| Date |
Text |
| 2018-01-08 09:27:24 | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | PLUMBING COMMENTS: PREVIOUS COMMENTS NOT COMPLIED |
| | |
| | PARTIALLY COMPLIED 3. SHT. P-3 SANITARY ISOMETRIC |
| | DRAWING THE FLOOR DRAINS ARE NOT VENTED THEY SHALL |
| | COMPLY WITH FBC PL 901.2.1 THE VENTS THAT WERE ADDED |
| | APPEAR TO BE HORIZONTAL DRY VENTS WHICH ARE NON CODE |
| | COMPLIANT, ALL DRY VENTS SHALL CONNECT TO THE |
| | HORIZONTAL DRAIN ABOVE THE CENTERLINE OF THE PIPE AND |
| | RUN VERTICAL TO A POINT ABOVE THE FLOOD LEVEL RIM OF |
| | THE FIXTURES. FOR CLARIFICATION VENTS SHOULD CONNECT TO |
| | THE HORIZONTAL DRAIN AT A LOCATION WERE THEY CAN RUN UP |
| | INTO A VERTICAL WALL THEY CAN NOT CONNECT IN THE MIDDLE |
| | OF THE FLOOR. PER FBC PL 905.3 AND 905.4 |
| | |
| | PARTIALLY COMPLIED 4. SHT. P-3 SANITARY ISOMETRIC |
| | DRAWING THE EYE WASH IS NOT VENTED IT SHALL COMPLY WITH |
| | FBC PL 901.2.1 THE VENTS THAT WERE ADDED APPEAR TO BE |
| | HORIZONTAL DRY VENTS WHICH ARE NON CODE COMPLIANT, ALL |
| | DRY VENTS SHALL CONNECT TO THE HORIZONTAL DRAIN ABOVE |
| | THE CENTERLINE OF THE PIPE AND RUN VERTICAL TO A POINT |
| | ABOVE THE FLOOD LEVEL RIM OF THE FIXTURES. FOR |
| | CLARIFICATION VENTS SHOULD CONNECT TO THE HORIZONTAL |
| | DRAIN AT A LOCATION WERE THEY CAN RUN UP INTO A |
| | VERTICAL WALL THEY CAN NOT CONNECT IN THE MIDDLE OF THE |
| | FLOOR. PER FBC PL 905.3 AND 905.4 |
| | |
| | PARTIALLY COMPLIED 9. PLEASE SHOW COMPLIANCE WITH FBC |
| | PL 416.5 TEMPERED WATER FOR PUBLIC HAND-WASHING |
| | FACILITIES. |
| | TEMPERED WATER SHALL BE DELIVERED FROM LAVATORIES AND |
| | GROUP WASH FIXTURES LOCATED IN PUBLIC TOILET FACILITIES |
| | PROVIDED FOR CUSTOMERS, PATRONS AND VISITORS. TEMPERED |
| | WATER SHALL BE DELIVERED THROUGH AN APPROVED |
| | WATER-TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE |
| | 1070 OR CSA B125.3. TEMPERED WATER IS ONLY REQUIRED AT |
| | HAND WASHING LAVATORY,S IN THE BATHROOMS THE |
| | TEMPERATURE LIMITING DEVICE SHALL ONLY CONNECT THESE |
| | LAVATORY,S THE OTHER SINKS USED FOR CLEANING UTENSILS, |
| | EQUIPMENT AND THE FACULTY THEY SHALL BE SUPPLIED WITH |
| | HOT WATER WITH A TEMPERATURE ABOVE 110 DEQ. PER FBC PL |
| | 607.1 |
| | |
| | 10. PLEASE SHOW COMPLIANCE WITH FBC PL 606.1 LOCATION |
| | OF FULL-OPEN VALVES. |
| | FULL-OPEN VALVES SHALL BE INSTALLED IN THE FOLLOWING |
| | LOCATIONS: 5. ON THE TOP OF EVERY WATER DOWN-FEED PIPE |
| | IN OCCUPANCIES OTHER THAN ONE- AND TWO-FAMILY |
| | RESIDENTIAL OCCUPANCIES. |
| | |
| | 11. PLEASE SHOW COMPLIANCE WITH FBC PL 607.2 HOT OR |
| | TEMPERED WATER SUPPLY TO FIXTURES. |
| | THE DEVELOPED LENGTH OF HOT OR TEMPERED WATER PIPING, |
| | FROM THE SOURCE OF HOT WATER TO THE FIXTURES THAT |
| | REQUIRE HOT OR TEMPERED WATER, SHALL NOT EXCEED 50 FEET |
| | (15 240 MM). RECIRCULATING SYSTEM PIPING AND |
| | HEAT-TRACED PIPING SHALL BE CONSIDERED TO BE SOURCES OF |
| | HOT OR TEMPERED WATER. |
| | [E] 607.5 PIPE INSULATION. |
| | HOT WATER PIPING IN AUTOMATIC TEMPERATURE MAINTENANCE |
| | SYSTEMS SHALL BE INSULATED WITH 1 INCH (25 MM) OF |
| | INSULATION HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 BTU |
| | PER INCH/H ? FT2 ? ?F (1.53 W PER 25 MM/M2 ? K). THE |
| | FIRST 8 FEET (2438 MM) OF HOT WATER PIPING FROM A HOT |
| | WATER SOURCE THAT DOES NOT HAVE HEAT TRAPS SHALL BE |
| | INSULATED WITH 0.5 INCH (12.7 MM) OF MATERIAL HAVING A |
| | CONDUCTIVITY NOT EXCEEDING 0.27 BTU PER INCH/H ? FT2 ? |
| | ?F (1.53 W PER 25 MM/ M2 ? K). FOR CLARIFICATION ANY |
| | FIXTURE OVER 50' FROM THE WATER HEATER ARE REQUIRED TO |
| | BE ON A HOT WATER RECIRCULATING SYSTEM. PER FBC PL |
| | 607.2 |
| | |
| | 12. PLEASE SHOW COMPLIANCE WITH FBC PL 604.9 WATER |
| | HAMMER. |
| | THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM |
| | SHALL BE CONTROLLED TO REDUCE THE POSSIBILITY OF WATER |
| | HAMMER. A WATER-HAMMER ARRESTOR SHALL BE INSTALLED |
| | WHERE QUICK-CLOSING VALVES ARE UTILIZED. WATER-HAMMER |
| | ARRESTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| | MANUFACTURER?S INSTRUCTIONS. WATER-HAMMER ARRESTORS |
| | SHALL CONFORM TO ASSE 1010. PLEASE SHOW WATER-HAMMER |
| | ARRESTORS ON WATER RISER. |
| | |
| | 13. ANY EQUIPMENT CONNECTED TO THE POTABLE WATER SYSTEM |
| | SHALL HAVE A BACK FLOW ON IT PLEASE SHOW ON WATER |
| | RISER. FBC PL 608.3 . |
| | |
| | 14. PLEASE PROVIDE A RISER DIAGRAM FOR PROCESS PIPING |
| | AND STEAM PIPING. PER WPB AMEND TO FBC 107.3.5.1.3(13) |
| | FLAT DRAWINGS DO NOT COMPLY WITH THIS REQUIREMENT |
| | PLEASE PROVIDE PIPE SIZING AND THE TYPE OF PIPE ON THE |
| | RISER. |
| | |
| | NEW COMMENTS: |
| | |
| | 1. PLEASE SEPARATE THE SANITARY AND THE WATER ISOMETRIC |
| | DRAWING WITH THEM TOGETHER IT IS EXTREMELY DIFFICULT TO |
| | DETERMINE IF THEY ARE CODE COMPLIANT AND WILL NOT SCAN |
| | PROPERLY FOR OUR RECORD KEEPING. PER WPB AMEND TO FBC |
| | 107.2.1.4 |
| | |
| | 2. PLEASE SHOW PIPE SIZING, VALVES, AND ANY OTHER |
| | DEVICES ON THE WATER ISOMETRIC. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 3. TRAP PRIMERS ARE REQUIRED ON ALL FLOOR DRAINS TRENCH |
| | DRAIN AND FLOOR SINKS PLEASE SHOW IN THE ISO DRAWING. |
| | PER FBC PL 1002.4 |
| | |
| | SHALL COMPLY WITH MECHANICAL COMMENTS: |
| | 3) SHEET P3: SECOND REQUEST FOR THE MECHANICAL PLAN FOR |
| | THE DISTILLERY. THE RESUBMITTED PLAN DOES NOT INCLUDE |
| | THE STEAM PIPING FROM THE BOILER TO THE DISTILLERY |
| | TANKS. |
| | |
| | 4) IN RESPONSE TO COMMENT #S 6A & 6C, THE ENGINEER OF |
| | RECORD IS STATING THAT NO DATA SHEETS ARE AVAILABLE FOR |
| | THE DISTILLERY TANKS AND THAT THE TANKS AND THE |
| | PROCESSING EQUIPMENT ARE USED AND BEING RELOCATED TO |
| | THE NEW FACILITY. PLEASE SEE SECTION 101.9.1 WPB |
| | AMENDMENTS TO THE FBC. USED MATERIALS AND EQUIPMENT. |
| | |
| | "THE USE OF USED MATERIALS WHICH MEET THE REQUIREMENTS |
| | OF THIS CODE FOR NEW MATERIALS IS PERMITTED. USED |
| | EQUIPMENT AND DEVICES SHALL NOT BE REUSED UNLESS |
| | APPROVED BY THE BUILDING OFFICIAL." |
| | |
| | THE DISTILLERY TANKS AND EQUIPMENT ARE NOT APPROVED AT |
| | THIS TIME WITHOUT FURTHER EVIDENCE OF COMPLIANCE WITH |
| | THE GOVERNING TESTING AGENCY FOR DISTILLERY TANKS AND |
| | EQUIPMENT. DISTILLERY TANKS AND EQUIPMENT ARE NOT |
| | SPECIFICALLY ADDRESSED IN THE MECHANICAL CODE, HOWEVER |
| | IN ACCORDANCE WITH SECTION 1003.1 FBC-14 MECHANICAL: |
| | |
| | "ALL PRESSURE VESSELS SHALL BE IN ACCORDANCE WITH THE |
| | ASME BOILER AND PRESSURE VESSEL CODE, SHALL BEAR THE |
| | LABEL OF AN APPROVED AGENCY AND SHALL BE INSTALLED IN |
| | ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS." |
| | |
| | PRESSURE VESSEL DEFINITION - SCOPE |
| | |
| | THESE SCOPES ARE BASED ASME CODE SEC VIII DIV 1 |
| | THE VESSEL WITH MAXIMUM ALLOWABLE WORKING |
| | PRESSURE(MAWP) HIGHER THAN 15 PSI |
| | INSIDE DIAMETER TO BE HIGHER THAN 152 MM |
| | NO PIPING OR PIPING COMPONENT |
| | NO ROTATING OR RECIPROCATING EQUIPMENT |
| | NOT WATER VESSEL UP TO 300PSI OR 210?F |
| | NOT WITHIN THE SCOPE OF OTHER SECTIONS |
| | ALSO FOR GAS FIRED DOUBLE SHELL HEAT EXCHANGERS < 50 |
| | PSI |
| | NOT STEAM BOILERS WITH DIRECT FIRING |
| | NOT FOR HUMAN OCCUPANCY (PVHO) |
| | |
| | ADVISORY: PLEASE CONSULT WITH THE ALCOHOL AND TOBACCO |
| | TAX AND TRADE BUREAU (TTB) FOR DISTILLERY TESTING AND |
| | INSPECTION GUIDELINES. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |