| 2018-03-09 15:20:01 | 2ND REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION |
| | CODES |
| | PERMIT #17110860 |
| | 3/9/18 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) SHEET M1.3: THE REVISED PLAN INDICATES COMPLIANCE IN |
| | TERMS OF EXHAUST VENTILATION CAPACITY FOR THE GOLF CART |
| | PARKING GARAGE, HOWEVER THE SEQUENCE OF OPERATION FOR |
| | THE EXHAUST FANS HAS NOT BEEN CLARIFIED. PLEASE NOTE |
| | THAT SECTION 502.4.2 REQUIRES CONTINUOUS VENTILATION TO |
| | LIMIT HYDROGEN CONCENTRATION, AND SECTION 502.4.3 |
| | REQUIRES THE VENTILATION SYSTEM TO BE SUPERVISED BY |
| | |
| | AN APPROVED CENTRAL, PROPRIETARY OR REMOTE STATION |
| | SERVICE OR SHALL INITIATE AN AUDIBLE AND VISUAL SIGNAL |
| | AT A CONSTANTLY ATTENDED ON-SITE LOCATION. PLEASE |
| | PROVIDE ADDITIONAL NOTES AND DETAILS. |
| | |
| | 2) M2.1: EXHAUST FANS EF-0-1 AND EF-7 ARE REQUIRED TO |
| | DISCHARGE TO THE OUTDOORS- SECTION 501.3. THE PLAN |
| | SHOWS THE FANS DISCHARGING ONTO THE GARAGE. |
| | |
| | 3) M2.5 & A.105: PLEASE PROVIDE ENLARGED ARCHITECTURAL |
| | AND STRUCTURAL DETAILS FOR THE PROPOSED NEW ROOF LADDER |
| | NEEDED FOR ACCESS TO AHU-1-8A AND AHU-1-8B. |
| | |
| | 4) M5.1: THE WIND LOAD ENGINEERING FOR THE RTUIS IS |
| | INCOMPLETE. PLEASE SHOW HOW THE UNIOTS WILL BE ATTACHED |
| | TO THE CURBS, AND SUBMIT THE NOA FOR THE THYBAR CURB |
| | WITH SHOP DRAWING APPROVAL BY THE EOR. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |