2017-12-19 18:16:142ND REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS: TO EXPEDITE THE APPROVAL OF THIS
 PERMIT I SUGGEST A MEETING TO GO OVER THE COMMENTS BE
 SCHEDULED SEE MY CONNECT INFO BELOW.
  
 1. RESPONSE TO COMMENT #1 DOES NOT COMPLY YOU AND I
 MIGHT UNDERSTAND BUT THE PERSON INSTALLING THE GRAB BAR
 MAY NOT IF THEY MEASURE 36" TO THE CENTER THE GRAB BAR
 WILL BE MOUNTED TO HIGH PLEASE PLACE NOT ON PLAN OR
 SHOW THE DIMENSION TO THE TOP OF GRAB BAR. PER WPB
 AMEND TO FBC 107.2.1 AND FBC ACC 609.4
  
 2. RESPONSE TO COMMENT #8 DOES NOT COMPLY, THE SPECS ON
 P-1 ARE VERY LIGHT AND WILL NOT SCAN FOR OUR RECORDS
 PLEASE PLACE A NOTE ON THE PLAN THAT STATES THAT THE
 MANUFACTURE SPECIFICATIONS AND INSTALLATION GUIDES
 SHALL BE ON THE JOBSITE FOR INSPECTIONS. PER WPB AMEND
 TO FBC 107.2.1 AND 107.2.1.4
  
 3. RESPONSE TO COMMENT #9 DOES NOT COMPLY, THE DETAIL
 ON P-3 FOR DENTAL UNIT IS ILLEGIBLE AND CONFUSING, IF
 THIS IS A MANUFACTURED UNIT THE NOTE ON THE PLAN FOR
 SPECIFICATIONS ON JOBSITE FOR INSPECTION WILL SUFFICE,
 IF NOT PLEASE PROVIDE A DETAIL THAT IS CLEAR AND HAS
 PIPE SIZES AND TYPE OF PIPE ON IT. PER WPB AMEND TO FBC
 107.2.1 AND 107.2.1.4
  
 4. THE EXHAUSTS FROM A VACUUM PUMP SERVING A VACUUM
 (FLUID SUCTION) SYSTEM SHALL DISCHARGE SEPARATELY TO
 OPEN AIR ABOVE THE ROOF. PLEASE SHOW ON P-4. PER FBC
 713.6
  
 5. RESPONSE TO COMMENT #11 DOES NOT COMPLY, THE
 DIRECTIONAL FITTINGS ARE STILL SHOWN WITH THE WRONG
 FLOW DIRECTION PLEASE CLARIFY. PER WPB AMEND TO FBC
 107.2.1
  
 6. RESPONSE TO COMMENT #12 DOES NOT COMPLY, PLEASE SHOW
 HOT WATER RETURN PIPING ON WATER ISOMETRIC DRAWING. PER
 WPB AMEND TO FBC 107.2.1
  
 7. SHT. P-2 THE SANITARY AND WATER ISOMETRIC DRAWINGS
 ARE VERY LIGHT ON THE PLAN SHEET WHEN SCANNED IN FO
 ROUR RECORDS WILL NOT SHOW UP AND THEY ARE DIFFICULT TO
 READ THEY TO COMPRESSED PLEASE DARKEN AND EXPAND THE
 DIAGRAMS. PER WPB AMEND TO FBC 107.2.1 AND 107.2.1.4
  
 8. SHT. P-2 THE NOTE ON THE PLAN THAT READS TRAP SEAL
 TIE INTO SANITARY FOR COMPRESSOR, DOES NOT MAKE ANY
 SENSE TO ME PLEASE CLARIFY. PER WPB AMEND TO FBC
 107.2.1
  
 9. SHT. P-2 THE SANITARY PIPING FOR THE EQUIPMENT ROOM
 IS UN CLEAR PLEASE EXPAND AND SHOW THE TRAP FOR THE MOP
 SINK. TRAP FOR THE FLOOR DRAIN AND THE TRAP FOR THE
 VACUUM TANK DRAIN ALSO THE VENT FOR THESE FIXTURE.
 912.1 AND FBC PL 1002.1, 901.2.1
  
 10. SHT. P-2 IT DOES NOT APPEAR THAT THE SANITARY
 SYSTEM HAS A VENT THAT EXTENDS TO THE OUTDOORS AT LEAST
 ONE VENT SHALL PLEAS CLEARLY SHOW ON THE ISOMETRIC
 DRAWING PER FBC PL 904.1
  
 11. SHT. P-2 THE WATER CLOSET SHOULD CONNECT TO THE WET
 VENTS OF EACH BATHROOM GROUP. PER FBC PL 912.1
  
 12. SHT. P-2 ON THE SANITARY RISER WHAT IS THE PIPING
 SHOWN WITH AN S THAT IS GOING UP TH THE NOTE ABOUT THE
 COMPRESSOR INTAKE IF IT IS THE PIPE FOR THE INTAKE
 REMOVE FROM SANITARY AND SHOW ON P-4 RISER. PER WPB
 AMEND TO FBC 107.2.1
  
 13. PLEASE CLARIFY ON PLAN TEMPERED WATER SHALL BE
 DELIVERED FROM LAVATORIES AND GROUP WASH FIXTURES
 LOCATED IN PUBLIC TOILET FACILITIES PROVIDED FOR
 CUSTOMERS, PATRONS AND VISITORS. TEMPERED WATER SHALL
 BE DELIVERED THROUGH AN APPROVED WATER-TEMPERATURE
 LIMITING DEVICE THAT CONFORMS TO ASSE 1070 OR CSA
 B125.3. PER FBC PL 416.5
  
 14. SHT. P-3 WHERE OR HOW WILL THE ECONOMY SELF
 CONTAINED WATER SYSTEM BE USED PLEASE CLARIFY. PER WPB
 AMEND TO FBC 107.2.1
  
 15. SHT. P-5 THE STATE MANUFACTURE SPECIFICATIONS FOR
 THE WATER HEATER ARE FOR SMALLER RESIDENTIAL MODELS
 UNDER THE NOTES IT LIST A 50 GAL RHEEM WATER HEATER
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 16. SHT. P-5 UNDER THE NOTES IT REFERENCES THE FBC 2010
 THIS PROJECT IS UNDER FBC 2014 5TH EDITION P[LEASE
 CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 17. PLEASE SHOW COMPLIANCE WITH FBC PL 607.3 THERMAL
 EXPANSION CONTROL.
 A MEANS OF CONTROLLING INCREASED PRESSURE CAUSED BY
 THERMAL EXPANSION SHALL BE PROVIDED WHERE REQUIRED IN
 ACCORDANCE WITH SECTIONS 607.3.1 AND 607.3.2.
  
 607.3.1 PRESSURE-REDUCING VALVE.
 FOR WATER SERVICE SYSTEM SIZES UP TO AND INCLUDING 2
 INCHES (51 MM), A DEVICE FOR CONTROLLING PRESSURE SHALL
 BE INSTALLED WHERE, BECAUSE OF THERMAL EXPANSION, THE
 PRESSURE ON THE DOWNSTREAM SIDE OF A PRESSURE-REDUCING
 VALVE EXCEEDS THE PRESSURE-REDUCING VALVE SETTING.
  
 607.3.2 BACKFLOW PREVENTION DEVICE OR CHECK VALVE.
 WHERE A BACKFLOW PREVENTION DEVICE, CHECK VALVE OR
 OTHER DEVICE IS INSTALLED ON A WATER SUPPLY SYSTEM
 UTILIZING STORAGE WATER HEATING EQUIPMENT SUCH THAT
 THERMAL EXPANSION CAUSES AN INCREASE IN PRESSURE, A
 DEVICE FOR CONTROLLING PRESSURE SHALL BE INSTALLED.
  
  
 18. SHT. P-5 THE DISCHARGE PIPING SERVING A PRESSURE
 RELIEF VALVE, TEMPERATURE RELIEF VALVE OR COMBINATION
 THEREOF SHALL DISCHARGE THROUGH AN AIR GAP LOCATED IN
 THE SAME ROOM AS THE WATER HEATER. PER FBC PL 504.6
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved