| 2018-05-27 14:54:04 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | COMMENTS FROM PREVIOUS LIST: |
| | |
| | 22. GENERAL COMMENT, FBC 107, SOME FMEP COMMENTS ARE |
| | ALSO FBC B REQUIREMENTS. A BUILDING REVIEW ON THESE |
| | ITEMS WILL BE DONE UPON RESUBMITTAL. |
| | |
| | 23-28. OK |
| | |
| | 29. FBC 107, 6-A6.4.1, A 2 HOUR HORIZONTAL SHAFT WALL |
| | SYSTEM IS SHOWN AND REFERS TO DETAILS 13 AND 14 ON |
| | A10.0.1. DETAIL 14 SPECS "1 HOUR RATED SHAFTWALL |
| | ASSEMBLIES". SHAFT IS TO BE 2 HOUR, A HORIZONTAL |
| | ASSEMBLY IS TO BE SPECIFIED RATHER THAN A WALL |
| | ASSEMBLY. PROVIDE LISTING WHICH ADDRESSES USE OF U415 |
| | UTILIZED IN A HORIZONTAL ORIENTATION OR REVISE DETAIL. |
| | |
| | 3RD REVIEW, RESPONSE LETTER STATES THAT UL U497 WAS |
| | ADDED AND HAS HORIZONTAL ASSEMBLIES. PLEASE SEE THE |
| | DETAIL AT THIS WEBSITE: |
| | |
| | HTTP://DATABASE.UL.COM/CGI-BIN/XYV/TEMPLATE/LISEXT/1FRA |
| | ME/SHOWPAGE.HTML?NAME=BXUV.U497&CCNSHORTTITLE=FIRE-RESI |
| | STANCE+RATINGS+-+ANSI/UL+263&OBJID=1074330896&CFGID=107 |
| | 3741824&VERSION=VERSIONLESS&PARENT_ID=1073984818&SEQUEN |
| | CE=1 |
| | |
| | UL U ASSEMBLIES ARE FOR WALLS (VERTICAL). I WAS UNABLE |
| | TO LOCATE THE ASSEMBLY WHI694-0300.2; PLEASE PROVIDE. |
| | |
| | PLEASE SEND A PROPOSED DETAIL VIA EMAIL. DETAIL TO |
| | COMPLY WITH FBC B 717.3.1, 713.4, 703.2.1 (ALSO 713.14, |
| | 909.21.3 IF APPLICABLE). PLEASE CONTACT ME TO DISCUSS. |
| | THIS REQUIREMENT WAS CONFIRMED WITH A FBC ISSUED |
| | DECLARATORY STATEMENT. |
| | |
| | 30-35. OK |
| | |
| | 36. FBC B 403.4, 907.2.13.1, 907.3.3, 907.3.4, |
| | AUTOMATIC SMOKE DETECTION TO BE IN ACCORDANCE WITH THIS |
| | SECTION. FIRE ALARM IS UNDER A SEPARATE PERMIT WHICH IS |
| | NOT REVIEWED BY BUILDING. PLEASE REVISE PLAN TO NOTE |
| | COMPLIANCE. |
| | |
| | ARCHITECT'S RESPONSE IS THAT THEY PREFER THAT THE FIRE |
| | ALARM DRAWINGS ARE REVIEWED AT THIS TIME. PLEASE REVISE |
| | THE FOLLOWING: |
| | |
| | SHEET FA1.0.0, THE FIRE ALARM LEGEND AND OTHER TEXT ON |
| | THE PAGE ARE TOO LIGHT TO BE LEGIBLE. |
| | SHEET FA1.1.1A, FBC B 970.2.13.1.1(1), A SMOKE DETECTOR |
| | IS REQUIRED IN THE TRANSFORMER VAULT. |
| | THE GRAPHIC IN THE EMERGENCY SWITCH GEAR ROOM WITH TEXT |
| | R/F IS NOT ON THE LEGEND BUT IS SIMILAR TO THE GRAPHIC |
| | FOR "HEAT DETECTOR SENSOR BASE"; CLARIFY. WHAT IS R/F? |
| | DOES THIS DEVICE MEET THE REQUIREMENT IN FBC B |
| | 907.2.13.1.1? |
| | GRAPHICS ARE NOT CLEAR. SEE FA1.3.1A, SEE STAIR #2 ON |
| | FIRST FLOOR (AND OTHER LOCATIONS), CLARIFY WHAT S IN A |
| | PLAIN SQUARE DEPICTS. ALSO CLARIFY WHY THE EXIT |
| | PASSAGEWAYS/EXIT CORRIDORS DO NOT HAVE ANY DEVICES; ARE |
| | THE EXEMPTED? |
| | HOW WILL THE REQUIREMENTS OF FBC B 908.7.1 BE MET? |
| | |
| | IT IS POSSIBLE THAT, IF FIRE PROTECTION ENGINEER |
| | CONTACTS ME TO ADVISE HOW THESE ISSUES WILL BE |
| | ADDRESSED WHEN THE FIRE ALARM PERMIT IS SUBMITTED, THIS |
| | CAN BE A PROVISO ITEM. |
| | |
| | 37. FBC B 403.5.3, COMPLIANCE NOT CLEAR, PLEASE ADVISE |
| | WHERE STAIRWAY DOOR LOCKING IS ADDRESSED, OR REVISE |
| | PLAN TO SHOW COMPLIANCE. |
| | |
| | RESPONSE STATES THAT E3.0.0 FIRE COMMAND ROOM HAS A |
| | DOOR UNLOCKING DEVICE; PLEASE HAVE ENGINEER ADVISE AS |
| | TO WHERE THIS CAN BE FOUND. IT DOES NOT APPEAR TO BE |
| | ONE OF THE "FIRE COMMAND ROOM KEYNOTES". |
| | |
| | RESPONSE LETTER ALSO STATES THAT ACCESS CONTROL |
| | DRAWINGS 840-849 INDICATE WHICH DOORS AND THE CONTROLS |
| | FOR THESE DOORS TO LOCK AND UNLOCK. THESE PAGES ARE NOT |
| | DESIGNED BY AN ARCHITECT OR ENGINEER AND CANNOT BE USED |
| | TO DEMONSTRATE CODE COMPLIANCE. ALL DOORS ARE REQUIRED |
| | TO RELEASE. |
| | |
| | IT IS POSSIBLE THAT, IF FIRE PROTECTION ENGINEER |
| | CONTACTS ME TO CLARIFY, THIS CAN BE A PROVISO ITEM. |
| | |
| | 38. FBC B TABLE 705.8, CLARIFY HOW <15% WAS DETERMINED |
| | FOR THE WALL WHICH OPENS TO ALLOW HOTEL ACCESS. |
| | |
| | 3RD REVIEW; RESPONSE WILL BE DISCUSSED WITH BUILDING |
| | OFFICIAL AND ABO. WALL PERCENTAGE CALCULATIONS ARE DONE |
| | BASED ON THE WALL PORTION WHICH IS AFFECTED (PORTION |
| | WHICH IS >3' FROM PROPERTY LINE). ON LS1.1 THE |
| | CALCULATION UTILIZES THE ENTIRE WALL LENGTH. IT IS |
| | POSSIBLE THAT THIS WILL BE PERMITTED DEPENDING ON |
| | OPENINGS ON THE ADJACENT PROPERTY IN THIS LOCATION. IF |
| | READILY AVAILABLE, PROVIDE THIS INFORMATION VIA EMAIL. |
| | IF NOT READILY AVAILABLE TO ARCHITECT, I CAN GET IT |
| | FROM THE HOTEL PERMIT DOCUMENTS. |
| | |
| | 39-40. OK |
| | |
| | 41. REGARDING THRESHOLD STATEMENT, RESPONSE IS THAT |
| | THIS IS ON EVERY STRUCTURAL PAGE. I APOLOGIZE FOR THE |
| | COMMENT NOT BEING CLEAR; I CANNOT LOCATE THIS STATEMENT |
| | ON THE ARCHITECTURAL PLANS. STATUTE STATES: |
| | |
| | W.P.B. AMENDMENT 110.3.7.4.4, FS553.79(7)(D): ALL PLANS |
| | FOR THE BUILDING WHICH ARE REQUIRED TO BE SIGNED AND |
| | SEALED BY THE ARCHITECT OR ENGINEER OF RECORD CONTAIN A |
| | STATEMENT THAT, TO THE BEST OF THE ARCHITECT'S OR |
| | ENGINEER'S KNOWLEDGE, THE PLANS AND SPECIFICATIONS |
| | COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND |
| | THE APPLICABLE FIRESAFETY STANDARDS AS DETERMINED BY |
| | THE LOCAL AUTHORITY IN ACCORDANCE WITH THIS CHAPTER AND |
| | CHAPTER 633. |
| | |
| | IF YOU ARE OF THE OPINION THAT THE ARCHITECT IS NOT |
| | REQUIRED TO INCLUDE THE THRESHOLD STATEMENT, PLEASE |
| | ADVISE AND I'LL DO FURTHER RESEARCH. ALL THRESHOLD |
| | BUILDINGS THAT I'VE REVIEWED HAVE INCLUDED THE |
| | STATEMENT BY BOTH ARCHITECT AND ENGINEER, EITHER ON ALL |
| | PAGES OR ON ONE PAGE. |
| | |
| | 42. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING |
| | PROVISOS: |
| | |
| | A. THIS PARCEL IS LOCATED IN A SPECIAL FLOOD HAZARD |
| | AREA; FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT |
| | APPLICATION 1979 FIRMS + 1' FREEBOARD; MINIMUM |
| | ELEVATION = 8.0' NGVD29, PROPOSED LOWEST FINISHED FLOOR |
| | ELEVATION = 9.0' NGVD29 |
| | A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS |
| | RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS |
| | (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT |
| | ISSUANCE) |
| | A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE |
| | OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE |
| | POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW |
| | A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS |
| | REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR |
| | TCO. |
| | |
| | B. BARN DOORS TO MAINTAIN THE 25SF LOUVERS, A1.3.1 AND |
| | OTHER SHEETS UP TO 3RD FLOOR, FOR COMPLIANCE WITH FBC B |
| | 1029.1, OK PER RB. |
| | |
| | C. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE |
| | FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS |
| | SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF |
| | RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR |
| | PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS, |
| | STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS |
| | REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW |
| | AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION. |
| | |
| | COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH |
| | PRESSURES SHOWN ON SHEET S0.0.5) |
| | FBC B 2403.2, SEMI FRAMELESS SHOWER ENCLOSURE |
| | ENGINEERING |
| | GLASS GUARDS DELEGATED ENGINEERING |
| | BALCONY ALUMINUM GUARDRAILS DELEGATED ENGINEERING |
| | POOL DECK GUARDRAILS DELEGATED ENGINEERING |
| | ALUCOBOND, PROVIDE PRODUCT APPROVALS AND SPEC SHEETS TO |
| | SHOW COMPLIANCE WITH FBC B 602.2, 1 |
| | TERRACORP, SPEC SHEETS SHOWING COMPLIANCE WITH |
| | REQUIREMENTS FOR NON COMBUSTIBLE BUILDINGS, |
| | INSTALLATION DETAILS FBC B 1609 |
| | DECORATIVE MESH COLUMN ENCLOSURE SHOWN ON A3.1.14 AND |
| | OTHER SHEETS, FBC B 602.2 (NON COMBUSTIBLE), 1609 |
| | (RESISTANCE TO WIND LOADS), PROVIDE SPEC SHEETS AND |
| | PRODUCT APPROVAL OR ENGINEERING TO SHOW COMPLIANCE |
| | |
| | D. FBC 1207.2, 1207.3, FIELD TESTING FOR STC/IIC WILL |
| | BE DONE, LVT ENVIROQUIET II (NOTE: 8" CONCRETE SLABS) |
| | WHISPER MAT CS IS PROPOSED BUT DOES NOT HAVE A FLAME |
| | SPREAD TEST FOR LVT. PLEASE CONTACT ME IN A FEW WEEKS; |
| | AT THIS TIME THE WHISPER MAT CS SPEC SHEET HAS BEEN |
| | VOIDED, BUT WE ARE CURRENTLY EVALUATING THIS AND OTHER |
| | UNDERLAYMENTS IN THIS APPLICATION. |
| | |
| | E. THE FOLLOWING ITEMS MAY REQUIRE A DETAIL OR SPEC |
| | SHEETS TO BE SUBMITTED SUBJECT TO INSPECTOR'S |
| | DISCRETION: |
| | FBC B 603, "WOOD SLATS AT ROOF FASCIA" IS SHOWN; |
| | PROVIDE SPEC SHEETS AT INSPECTION TO SHOW COMPLIANCE. |
| | FBC B 603.1 2-A8.3.3 AND OTHER LOCATIONS, IPE WOOD IS |
| | PROPOSED; PROVIDE SPEC SHEETS AT INSPECTION TO SHOW |
| | COMPLIANCE. |
| | FBC A FAIR HOUSING REQUIREMENT 2 ANSI 4.1-4.3.1, |
| | RECEPTION DESK IN RESIDENTS LOBBY TO COMPLY. |
| | FBC B 603.1(15), A3.1.11 AND OTHER SHEETS, KRINKLGLAS, |
| | SHOWN ON VARIOUS PAGES, TO COMPLY WITH CHAPTER 26 |
| | |
| | F. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE |
| | REQUIRED FOR: |
| | LIGHT POLES/SITE LIGHTING |
| | SWIMMING POOL |
| | FIRE ALARM |
| | FIRE SPRINKLER |
| | LOW VOLTAGE |
| | ACCESS |
| | LANDSCAPING |
| | IRRIGATION |
| | ALL OTHER ITEMS OTHER THAN BMEP |
| | |
| | G. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A |
| | PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL. |
| | |
| | H. AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED |
| | PRIOR TO C.O. |
| | |
| | I. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE |
| | SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE |
| | ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED |
| | PRIOR TO CONCRETE POUR. |
| | |
| | J. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS |
| | REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION. |
| | |
| | |
| | |