2017-11-29 09:08:111ST REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS:
  
 1. ACCESSIBILITY PLEASE SHOW COMPLIANCE WITH THE
 FOLLOWING: FBC ACC
  
 609.4 POSITION OF GRAB BARS.
 GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL POSITION,
 33 INCHES MINIMUM AND 36 INCHES MAXIMUM ABOVE THE
 FINISH FLOOR MEASURED TO THE TOP OF THE GRIPPING
 SURFACE.VERTICAL GRAB BARS ARE NOT APPROVED.
  
 604.5.1 SIDE WALL.
 THE SIDE WALL GRAB BAR SHALL BE 42 INCHES LONG MINIMUM,
 LOCATED 12 INCHES MAXIMUM FROM THE REAR WALL AND
 EXTENDING 54 INCHES MINIMUM FROM THE REAR WALL.
  
 604.5.2 REAR WALL.
 THE REAR WALL GRAB BAR SHALL BE 36 INCHES LONG MINIMUM
 AND EXTEND FROM THE CENTERLINE OF THE WATER CLOSET 12
 INCHES MINIMUM ON ONE SIDE AND 24 INCHES MINIMUM ON THE
 OTHER SIDE.
  
 604.2 LOCATION.
 THE WATER CLOSET SHALL BE POSITIONED WITH A WALL OR
 PARTITION TO THE REAR AND TO ONE SIDE. THE CENTERLINE
 OF THE WATER CLOSET SHALL BE 16 INCHES MINIMUM TO 18
 INCHES MAXIMUM FROM THE SIDE WALL OR PARTITION,
  
 606.3 HEIGHT.
 LAVATORIES AND SINKS SHALL BE INSTALLED WITH THE FRONT
 OF THE HIGHER OF THE RIM OR COUNTER SURFACE 34 INCHES
 MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. THIS IS
 UNCLEAR ON THE PLAN
  
 2. SHT. 110-A1.0 ON THE FLOOR PLAN IT APPEARS THE CLEAR
 FLOOR SPACE FOR THE WATER CLOSET IN WOMENS BATHROOM IS
 ENCROACHING OVER INTO THE KITCHEN WHERE THE 3 COMP SINK
 IS LOCATED PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 3. PLEASE LABEL THE CLEAR FLOOR SPACE IN BATHROOMS. PER
 WPB AMEND TO FBC 107.2.1
  
 4. SHT 120-A1.1 ON THE ENLARGED KITCHEN PLAN THE ICE
 CUBER B4 IS NOT LABELED PLEASE CLARIFY. PER WPB AMEND
 TO FBC 107.2.1
  
 5. SHT. 120-A1.1 K10 IS THE HOT FOOD TABLE ELECTRIC OR
 GAS IT DOES NOT INDICATE ON THE EQUIPMENT SCHEDULE
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 6. SHT. 120-A1.1 K21 IS NOT LISTED ON THE EQUIPMENT
 SCHEDULE PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 7. SHT. 190-P1.0 ON THE WATER ISOMETRIC THE AIR
 CHAMBERS ARE NOT APPROVED THEY SHALL COMPLY WITH FBC PL
 604.9 WATER HAMMER.
 THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM
 SHALL BE CONTROLLED TO REDUCE THE POSSIBILITY OF WATER
 HAMMER. A WATER-HAMMER ARRESTOR SHALL BE INSTALLED
 WHERE QUICK-CLOSING VALVES ARE UTILIZED. WATER-HAMMER
 ARRESTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE
 MANUFACTURER?S INSTRUCTIONS. WATER-HAMMER ARRESTORS
 SHALL CONFORM TO ASSE 1010.
  
 8. SHT. 190-P1.0 ON THE WATER ISOMETRIC IT SHOWS THE
 TANKLESS WATER HEATER ABOVE THE MOP AND HAND SINK ON
 THE FLOOR PLAN IT SHOWS ABOVE THE 3 COMP SINK PLEASE
 CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 9. SHT. 190-P1.0 ON THE WATER ISOMETRIC PLEASE SHOW
 SIZE OF ALL DROPS. PER WPB AMEND TO FBC 107.2.1
  
 10. SHT. 190-P1.0 ON THE WATER ISOMETRIC VALVES ARE
 REQUIRED AT EACH DROP AND THE MAIN FEED COMING INTO THE
 BUILDING .PER FBC PL 606.1 LOCATION OF FULL-OPEN
 VALVES.
 FULL-OPEN VALVES SHALL BE INSTALLED IN THE FOLLOWING
 LOCATIONS: 2. ON THE WATER DISTRIBUTION SUPPLY PIPE AT
 THE ENTRANCE INTO THE STRUCTURE. 5. ON THE TOP OF EVERY
 WATER DOWN-FEED PIPE IN OCCUPANCIES OTHER THAN ONE- AND
 TWO-FAMILY RESIDENTIAL OCCUPANCIES.
  
 11. SHT. 190-P1.0 ON THE WATER ISOMETRIC A BACK FLOW IS
 REQUIRED ON THE SUPPLY FOR ICE MACHINES, BEVERAGE
 DISPENSERS AND WATER FILTERS. PER FBC PL 608.3,
 608.16.1 AND 608.16.10
  
 12. SHT. 190-P1.0 THE NOTE UNDER PLUMBING GENERAL NOTES
 STATES THE GREASE WASTE PIPE SHALL BE CPVC BUT THE
 ISOMETRIC SHOWS THE BRANCH PIPING AS PVC PLEASE
 CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 13. THE 3 COMP SINK SHALL BE INDIRECTLY WASTED TO FLOOR
 SINK. PER FBC PL 802.1.1
  
 14. THE BRANCH DRAIN FOR THE DRINKING FOUNTAIN SHALL
 CONNECT TO BUILDING DRAIN DOWN STREAM OF THE BATHROOM
 GROUPS. PER FBC PL 912.1
  
 15. THE GLASS WASHER IN BAR AREA, THE FLOOR DRAINS IN
 THE BATHROOMS AND DRAINS FROM THE ICE MACHINES SHALL
 NOT DISCHARGE INTO THE GREASY WASTE SYSTEM. PER FBC PL
 1003.2
  
 16. PLEASE PROVIDE SPECIFICATIONS FOR THE GREASE
 INTERCEPTOR. PER WPB AMEND TO FBC 107.2.1
  
 17. PLEASE PROVIDE A PIPING DETAIL FOR GREASE
 INTERCEPTOR SHOWING TWO WAY CLEANOUTS ON INLET AND
 OUTLET ALSO TEST PORT ON OUTLET. PER WPB UTILITIES DEPT
  
 18. PLEASE PROVIDE SIZING CALCULATIONS FOR THE GREASE
 INTERCEPTOR. PER FBC PL 1003.2
  
 19. SHT. 210-P2.1 DETAIL A1 SHOWS A 2" WATER MAIN
 BREAKING DOWN TO 11/2" THE WATER ISOMETRIC ON SHT-P1.0
 ONLY SHOWS A 3/4" MAIN PLEASE CLARIFY. PER WPB AMEND TO
 FBC 107.2.1
  
 20. IF A WATER FILTER SYSTEM IS BEING USED PLEASE SHOW
 ON WATER ISOMETRIC AND PROVIDE A PIPING DETAIL. PER WPB
 AMEND TO FBC 107.2.1
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved