| Date |
Text |
| 2018-02-06 12:10:36 | 3RD REVIEW: FBC 2014 5TH EDITION |
| | |
| | PLUMBING COMMENTS: PREVIOUS COMMENTS NOT COMPLIED. 3RD |
| | REQUEST |
| | |
| | 4. A DRINKING FOUNTAIN IS REQUIRED PER FBC PL TABLE |
| | 403.1 |
| | |
| | 5. A SERVICE SINK IS REQUIRED PER FBC PL TABLE 403.1 |
| | |
| | 7. THE DRAIN TO THE WASHING MACHINE SHALL BE 3" PER FBC |
| | PL 406.2 SHOW TRAP AND STAND PIPE ON ISOMETRIC DRAWING. |
| | |
| | 8. A LENT TRAP IS REQUIRED ON WASHING MACHINE DRAIN. |
| | PER FBC PL 1003.6 |
| | |
| | 12. THE SANITARY RISER DIAGRAM IS MISSING THE SIZE ON |
| | SOME OF THE PIPES PLEASE SIZE ALL PIPES ON RISER. PER |
| | WPB AMEND TO FBC 107.2.1 |
| | |
| | PREVIOUS COMMENTS : 2ND REQUEST |
| | |
| | 1. BACKFLOW PROTECTION IS REQUIRED FOR PEDICURE CHARS |
| | AND SHAMPO SINKS. PER FBC PL 608.2 |
| | |
| | 2. IT APPEARS THERE IS A 1/2" WATER MAIN SUPPLING SPACE |
| | THEN INCREASING SIZE TO 3/4 PLEASE CLARIFY. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 3. THE WATER HEATER HAS A INLET AND OUTLET PIPE OF 1/2" |
| | IS THIS CORRECT YOUR SUPPLING ALL FIXTURES WITH 1/2" |
| | HOT WATER SUPPLY. PLEASE CLARIFY. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 4. THE PEDICURE CHAIR DRAINS SHALL BE TRAPPED. PER FBC |
| | PL 1002.1 |
| | |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |