| Date |
Text |
| 2018-04-09 11:40:35 | ****PLAN REVIEW COMMENTS**** |
| | |
| | ART LANGE BUILDING PLANS EXAMINER |
| | |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH, FL 33402 |
| | 561-805-6718 [email protected] |
| | |
| | FBC FLORIDA BUILDING CODE 2014 5TH EDITION W/2010 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION / FRC FLORIDA RESIDENTIAL CODE |
| | 2015 5TH EDITION |
| | |
| | AZOLA WEST PALM BEACH 17110779 TYPE "A" |
| | |
| | SECOND REVIEW: |
| | |
| | 1. OK. ADDRESSED. |
| | |
| | 2. ELEVATION CERTIFICATE PROVIDED IS NOT COMPLETE. |
| | SECTION D HAS NOT BEEN SEALED BY A SURVEYOR, ENGINEER |
| | OR AN ARCHITECT. |
| | |
| | 3. RECEIVED SOILS EXPLORATION REPORT. |
| | SEE SECTION 4.2 REGARDING FOUNDATION RECOMMENDATIONS. |
| | SEE FOOTINGS ON S 3.1.1 THESE SHOULD AT LEAST MEET THE |
| | MINIMUM RECOMMENDED BY THE GEOTECHNICAL ENGINEERING |
| | RECOMMENDATIONS. |
| | REPORT NOT SIGNED AS REVIEWED BY THE ENGINEER OF |
| | RECORED. |
| | |
| | PROVIDE A SOILS EXPLORATION REPORT. FBC 1803 FL |
| | 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR |
| | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, |
| | SHOP DRAWINGS ETC... |
| | |
| | 4. PARTIALLY ADDRESSED. |
| | |
| | I HAVE PROVIDED THE THRESHOLD INSPECTOR AGREEMENT TO A |
| | AND J PERMITTING AND HAVE NOT RECEIVED THE COMPLETED |
| | AGREEMENT WITH THE SUPPORTING DOCUMENTS. |
| | |
| | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME' |
| | OF INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE |
| | RESUME MUST BE ACCOMPANIED BY ALL CERTIFICATES AS |
| | SPECIFIED HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE |
| | WILL REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, |
| | AN INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES |
| | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST |
| | MEETING THE ABOVE CRITERIA. |
| | |
| | E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY |
| | FOR THIS TYPE OF CONSTRUCTION. |
| | |
| | F) NOTE FOR PAPER PLANS 3 SETS OF DOCUMENTS ARE |
| | REQUIRED. FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, |
| | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING |
| | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE |
| | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR |
| | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN |
| | COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR |
| | THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE |
| | IN BLACK & WHITE.. |
| | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING |
| | CODE, CHAPTER 1, ADMINISTRATION, 110.3.7 THRESHOLD |
| | BUILDINGS, GUIDELINES AND POLICIES FOR PROJECTS |
| | CONCERNING SPECIAL INSPECTORS. |
| | NOTE: E-MAILED JOSE SAUMELL ARCHITECT OF RECORD |
| | [email protected] ON 11/28/17 AN ATTACHMENT |
| | WITH THE GUIDELINES AND POLICIES FOR PROJECTS |
| | CONCERNING THRESHOLD INSPECTORS. |
| | |
| | 17. PARTIALLY ADDRESSED. STILL LISTED ON KEY NOTES ON |
| | PAGE A 3.2 F-1 AND F-6 |
| | |
| | COMBUSTIBLE MATERIALS ON THE EXTERIOR SIDE OF EXTERIOR |
| | WALLS. SEE OUTLOOKERS USED AT GABLE ENDS AND DECORATIVE |
| | FOAM MEDALLIONS. |
| | |
| | FBC 1406.2.1 TYPE I, II, III AND IV CONSTRUCTION. |
| | ON BUILDINGS OF TYPE I, II, III AND IV CONSTRUCTION, |
| | EXTERIOR WALL COVERINGS SHALL BE PERMITTED TO BE |
| | CONSTRUCTED OF COMBUSTIBLE MATERIALS, COMPLYING WITH |
| | THE FOLLOWING LIMITATIONS: 2. COMBUSTIBLE EXTERIOR WALL |
| | COVERINGS SHALL BE LIMITED TO 40 FEET (12 192 MM) IN |
| | HEIGHT ABOVE GRADE PLANE. |
| | |
| | 18. PARTIALLY ADDRESSED. LOCATIONS OF THE DUCT FOUND. |
| | PROVIDE RATING ON THE HORIZONTAL DUCT AND THE ASSEMBLY |
| | USED. IF FLAME BAR IS USED THIS WOULD BE REVIEWED AS |
| | ALTERNATIVE MATERIALS AND METHODS. THE DUCT RATING |
| | SHALL BE THE SAME AS THE SHAFT IS SERVICES. |
| | |
| | PLEASE SHOW COMPLIANCE WITH THE FOLLOWING CODE SECTION. |
| | |
| | FBC 3004.2 LOCATION OF VENTS. |
| | VENTS SHALL BE LOCATED AT THE TOP OF THE HOISTWAY AND |
| | SHALL OPEN EITHER DIRECTLY TO THE OUTER AIR OR THROUGH |
| | NONCOMBUSTIBLE DUCTS TO THE OUTER AIR. NONCOMBUSTIBLE |
| | DUCTS SHALL BE PERMITTED TO PASS THROUGH THE ELEVATOR |
| | MACHINE ROOM, PROVIDED THAT PORTIONS OF THE DUCTS |
| | LOCATED OUTSIDE THE HOISTWAY OR MACHINE ROOM ARE |
| | ENCLOSED BY CONSTRUCTION HAVING NOT LESS THAN THE |
| | FIRE-RESISTANCE RATING REQUIRED FOR THE HOISTWAY. HOLES |
| | IN THE MACHINE ROOM FLOORS FOR THE PASSAGE OF ROPES, |
| | CABLES OR OTHER MOVING ELEVATOR EQUIPMENT SHALL BE |
| | LIMITED AS NOT TO PROVIDE GREATER THAN 2 INCHES (51 MM) |
| | OF CLEARANCE ON ALL SIDES. |
| | |
| | 23. CONFIRM MEASUREMENTS AROUND KITCHEN ISLAND |
| | CABINETS. IT APPEAR THEY ARE UNDER THE MINIMUM OF 40 |
| | INCHES. SEE FAIR HOUSING DESIGN MANUAL PAGE 7.8. |
| | |
| | |
| | WHEN RESUBMITTING, PLEASE COMPLETE A RESUBMITTAL FORM: |
| | |
| | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| | THIS FORM IS ALSO AVAILABLE AT THE BUILDING DIVISION. |
| | |
| | WHEN RESUBMITTING, SWAP OUT SHEETS WHICH HAVE CHANGED |
| | SO THAT THERE ARE TWO COMPLETE, COLLATED SETS OF PLANS |
| | READY FOR PERMIT ISSUANCE. OLD SHEETS ARE TO BE |
| | RETAINED IN THE PERMIT APPLICATION PACKAGE (SEPARATE |
| | FROM THE PERMIT SETS) AND MARKED *OLD SHEETS* OR |
| | *VOID*. PLEASE KEEP BOTH SETS OF OLD VOIDED SHEETS IN |
| | THE PERMIT PACKAGE. |
| | |
| | A RESPONSE LETTER INDICATING HOW EACH ITEM WAS |
| | ADDRESSED WILL HELP TO EXPEDITE PLAN REVIEW. |
| | ******************************************************* |
| | *************************** |
| | |
| | PROVISOS: |
| | |
| | A) W. P. B. 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS |
| | WHICH ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE |
| | REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF |
| | RECORD PRIOR TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| | FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR |
| | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, |
| | SHOP DRAWINGS, TRUSS ENGINEERING ETC.. |
| | |
| | LISTED ON PAGE LS 0.0 |
| | UNDER GROUND UTILITIES |
| | ROOF PRODUCT APPROVALS |
| | DOOR AND WINDOW SHOP DRAWINGS AND PRODUCT APPROVALS |
| | DRAINAGE SHOP DRAWINGS |
| | ELEVATOR SHOP DRAWINGS |
| | SHORING SUBMITTAL |
| | FIRE SPRINKLER AND ALARM SHOP DRAWINGS |
| | EXTERIOR FRAMING SHOP DRAWINGS |
| | RAILING SHOP DRAWINGS |
| | TRUSS ENGINEERING |
| | |
| | SWIMMING POOL UNDER A SEPARATE PERMIT. |
| | |
| | 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | B) LISTED ON DEFFERED SUBMITTALS |
| | SUBMIT 3 SETS OF TRUSS ENGINEERING APPROVED BY THE |
| | DESIGNER OF RECORD. |
| | |
| | C) WELDED OR BOLTED CONNECTIONS |
| | THE CONTRACTOR IS REQUIRED TO PROVIDE WELD PROCEDURE |
| | SPECIFICATIONS & WELDER OPERATOR PERFORMANCE |
| | QUALIFICATION RECORDS IN ACCORDANCE WITH THE REFERENCED |
| | STANDARDS AT TIME OF INSPECTION. |
| | 2014 FBC-B 2204.1 WELDING |
| | 2014 FBC-B 2204.2 BOLTING. |
| | |
| | D) THE OWNER AS NEEDED WILL PROVIDE ADAPTABLE PORTABLE |
| | RAMPS AT SLIDING PATIO DOORS. RAMPS WILL BE AVAILABLE |
| | IN THE MANAGEMENT OFFICE AT ALL TIMES. |
| | |