| 2018-02-13 14:50:08 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2014 5TH EDITION |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 |
| | 5TH EDITION |
| | FBC RE = FLORIDA RESIDENTIAL CODE 2014 5TH EDITION |
| | NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE |
| | FS = FLORIDA STATUTES |
| | |
| | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. |
| | |
| | PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED |
| | SATISFACTORILY HAVE BEEN NOTED AS ADDRESSED. ITEMS |
| | REMAINING HAVE FURTHER COMMENTS IN PARENTHESES. NEW |
| | COMMENTS FOLLOW THE PREVIOUS COMMENTS. |
| | |
| | 1) ADDRESSED. |
| | 2) ADDRESSED. |
| | 3) ADDRESSED. |
| | 4) ADDRESSED. |
| | 5) ADDRESSED. |
| | 6) ADDRESSED. |
| | 7) ADDRESSED. |
| | 8) ADDRESSED. |
| | 9) ADDRESSED. |
| | 10) ADDRESSED. |
| | 11) ADDRESSED. |
| | 12) ADDRESSED. |
| | 13) ADDRESSED. |
| | 14) ADDRESSED. |
| | 15) ADDRESSED. |
| | 16) ADDRESSED. |
| | 17) ADDRESSED. |
| | 18) ADDRESSED. |
| | 19) E4.0.0 PROVIDE SIGNAGE DETAILS FOR NUMBER OF |
| | SERVICE DISCONNECTS. IT APPEARS THAT THERE ARE TWO |
| | SERVICES IN QUESTION, A 120/208 SERVICE, AND A 277/480 |
| | SERVICE. PRIOR TO PLAN APPROVAL, A CORRECT |
| | IDENTIFICATION OF EACH SERVICE AND THE CORRESPONDING |
| | MAINS WILL NEED TO BE PROVIDED, WITH A MAXIMUM OF SIX |
| | SERVICE DISCONNECTS FOR EACH SERVICE PERMITTED. FIRE |
| | PUMP SERVICE WILL NEED TO BE INCLUDED AS ONE OF THE |
| | MAINS. NEC 230.2(E), 230.70(B), 230.71 (I SEE THE MAINS |
| | HAVE BEEN RENUMBERED, BUT I ALSO REQUESTED THE SIGNAGE |
| | DETAILS. PROVIDE LOCATIONS OF SIGNS FOR SERVICE AND THE |
| | DETAIL OF THE SIGNS ON PLAN. FBC 107.2.1 NEC 230.2) |
| | 20) E4.0.0 PROVIDE FULL LOAD CURRENT DETAIL OF FIRE |
| | PUMP MOTOR, AND ANY ADDITIONAL MOTORS OR EQUIPMENT |
| | ASSOCIATED, TO VERIFY CONDUCTOR SIZE FEEDING THIS |
| | EQUIPMENT IS ADEQUATE. NEC 695.6(B), NEC 110.3, 695.10 |
| | (I SEARCHED THE FIRE PROTECTION PLANS AND COULD NOT |
| | FIND THE SPECIFICATIONS THAT YOU STATED IN THE |
| | RESPONSE. PROVIDE AS PREVIOUSLY REQUESTED.) |
| | 21) E4.0.0 PROVIDE SPEC SHEETS FOR BUS DUCT SYSTEMS. |
| | NEC 110.3 (DEFERRED SUBMITTAL) |
| | 22) ADDRESSED. |
| | 23) ADDRESSED. |
| | 24) E5.0.0 IT APPEARS THAT PANELS MSB1, MSB2, MSB3 ARE |
| | MAIN LUG ONLY AND HAVE CAPACITY TO HAVE MORE THAN ONE |
| | MAIN BREAKER, WHICH WOULD ALLOW THE SERVICE TO EXCEED |
| | THE MAXIMUM NUMBER OF DISCONNECTS. PROVIDE |
| | CLARIFICATION. PROVIDE SPEC SHEETS FOR SWITCHGEAR. NEC |
| | 110.3, 230.71, 230.72; FBC 107.2.1 (AS THIS WILL AFFECT |
| | THE NUMBER OF MAINS, THIS INFORMATION IS REQUIRED AS |
| | PREVIOUSLY REQUESTED.) |
| | 25) PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FROM |
| | POWER COMPANY AND TO PANELS TO CONFIRM THE STATED AIC |
| | RATING OF PANELS IS ADEQUATE. NEC 110.9, 110.10 |
| | (REQUIRED FOR MARKING OF PANELS PER NEC 110.16 AND |
| | 110.24. IF YOU ARE COMFORTABLE WITH THE RATINGS OF THE |
| | EQUIPMENT, WE WILL ACCEPT THIS LETTER AND CALCULATIONS |
| | AS A DEFERRED SUBMITTAL WITH THE UNDERSTANDING THAT |
| | THIS MUST BE PROVIDED BEFORE ANY INSPECTIONS. PROVIDE |
| | NOTE ON PLAN TO THIS EFFECT.) |
| | 26) ADDRESSED. |
| | 27) ADDRESSED. |
| | 28) E5.0.2 IT APPEARS THAT PANELS EM AND EMG ARE MAIN |
| | LUG ONLY AND HAVE CAPACITY TO HAVE MORE THAN ONE MAIN |
| | BREAKER, WHICH WOULD ALLOW THE SERVICE TO EXCEED THE |
| | MAXIMUM NUMBER OF DISCONNECTS. PROVIDE CLARIFICATION. |
| | PROVIDE SPEC SHEETS FOR SWITCHGEAR. NEC 110.3, 230.71, |
| | 230.72; FBC 107.2.1 (AS THIS WILL AFFECT THE NUMBER OF |
| | MAINS, THIS INFORMATION IS REQUIRED AS PREVIOUSLY |
| | REQUESTED.) |
| | 29) E5.0.2 PANEL GEQH SHOWS A CIRCUIT FOR THE "JOCKEY |
| | PUMP". IS THIS PUMP ASSOCIATED WITH FIRE PUMP |
| | EQUIPMENT, OR SOMETHING ELSE? JOCKEY PUMP FOR FIRE PUMP |
| | EQUIPMENT MUST BE FED FROM SAME SERVICE AS THE FIRE |
| | PUMP. CLARIFY AND/OR CORRECT. FBC 107.2.1; NEC |
| | 695.4(B)(3) (RESPONSE TO THIS WAS CONFUSING AND STATED: |
| | "JOCKEY PUMP SEPARATE FROM FIRE PUMP CONTROLLER." |
| | SEPARATE AS IN SEPARATE LOCATION, OR SEPARATE SYSTEM. |
| | WHAT IS THIS JOCKEY PUMP FOR? IF IT IS PART OF THE FIRE |
| | PUMP SYSTEM, IT WILL NEED TO BE FED FROM THE FIRE PUMP |
| | CONTROLLER. PROVIDE MORE CLARIFICATION.) |
| | 30) ADDRESSED. |
| | 31)ADDRESSED. |
| | 32) ADDRESSED. |
| | 33) PROVIDE GRAPH/CALCULATION OF LIGHTING POWER |
| | ALLOWANCES PER THE FBC ENERGY CODE IN RELATION TO THE |
| | PROPOSED LIGHTING LOAD TO SHOW COMPLIANCE. FBC EC 405.5 |
| | (RESPONSE LETTER STATED THIS WAS PROVIDED, BUT I COULD |
| | NOT FIND ON PLAN. PROVIDE LOCATION.) |
| | 34) ADDRESSED. |
| | 35) ADDRESSED. |
| | |
| | NEW COMMENTS: |
| | |
| | 36) PANEL MSB1 SHOULD HAVE A CLEARANCE OF 72" BASED ON |
| | THE FACT THAT THERE IS ONLY ONE MEANS OF EGRESS FOR THE |
| | ELECTRICAL ROOM. IT APPEARS THAT PANEL MSB3 INVADES |
| | THIS SPACE AND MSB1 ONLY HAS APPROXIMATELY 59" OF |
| | CLEARANCE. PROVIDE CORRECTION. NEC 110.26(C)(2) |
| | 37) SHEET E3.0.1, DETAIL 6, IT APPEARS THAT THE 1200 |
| | AMP MAINS DO NOT HAVE THE REQUIRED CLEARANCE. PROVIDE |
| | CORRECTION. NEC 110.26(C)(2) |
| | |
| | END OF COMMENTS. |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES |
| | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | |
| | SINCERELY, |
| | |
| | JOHN PEARSON |
| | ELECTRICAL PLANS EXAMINER |
| | 561-805-6746 |
| | [email protected] |
| | |