| 2017-11-06 14:59:23 | ****PLAN REVIEW COMMENTS**** |
| | |
| | ART LANGE ? BUILDING PLANS EXAMINER |
| | 561-805-6667 [email protected] |
| | FBC FLORIDA BUILDING CODE 2014 5TH EDITION/ FRC FLORIDA |
| | RESIDENTIAL CODE 2015 5TH EDITION |
| | |
| | 1. FBC-107.1 GENERAL - FAC 61G15-23.002 - PROVIDE A |
| | TITLE BLOCK FOR THE ENGINEER OF RECORD CONSISTENT WITH |
| | THE REQUIREMENTS OF THIS SECTION, E.G.: FIRM NAME, |
| | LICENSE NUMBER, PHONE NUMBER...ETC. |
| | |
| | 2. THE LOCATION PLAN SHOWS WORK ALONG 35FT OF THE MAIN |
| | HOUSE. CLARIFY THE LOCATION AND TYPE OF WORK. THE |
| | ENGINEER'S REPAIR DETAIL APPEARS TO BE FOR ONE TRUSS. |
| | ARE YOU TURNING THIS AREA INTO A VAULTED CEILING? WILL |
| | THERE BE ANY ELECTRICAL RELOCATED? NEW DRYWALL OR |
| | INSULATION? |
| | |
| | INSUFFICIENT INFORMATION SUBMITTED FOR PLAN REVIEW. |
| | SUBMIT PLANS SHOWING THE LOCATIONS AND TYPE OF WORK TO |
| | BE COMPLETED. FBC 107.3.5 MINIMUM PLAN REVIEW CRITERIA |
| | FOR BUILDINGS. SEE THIS SECTION FOR THE REQUIRED |
| | INFORMATION REQUIRED FOR PLAN REVIEW. |
| | |
| | 3. THE $900 PERMIT VALUATION APPEARS TOO LOW. 109.3 |
| | BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF THE |
| | BUILDING OFFICIAL, THE CLAIMED VALUATION OF BUILDING, |
| | ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR |
| | PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE |
| | APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR |
| | BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO |
| | MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR |
| | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL. |
| | |
| | WHEN RESUBMITTING, PLEASE COMPLETE A RESUBMITTAL FORM: |
| | |
| | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| | |
| | THIS FORM IS ALSO AVAILABLE AT THE BUILDING DIVISION. |
| | WHEN RESUBMITTING, SWAP OUT SHEETS WHICH HAVE CHANGED |
| | SO THAT THERE ARE TWO COMPLETE, COLLATED SETS OF PLANS |
| | READY FOR PERMIT ISSUANCE. OLD SHEETS ARE TO BE |
| | RETAINED IN THE PERMIT APPLICATION PACKAGE (SEPARATE |
| | FROM THE PERMIT SETS) AND MARKED *OLD SHEETS* OR |
| | *VOID*. PLEASE KEEP BOTH SETS OF OLD VOIDED SHEETS IN |
| | THE PERMIT PACKAGE. |
| | A RESPONSE LETTER INDICATING HOW EACH ITEM WAS |
| | ADDRESSED WILL HELP TO EXPEDITE PLAN REVIEW. |
| | |