| 2017-11-28 14:20:55 | 11/28/2017 GAS 3RD REVIEW **DENIED** |
| | |
| | |
| | COMMENTS FROM LAST REVIEW HAVE NOT BEEN ADDRESSED. IT |
| | IS RECOMMENED YOU CONTRACT THIS PLAN REVIEWER. A 4TH |
| | DENIED PLAN REVIEW WILL RESULT IN A 4XFEE FOR PLAN |
| | REVIEW |
| | |
| | |
| | 1) A PROPER GAS ISOMETRIC RISER DIAGRAM SHOWING THE TIE |
| | IN SIZE TO THE EXISTING SYSTEM WITH THE CONNECTION TO |
| | THE GAS VALVE, REGULATOR AND DRIP LEG AT THE GENERATOR. |
| | FBC 107.3.5.THE PLANS INDICATE AN EXISTING GAS METER. |
| | THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED |
| | INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE |
| | EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE |
| | EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE |
| | OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM |
| | THAT SHOWS THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD |
| | OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO |
| | EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH |
| | OF PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION |
| | |
| | 2) YOUR SIZING TABLE IS THE INCORRECT CHART. IT SHOULD |
| | BE SCH 40 METALLIC PIPING AT .5 LBS FGC 402.3. SUBMIT |
| | TWO COPIES OF THE APPLICABLE SIZING TABLES USED TO SIZE |
| | THE GAS SYSTEM OR PLACE A NOTE ON THE PLANS/DRAWINGS |
| | SPECIFYING WHICH SIZING TABLE(S) FROM THE GAS CODE OR |
| | OTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS GAS |
| | SYSTEM. REFER TO THE 2014 FBC-FUEL GAS SECS. 401.4, |
| | 401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 (37) |
| | OR 2014 FBC-RES. SEC. G2412.4, G2412.8, G2413.1, |
| | G2413.2, & G2413.3 |
| | |
| | |