| 2018-05-22 16:17:53 | ****PLAN REVIEW COMMENTS**** |
| | |
| | STEVEN KENNEDY, CBO |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH, FL 33402 |
| | 561-805-6710 [email protected] |
| | |
| | FBC FLORIDA BUILDING CODE 2014 5TH EDITION W/2010 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION / FRC FLORIDA RESIDENTIAL CODE |
| | 2015 5TH EDITION |
| | AZOLA WEST PALM BEACH 17110788 |
| | |
| | APPROVED WITH PROVISO CONDITIONS: |
| | |
| | OK DEFFERED SUBMITALS AS LISTED MUST BE PROVIDED FOR |
| | REVIEW AND WORK MAY NOT PROCEED UNTIL APPROVED: |
| | W. P. B. 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS |
| | WHICH ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE |
| | REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF |
| | RECORD PRIOR TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| | FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR |
| | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, |
| | SHOP DRAWINGS ETC.. |
| | 1) WINDOWS/DOORS |
| | 2) SHORING & RE-SHORING |
| | 3) ROOFING SYSTEMS |
| | 4) TRUSS DRAWINGS |
| | |
| | 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | |