| Date |
Text |
| 2018-04-06 12:10:40 | 1. NOT SATISFIED. SHEET A1-1-1 IS DIFFERENT THAN SHEET |
| | A1-1-2 , PLEASE ADJUST ALL DRAWINGS TO REFLECT THE SAME |
| | INFORMATION. SHEET A1-1-1 INDICATES THE STAIR ENDING |
| | NORTH OF THE PROJECTION OF THE PLANTER (DRAWING NOT |
| | DIMENSION THEREFORE CONFIRMATION NOT POSSIBLE BY |
| | STAFF), IT SEEMS AN ACCEPTABLE CONDITION, BUT DIMENSION |
| | DRAWING NEEDED TO CONFIRM. - 1/17/18- A MINIMUM 8' |
| | CLEAR SIDEWALK SHALL BE PROVIDED AROUND THE PROJECT. |
| | THE MAIN STAIR AT THE CORNER OF FLAGLER DRIVE AND |
| | BANYAN BLVD IS ENCROACHING TOO MUCH INTO THE CLEAR |
| | SIDEWALK PATH. ONE FOOT OF THE TREE GRATE CAN BE |
| | COUNTED TOWARDS THE CLEAR PATH IF NEEDED. |
| | 2. NOT SATISFIED - 1/18/19. ARTIFICAL GRASS IS NOT |
| | ALLOWED IN ANY LOCATION VISIBLE FROM THE PUBLIC RIGHT |
| | OF WAY. |
| | 3. NOT SATISFIED. IN ADDITION TO THE ELEMENTS MENTIONED |
| | IN PREVIOUS REVIEW, THE AMOUNT OF WINDOWS ALONG BANYAN |
| | BLVD HAS ALSO BEEN REDUCED. PLEASE SUBMTI INFORMATION |
| | TO CONFIRM COMPLIANCE WITH THE MINIMUM 50% TRANSPARENCY |
| | REQUIRED ALONG BANYAN BOULEVARD. -1/17/18 .ORIGINAL |
| | APPROVAL INCLUDED AN EYE BROW ELEMENT ALONG BANYAN |
| | BOULEVARD AND A METAL MESH ELEMENT AT THE CORNER OF |
| | NARCISSUS AVE AND BANYAN BLVD TO ENHANCE THE BLANK |
| | FACADE. THOSE ELEMENTS SHALL NOT BE REMOVED AS THEY |
| | WERE APPROVED AS PART OF THE ARCHITECTURAL DESIGN |
| | PRESENTED TO THE DAC. |
| | 4. SP1-01 STILL SHOWS DOOR, PLEASE ADJUST ALL DRAWING.- |
| | 1/17/18 -ORIGINAL APPROVAL DID NOT INCLUDE A MECHANICAL |
| | DOOR ALONG NARCISSUS AVENUE. IF THE DOOR SHALL REMAIN |
| | AT THAT LOCATION ITS APPEARANCE SHALL BE IMPROVED. |
| | ORIGINAL APPROVAL DEPICTS A WINDOW. |
| | 5. ACCORDING TO CURRENT SIGN REGULATION, ONLY SIGNAGE |
| | ALLOWED IS FOR TENANT ON FIRST FLOOR.-1/17/18 -SIGNAGE |
| | IS NOT INCLUDED UNDER THIS PERMIT. SECODN FLOOR TENANT |
| | IS NOT ALLOWED TO HAVE SIGN ON BUILDING FACADE. A |
| | PEDESTRIAN BLADE SIGN WILL BE PERMITTED. |
| | 6. SATISFIED - 1/17/18-ROOF TOP TERRACE DOES NOT |
| | INCLUDE ANY VEGETATION OR ANY ROOF SCREENING FOR |
| | MECHANICAL EQUIPMENT. HOTEL ROOMS WILL HAVE A DIRECT |
| | VIEW OF MECHANICAL EQUIPMENT. |
| | 7. APPLICANT'S RESPONSE ACKNOWLEDGED. STAFF WILL |
| | DISCUSS WITH ENG. DEPARTMENT FOR FINAL |
| | DETERMINATION.-1/17/18 -PLEASE PROVIDE A PEDESTRIAN |
| | CROSSING AT NARCISSUS AVE AND 2ND STREET TO CONNECT |
| | WITH THE PARK ON THE NORTH SIDE. |
| | 8. OK- 1/17/18- CAN THE PROPOSED SWITCH CABINET ALONG |
| | NARCISSUS BE RELOCATED AWAY FROM THE PEDESTRIAN PATH OF |
| | TRAVEL? |
| | 9. DETAIL OF SPECIFIC LIGHT FIXTURE ARE NEEDED. |
| | -1/19/18.PLEASE PROVIDE SPECS FOR LIGHT FIXTURES AND |
| | POLES ON ROW. FLAGLER POLES AND FIXTURES SHALL MATCH |
| | THE WATERFRONT DESIGN, AND OTHER STREETS SHALL FOLLOW |
| | THE DOWNTOWN STANDARD. IF ANY COBRA HEADS EXISTS, THEY |
| | SHOUDL BE REMOVED AND REPLACED BY DECORATIVE. |
| | 10.OK- 1/17/18- STAFF RECOMMENDS NARCISSUS AVE TO BE |
| | DESIGNED AS A CURBLESS ROAD TO FACILITATE THE |
| | RELATIONSHIP BETWEEN THE HOTEL AND THE PARK. |
| | 11. OK - 1/17/18. ADA RAMPS AT CORNRES SHALL BE |
| | DESIGNED TO REDUCED PEDESTRIAN DISTANCE AT CROSSING. |
| | STAFF SUGGEST DOING TWO RAMPS INSTEAD OF ONE. |
| | 12. OK- 1/17/18. PLEASE COORDINATE WITH THE CITY FOR |
| | THE REDESIGN OF THE FLAGLER DRIVE AND BANYAN BOULEVARD |
| | INTERSECTION. CHANGES MAY AFFECT PROJECT STARS. |
| | 13. CITY RECORDS DO NOT SHOW A SEPARATE LANDSCAPE |
| | PERMIT FOR ANY OF THE 3 PROJECTS ASSOCIATED WITH THE |
| | OLD CITY HALL SITE. PLEASE SUBMIT A SEPARATE LANDSCAPE |
| | PERMIT. 1/19/18. A SEPARATE LANDSCAPE PERMIT SHALL BE |
| | SUBMITTED FOR THE PROJECT. AN ENGINEERING PERMIT WILL |
| | BE REQUIRED FOR THE LANDSCAPE ON THE ROW. |
| | 14. OK - 1/17/18.FURTHER DISCUSSION IS NECESSARY FOR |
| | THE DESIGN OF THE PUBLIC PARK. |
| | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439. |