| Date |
Text |
| 2017-12-20 06:38:49 | 12/20/2017 2ND GAS REVIEW**DENIED88 |
| | |
| | 1) PLEASE PROVIDE SIZING TABLE FOR .5 LB SCH 40 PIPE |
| | GALV.SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL |
| | GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 |
| | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, |
| | G2412.8, G2413.1, G2413.2, & G2413.3 |
| | |
| | 2) YOU ARE CONNECTING INTO AN EXISTING GAS SYSTEM AND |
| | ADDING BTU LOAD. YOU ARE REQUIRED TO SHOW POINT OF |
| | CONNECTING INTO THE EXISTING SYSTEM AND PIPE SIZING |
| | FROM METER TO SAID POINT OF CONNECTING WHILE LISTING |
| | ALL EXISTING BTU LOAD ON THAT SYSTEM. THE PLANS |
| | INDICATE AN EXISTING GAS METER. THE BTU LOAD OF THE |
| | EXISTING GAS SYSTEM MUST BE ADDED INTO THE TOTAL BTU |
| | LOAD ON THE SYSTEM TO ENSURE THE EXISTING SYSTEM IS |
| | PROPERLY SIZED. IF UNDERSIZED, THE EXISTING SYSTEM MUST |
| | BE REDONE TO ENSURE A SAFE OPERATING SYSTEM. SUBMIT A |
| | GAS PIPING RISER DIAGRAM THAT SHOWS THE TYPE OF |
| | EXISTING APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE |
| | PIPE SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| | EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, |
| | 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, |
| | G2413.2, G2413.3. |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |