| 2018-03-01 17:48:54 | 03/01/2018 PLUMBING 2ND REVIEW**DENIED** |
| | |
| | 1) TANKLESS WATER HEATER RTEX-18 WOULD BE UNDERSIZED AS |
| | PER THE CHART PROVIDED @ 36 DEGREE HEAT RISE HOT WATER |
| | (110 DEGREES) WOULD NOT BE ABLE TO FLOW HOT WATER TO |
| | ALL FIXTURES AT FULL DEMAND AS REQUIRED IN FBC-R |
| | P2801.1 |
| | |
| | 2) SHT P 2.0 IS SHOWING A STORAGE TYPE 80 GALLON HOT |
| | WATER HEATER. PROVIDE MANUFACTURES SPECS SHEETS SHOWING |
| | WATER HEATER MEETS THE REQUIRED 1.96 E.F AS REQUIRED BY |
| | THE D.O.E (NAECA) STANDARD AS OF 04/15/2015. LIGHT DUTY |
| | COMMERCIAL HEATERS ARE PROHIBITED TO BE USED IN |
| | RESIDENTIAL OCCUPANCY. THE LARGEST NON-HEAT PUMP |
| | STORAGE WATER HEATER ALLOWED IS 55 GALLONS. |
| | |
| | 3) SHT P-1.0 NOTE #8 PLEASE INPUT HAMMER ARRESTORS |
| | REQUIRED AT ALL QUICK CLOSING VALVES. FBC-R P2903.5. |
| | |
| | 4) YOUR WATER DISTRIBUTION ISOMETRIC DRAWING IS SHOWING |
| | C.P.V.C BUT SHT. P-1.0 NOTE #2 AND #6 CALL OUT MATERIAL |
| | TO BE COPPER ONLY. FBC 105.1 |
| | |
| | 5) BACKFLOW SHOWING ON SHT. P-1.0 FOR POOL AUTOFILL |
| | PLEASE ADD NOTE SEPARATE PERMIT REQUIRED AND BACKFLOW |
| | TO BE LEAD-FREE. ALSO A BACKFLOW (RPZ) IS REQUIRED AT |
| | THE WATER METER TO PROTECT THE CITY?S WATER SUPPLY PER |
| | WPB CROSS CONNECTION MANUAL. |
| | |
| | 6) SANITARY ISOMETRIC ON SHT. P-2.0 IS STILL SHOWING A |
| | FLAT, DRY VENT ON THE SHOWER OF THE UN-NUMBERED |
| | BATHROOM ON THE 1ST FLOOR. FBC-R P3104.3 |
| | |
| | 7) SHT. P-1.0 CONFLICTS WITH SHT. P-2.0 IN REGARDS TO |
| | BOTH WATER AND SANITARY PIPE SIZING. P-1.0 STILL SHOWS |
| | 2? PVC TO TOILET WHICH IS UNDERSIZED. FBC-R P3005.4.1 |
| | |
| | 8) PLEASE SHOW P-TRAPS ON ALL TUBS, BIDETS, AND SHOWER |
| | AS REQUIRED IN FBC-R P3201.6 |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |