| 2017-10-04 06:08:39 | 1) THE SUBMITTED PICTURE AND SITE SURVEY DO NOT MATCH. |
| | IT APPEARS THE TANKS ARE LOCATED ON OPPISITE SIDES OF |
| | THE OTHER. CLARIFY. |
| | 2) IT APPEARS THAT THE TANKS ARE PROPOSED TO BE LOCATED |
| | UNDERNEATH A POWER LINE.NFPA 58-11 SECS. |
| | 6.4.5.12.PROVIDE A NOTE INDICATING COMPLIANCE OR MOVE |
| | THE TANKS. |
| | 3) SUBMIT TWO COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS AND INSTALLATION FOR THE FIRST STAGE AND |
| | SECOND STAGE REGULATORS. WPB AMENDMENTS TO FBC SEC. |
| | 107.2.1. |
| | 4) REGULATORS INSTALLED OUTDOORS SHALL BE APPROVED FOR |
| | OUTDOOR USE. NFPA 58-11 SEC.6.8.1.5. SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS. |
| | 5) ON THE REQUSTED REGULATOR SPECIFICATIONS IDENTIFY |
| | THE SPECIFIC MODEL(S) OF THE REGULATOR(S) BEING |
| | INSTALLED ON EACH SET OF SPECIFICATIONS. WPB AMEND. TO |
| | FBC SEC. 107.2.1. |
| | 6) SUBMIT ADDITIONAL INFORMATION ON THE INSTALLATION OF |
| | THE PE PIPE. IS IT BEING INSTALLED UNDER A VEHICULAR |
| | WAY? THE MINIMUM BURIAL DEPTH OF THE PE PIPING SHALL |
| | COMPLY WITH NFPA 58-11 SEC. 6.9.4.2. INDICATE THE |
| | MINIMUM BURIAL DEPTH ON THE PLANS. |
| | 7) NFPA 58-11 - SEC. 6.8.1.6 THE POINT OF DISCHARGE |
| | FROM THE REQUIRED PRESSURE RELIEF DEVICE ON REGULATED |
| | EQUIPMENT (REGULATOR & RELIEF VALVE ON TANK) INSTALLED |
| | OUTSIDE OF BUILDINGS OR OCCUPIABLE STRUCTURES IN FIXED |
| | PIPING SYSTEMS SHALL BE LOCATED NOT LESS THAN 3 FT (1 |
| | M) HORIZONTALLY AWAY FROM ANY BUILDING OR OCCUPIABLE |
| | STRUCTURE OPENING BELOW THE LEVEL OF DISCHARGE. SHOW |
| | THE LOCATION OF ANY BUILDING OPENINGS BELOW THE LEVEL |
| | OF DISCHARGE. |
| | 8) NFPA 58 - SEC.6.8.1.7 THE POINT OF DISCHARGE SHALL |
| | ALSO BE LOCATED NOT LESS THAN 5 FT (1.5 M) IN ANY |
| | DIRECTION AWAY FROM ANY SOURCE OF IGNITION, OPENINGS |
| | INTO DIRECT-VENT (SEALED COMBUSTION SYSTEM) |
| | APPLIANCES, OR MECHANICAL VENTILATION AIR INTAKES.SHOW |
| | THE LOCATION OF ALL SOURCES OF IGNITION. |
| | 9) THE PROPOSED TANKS APPEAR TO BE NEAR A VEHICLE |
| | TRAFFIC LANE. THE TANKS SHALL BE PROVIDED WITH |
| | PROTECTION AGAINST UNINTENDED VEHICLE CONTACT, I.E |
| | BOLLARDS.PLEASE PROVIDE PROTECTION FROM VEHICLE |
| | CONTACT. |
| | 10) NFPA 58 - SEC. 6.8.2 SELECTION OF PRESSURE |
| | REGULATORS. - A TWO-STAGE REGULATOR SYSTEM, AN INTEGRAL |
| | TWO-STAGE REGULATOR, OR A 2 PSI REGULATOR SYSTEM SHALL |
| | BE REQUIRED ON ALL FIXED PIPING SYSTEMS THAT SERVE 1 /2 |
| | PSIG (3.4 KPAG) APPLIANCE SYSTEMS [NORMALLY OPERATED AT |
| | 11 IN. WATER COLUMN (2.7 KPAG) PRESSURE]. |
| | 11) NFPA 58-11 SEC. 6.9.4.6 - AN ELECTRICALLY |
| | CONTINUOUS CORROSION-RESISTANT TRACER WIRE (MINIMUM AWG |
| | 14) OR TAPE SHALL BE BURIED WITH THE POLYAMIDE OR |
| | POLYETHYLENE PIPE TO FACILITATE LOCATING THE PIPE. |
| | (A) ONE END OF THE TRACER WIRE SHALL BE BROUGHT ABOVE |
| | GROUND AT A BUILDING WALL OR RISER. |
| | (B) THE TRACER WIRE OR TAPE SHALL NOT BE IN DIRECT |
| | CONTACT WITH THE POLYAMIDE OR POLYETHYLENE PIPE. |
| | 12) INDICATE ON THE PLANS IF THE CONTAINERS WILL BE |
| | FILLED ONSITE OR IF IT WILL BE A CHANGOUT PLAN OF |
| | REPLACING THE EMPTY TANKS WITH FILLED TANKS. IF FILLING |
| | ONSITE, TRANSFER OPERATIONS SHALL COMPLY WITH NFPA |
| | 58-11 TABLE 6.5.3 FOR REQUIRED DISTANCES. |
| | |
| | ADDITIONAL COMMENTS MAY BE PROVIDED ON THE RE-SUBMITTAL |
| | OF THE ABOVE. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |