| 2018-01-31 06:35:05 | 1)SUBMIT A SEPARATE PERMIT APPLICATION FOR THE GAS AND |
| | A SEPARATE PERMIT APPLICATION FOR THE PLUMBING |
| | CONNECTIONS TO THE TANKLESS WATER HEATER INSTALLATION |
| | AND FOR THE NEW WATER LINES TO BE RUN. . WPB AMEND. TO |
| | FBC SEC. 107.1. 2ND REQUEST |
| | 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED ABOVE |
| | GROUND.TO THE TANKLESS WATER HEATER.WPB AMENDMENTS TO |
| | FBC SEC.107.2.1. |
| | 3) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| | 2413.3. 2ND REQUEST. |
| | 4) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| | SEC. G2413.2. 2ND REQUEST |
| | 5) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR THE TANKLESS WATER HEATER.THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC |
| | SEC.305.1, FBC-RES. SEC.G2408.1.2ND REQUEST. |
| | 6) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST |
| | 7) TWO COPIES OF A GAS SIZING TABLE FOR THE GAS HAS |
| | BEEN SUBMITTED BUT THERE IS NO STANDARD OR INFORMATION |
| | AS TO WHERE THIS TABLE IS FROM. THE TABLE NOTES IT IS |
| | FOR NATURAL GAS AND PROPANE BOTH WHICH DOES NOT |
| | CORRELATE WITH THE SIZING TABLE IN THE 2014 FBC-FUEL |
| | GAS CODE. CLARIFY. |
| | 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM ( PE PIPE) OR PLACE A NOTE |
| | ON THE PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) |
| | FROM THE GAS CODE OR OTHER STANDARD THAT WERE USED IN |
| | THE DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 |
| | FBC-FUEL GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES |
| | 402.4 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. |
| | G2412.4, G2412.8, G2413.1, G2413.2, & G2413.3. |
| | 9) SUBMIT TWO COPIES OF THE SIZING TABLE FOR THE PIPE |
| | BEING INSTALLED ABOVE GROUND.. COMPLY WITH 2014 |
| | FBC-FUEL GAS. |
| | 10) THREE COPIES OF A PLAN HAS BEEN SUBMITTED THAT HAS |
| | BEEN DONE BY AN ARCHITECT. PLANS SUBMITTED BY AN |
| | ARCHITECT SHALL BEAR A SEAL AND SIGNATURE COMPLYING |
| | WITH FL. ADMIN. CODE RULE 61G1-16.001 & 61G1-16.003. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |