| 2018-03-13 05:41:16 | 1) THERE ARE TWO DIFFERENT GAS DRAWINGS IN THIS |
| | SUBMITTAL PACKAGE. ONE SHOWS AN EXISTING GAS SYSTEM AND |
| | GAS METER TO WHICH THE GAS LINE FOR THE GENERATOR IS |
| | CONNECTED AND THE OTHER SHOWS A NEW GAS METER DEDICATED |
| | TO THE GENERATOR. IN ADDITION, THE GAS PERMIT |
| | APPLICATION DESCRIPTION OF WORK STATES "TIE INTO |
| | EXISTING NG METER FOR GENERATOR INSTALL." ALSO, THE |
| | RESPONSE LETTER FROM APS STATES THAT THIS IS A NEWW |
| | NATURAL GAS LINE FROM THE METER TO THE GENERATOR ONLY. |
| | NO OTHER APPLIANCES ARE ON THIS LINE WITH THE |
| | GENERATOR. AT THIS POINT, I HAVE NO IDEA WHAT IS BEING |
| | DONE OR HOW DUE TO THE CONFLICTING PLANS AND |
| | INFORMATION THAT HAS BEEN SUBMITTED. CLARIFY. |
| | 2) REMOVE ALL OLD PLANS AND DOCUMENTS FROM THIS |
| | SUBMITTAL AND SUBMIT TWO COMPLETE SETS OF PLANS THAT |
| | CLEARLY REFLECT THE SCOPE OF PROPOSED WORK TO BE DONE. |
| | WPB AMEND. TO FBC SEC. 107.1, 107.2.1. |
| | 3) THE REGULATOR SPECIFICATIONA THAT HAVE BEEN |
| | SUBMITTED ARE FOR SERVICE REGULATORS WHICH ARE |
| | INSTALLED BY THE GAS SUPPLIER. ARE YOU USING THESE AS |
| | THE 2ND STAGE REGULATOR AT THE GENERATOR? CLARIFY. |
| | 4) SHEET P1 IS BECOMING DIFFICULT TO READ IN AREAS WITH |
| | SMALL PRINTING. SUBMIT TWO COPIES OF A CLEAR AND |
| | LEGIBLE PLAN. WPB AMEND. TO FBC SEC. 107.2.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |