AND ASSOCIATED STORAGE |
| | ROOMS SHALL RUN INDEPENDENTLY AND DIRECTLY TO THE |
| | EXTERIOR OF THE BUILDING. |
| | 35) M-105: PROVIDE COMBUSTION AIR CALCULATIONS FOR THE |
| | GAS-FIRED POOL HEATERS AND INDICATE HOW THE AIR WILL BE |
| | PROVIDED- SECTION 304 FBC-14 FUEL GAS. SUBMIT SPECS FOR |
| | ALL EQUIPMENT. |
| | 36) M-105: THE 14X14 DUCT IN THE INTERIOR STAIRWELL |
| | ENCLOSURE IS PROHIBITED PER SECTION 1022.5 FBC-14 |
| | BUILDING. |
| | 37) M-105: REFERENCE NOTES #2, 3, & 4 ARE MISLABELED ON |
| | THE PLANS. |
| | 38) M-105: MANY OF THE RIGID AND FLEXIBLE BRANCH DUCT |
| | SIZES ARE NOT SHOWN. IF USING THE SCHEDULE ON M-600, |
| | PLEASE CUT AND PASTE IT ON THIS AN ALL OTHER LAYOUT |
| | PLANS. |
| | 39) M-105: CHASES FOR REFRIGERANT LINES NOT SHOWN. |
| | 40) M-105: DUCT SMOKE DETECTORS SHALL BE INSTALLED IN |
| | THE RETURN AIR SYSTEMS OF IDU?S 8B3-1, 8B3-2, 8B3-3, & |
| | 8B4-7- SECTION 606.2.1. |
| | 41) M-105: PROVIDE A CALCULATION TO VERIFY THE 240 CFMS |
| | OF O/A PROVIDED TO THE LOBBY IS ADEQUATE FOR THAT AREA |
| | AND TO ALSO PROVIDE MAKEUP AIR FOR THE RESTROOMS- |
| | SECTION 601.2 |
| | 42) M-105 & A-104.1: THERE ARE MANY IDU'S AND EF'S |
| | LOCATED ABOVE GYPSUM CEILINGS. SHOW LOCATIONS OF |
| | DIMENSIONED ACCESS PANELS ON THE PLAN AND PROVIDE |
| | CONSTRUCTION DETAILS. PLEASE NOTE THAT NON-COMBUSTIBLE |
| | MATERIALS ARE REQUIRED FOR PANELS LOCATED ABOVE CEILING |
| | PLENUM SPACES. |
| | 43) M-105: PROVIDE AIR BALANCE CALCULATIONS. |
| | 44) M-600: THE O/A AND EXHAUST CFMS SHOWN IN SCHEDULE |
| | FOR THE OAU'S INDICATES THAT ERV'S ARE REQUIRED PER |
| | TABLE C403.2.6. PLEASE INDICATE IF THE OAU'S ARE |
| | EQUIPPED WITH THEM. |
| | 45) M-701 & M-702: SITE SPECIFIC WIND LOAD ENGINEERING |
| | IS REQUIRED FOR INSTALLATION OF ALL THE ROOFTOP |
| | MECHANICAL EQUIPMENT. PLEASE PROVIDE THE WIND LOAD |
| | DESIGN CRITERIA ON THE PLAN, AND COMPLETE DETAILS FOR |
| | ATTACHING THE EQUIPMENT AND CURBS TO THE ROOF |
| | STRUCTURE- SEE SECTION 1609 FBC-14 BUILDING. REFER TO |
| | TABLE 1509.6.5 FOR REQUIRED CLEARANCES FOR CONDENSERS |
| | TO BE MOUNTED ON STANDS, AND SUBMIT A FL. PRODUCT |
| | APPROVAL OR MIAMI-DADE NOA FOR THE STAND. |
| | 46) M-703: PLEASE PROVIDE A REFRIGERANT RISER DRAWING |
| | THAT IS AN ACTUAL DEPICTION OF THE PIPING RUNS AND |
| | LENGTHS. VERIFY THE RUNS ARE IN COMPLIANCE WITH |
| | MANUFACTURER'S SPECIFICATIONS. |
| | 47) M-704: PLEASE INCLUDE THE SMOKE PURGE SYSTEM IN THE |
| | SEQUENCE OF OPERATION. |
| | 48) P-401: SHOW THE LOCATIONS OF THE GAS WATER HEATER |
| | EXHAUST VENTS OUTLETS, AND THE COMBUSTION AIR INTAKES, |
| | AND SUBMIT MANUFACTURER'S SPECIFICATIONS FOR ALL |
| | COMPONENTS. IT APPEARS BY THE LOCATION OF THE APPLIANCE |
| | THAT THE EXHAUST VENT WILL HAVE TO RUN THROUGH ALL THE |
| | FLOORS OF THE BUILDING TO THE ROOF VIA A CHASE OR |
| | SHAFT. PLEASE PROVIDE DETAILS. |
| | 49) REQUIRED SUBMITTALS: SMOKE CONTROL FANS, AC STANDS |
| | AND RTU CURBS, FAN CURBS, EXHAUST AND AIR INTAKE |
| | LOUVERS, FIRE DAMPERS AND FIRE/SMOKE DAMPERS, DUCT |
| | SMOKE DETECTORS, GENERATOR, FIRE WRAPPING, CO2 SENSORS, |
| | FABRIC DUCTWORK, GAS DRYERS, AND GAS-FIRED WATER |
| | HEATERS AND FLUE VENTS. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |