2018-01-08 09:27:241ST REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS: PREVIOUS COMMENTS NOT COMPLIED
  
 PARTIALLY COMPLIED 3. SHT. P-3 SANITARY ISOMETRIC
 DRAWING THE FLOOR DRAINS ARE NOT VENTED THEY SHALL
 COMPLY WITH FBC PL 901.2.1 THE VENTS THAT WERE ADDED
 APPEAR TO BE HORIZONTAL DRY VENTS WHICH ARE NON CODE
 COMPLIANT, ALL DRY VENTS SHALL CONNECT TO THE
 HORIZONTAL DRAIN ABOVE THE CENTERLINE OF THE PIPE AND
 RUN VERTICAL TO A POINT ABOVE THE FLOOD LEVEL RIM OF
 THE FIXTURES. FOR CLARIFICATION VENTS SHOULD CONNECT TO
 THE HORIZONTAL DRAIN AT A LOCATION WERE THEY CAN RUN UP
 INTO A VERTICAL WALL THEY CAN NOT CONNECT IN THE MIDDLE
 OF THE FLOOR. PER FBC PL 905.3 AND 905.4
  
 PARTIALLY COMPLIED 4. SHT. P-3 SANITARY ISOMETRIC
 DRAWING THE EYE WASH IS NOT VENTED IT SHALL COMPLY WITH
 FBC PL 901.2.1 THE VENTS THAT WERE ADDED APPEAR TO BE
 HORIZONTAL DRY VENTS WHICH ARE NON CODE COMPLIANT, ALL
 DRY VENTS SHALL CONNECT TO THE HORIZONTAL DRAIN ABOVE
 THE CENTERLINE OF THE PIPE AND RUN VERTICAL TO A POINT
 ABOVE THE FLOOD LEVEL RIM OF THE FIXTURES. FOR
 CLARIFICATION VENTS SHOULD CONNECT TO THE HORIZONTAL
 DRAIN AT A LOCATION WERE THEY CAN RUN UP INTO A
 VERTICAL WALL THEY CAN NOT CONNECT IN THE MIDDLE OF THE
 FLOOR. PER FBC PL 905.3 AND 905.4
  
 PARTIALLY COMPLIED 9. PLEASE SHOW COMPLIANCE WITH FBC
 PL 416.5 TEMPERED WATER FOR PUBLIC HAND-WASHING
 FACILITIES.
 TEMPERED WATER SHALL BE DELIVERED FROM LAVATORIES AND
 GROUP WASH FIXTURES LOCATED IN PUBLIC TOILET FACILITIES
 PROVIDED FOR CUSTOMERS, PATRONS AND VISITORS. TEMPERED
 WATER SHALL BE DELIVERED THROUGH AN APPROVED
 WATER-TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE
 1070 OR CSA B125.3. TEMPERED WATER IS ONLY REQUIRED AT
 HAND WASHING LAVATORY,S IN THE BATHROOMS THE
 TEMPERATURE LIMITING DEVICE SHALL ONLY CONNECT THESE
 LAVATORY,S THE OTHER SINKS USED FOR CLEANING UTENSILS,
 EQUIPMENT AND THE FACULTY THEY SHALL BE SUPPLIED WITH
 HOT WATER WITH A TEMPERATURE ABOVE 110 DEQ. PER FBC PL
 607.1
  
 10. PLEASE SHOW COMPLIANCE WITH FBC PL 606.1 LOCATION
 OF FULL-OPEN VALVES.
 FULL-OPEN VALVES SHALL BE INSTALLED IN THE FOLLOWING
 LOCATIONS: 5. ON THE TOP OF EVERY WATER DOWN-FEED PIPE
 IN OCCUPANCIES OTHER THAN ONE- AND TWO-FAMILY
 RESIDENTIAL OCCUPANCIES.
  
 11. PLEASE SHOW COMPLIANCE WITH FBC PL 607.2 HOT OR
 TEMPERED WATER SUPPLY TO FIXTURES.
 THE DEVELOPED LENGTH OF HOT OR TEMPERED WATER PIPING,
 FROM THE SOURCE OF HOT WATER TO THE FIXTURES THAT
 REQUIRE HOT OR TEMPERED WATER, SHALL NOT EXCEED 50 FEET
 (15 240 MM). RECIRCULATING SYSTEM PIPING AND
 HEAT-TRACED PIPING SHALL BE CONSIDERED TO BE SOURCES OF
 HOT OR TEMPERED WATER.
 [E] 607.5 PIPE INSULATION.
 HOT WATER PIPING IN AUTOMATIC TEMPERATURE MAINTENANCE
 SYSTEMS SHALL BE INSULATED WITH 1 INCH (25 MM) OF
 INSULATION HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 BTU
 PER INCH/H ? FT2 ? ?F (1.53 W PER 25 MM/M2 ? K). THE
 FIRST 8 FEET (2438 MM) OF HOT WATER PIPING FROM A HOT
 WATER SOURCE THAT DOES NOT HAVE HEAT TRAPS SHALL BE
 INSULATED WITH 0.5 INCH (12.7 MM) OF MATERIAL HAVING A
 CONDUCTIVITY NOT EXCEEDING 0.27 BTU PER INCH/H ? FT2 ?
 ?F (1.53 W PER 25 MM/ M2 ? K). FOR CLARIFICATION ANY
 FIXTURE OVER 50' FROM THE WATER HEATER ARE REQUIRED TO
 BE ON A HOT WATER RECIRCULATING SYSTEM. PER FBC PL
 607.2
  
 12. PLEASE SHOW COMPLIANCE WITH FBC PL 604.9 WATER
 HAMMER.
 THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM
 SHALL BE CONTROLLED TO REDUCE THE POSSIBILITY OF WATER
 HAMMER. A WATER-HAMMER ARRESTOR SHALL BE INSTALLED
 WHERE QUICK-CLOSING VALVES ARE UTILIZED. WATER-HAMMER
 ARRESTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE
 MANUFACTURER?S INSTRUCTIONS. WATER-HAMMER ARRESTORS
 SHALL CONFORM TO ASSE 1010. PLEASE SHOW WATER-HAMMER
 ARRESTORS ON WATER RISER.
  
 13. ANY EQUIPMENT CONNECTED TO THE POTABLE WATER SYSTEM
 SHALL HAVE A BACK FLOW ON IT PLEASE SHOW ON WATER
 RISER. FBC PL 608.3 .
  
 14. PLEASE PROVIDE A RISER DIAGRAM FOR PROCESS PIPING
 AND STEAM PIPING. PER WPB AMEND TO FBC 107.3.5.1.3(13)
 FLAT DRAWINGS DO NOT COMPLY WITH THIS REQUIREMENT
 PLEASE PROVIDE PIPE SIZING AND THE TYPE OF PIPE ON THE
 RISER.
  
 NEW COMMENTS:
  
 1. PLEASE SEPARATE THE SANITARY AND THE WATER ISOMETRIC
 DRAWING WITH THEM TOGETHER IT IS EXTREMELY DIFFICULT TO
 DETERMINE IF THEY ARE CODE COMPLIANT AND WILL NOT SCAN
 PROPERLY FOR OUR RECORD KEEPING. PER WPB AMEND TO FBC
 107.2.1.4
  
 2. PLEASE SHOW PIPE SIZING, VALVES, AND ANY OTHER
 DEVICES ON THE WATER ISOMETRIC. PER WPB AMEND TO FBC
 107.2.1
  
 3. TRAP PRIMERS ARE REQUIRED ON ALL FLOOR DRAINS TRENCH
 DRAIN AND FLOOR SINKS PLEASE SHOW IN THE ISO DRAWING.
 PER FBC PL 1002.4
  
 SHALL COMPLY WITH MECHANICAL COMMENTS:
 3) SHEET P3: SECOND REQUEST FOR THE MECHANICAL PLAN FOR
 THE DISTILLERY. THE RESUBMITTED PLAN DOES NOT INCLUDE
 THE STEAM PIPING FROM THE BOILER TO THE DISTILLERY
 TANKS.
  
 4) IN RESPONSE TO COMMENT #S 6A & 6C, THE ENGINEER OF
 RECORD IS STATING THAT NO DATA SHEETS ARE AVAILABLE FOR
 THE DISTILLERY TANKS AND THAT THE TANKS AND THE
 PROCESSING EQUIPMENT ARE USED AND BEING RELOCATED TO
 THE NEW FACILITY. PLEASE SEE SECTION 101.9.1 WPB
 AMENDMENTS TO THE FBC. USED MATERIALS AND EQUIPMENT.
  
 "THE USE OF USED MATERIALS WHICH MEET THE REQUIREMENTS
 OF THIS CODE FOR NEW MATERIALS IS PERMITTED. USED
 EQUIPMENT AND DEVICES SHALL NOT BE REUSED UNLESS
 APPROVED BY THE BUILDING OFFICIAL."
  
 THE DISTILLERY TANKS AND EQUIPMENT ARE NOT APPROVED AT
 THIS TIME WITHOUT FURTHER EVIDENCE OF COMPLIANCE WITH
 THE GOVERNING TESTING AGENCY FOR DISTILLERY TANKS AND
 EQUIPMENT. DISTILLERY TANKS AND EQUIPMENT ARE NOT
 SPECIFICALLY ADDRESSED IN THE MECHANICAL CODE, HOWEVER
 IN ACCORDANCE WITH SECTION 1003.1 FBC-14 MECHANICAL:
  
 "ALL PRESSURE VESSELS SHALL BE IN ACCORDANCE WITH THE
 ASME BOILER AND PRESSURE VESSEL CODE, SHALL BEAR THE
 LABEL OF AN APPROVED AGENCY AND SHALL BE INSTALLED IN
 ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION
 INSTRUCTIONS."
  
 PRESSURE VESSEL DEFINITION - SCOPE
  
 THESE SCOPES ARE BASED ASME CODE SEC VIII DIV 1
 THE VESSEL WITH MAXIMUM ALLOWABLE WORKING
 PRESSURE(MAWP) HIGHER THAN 15 PSI
 INSIDE DIAMETER TO BE HIGHER THAN 152 MM
 NO PIPING OR PIPING COMPONENT
 NO ROTATING OR RECIPROCATING EQUIPMENT
 NOT WATER VESSEL UP TO 300PSI OR 210?F
 NOT WITHIN THE SCOPE OF OTHER SECTIONS
 ALSO FOR GAS FIRED DOUBLE SHELL HEAT EXCHANGERS < 50
 PSI
 NOT STEAM BOILERS WITH DIRECT FIRING
 NOT FOR HUMAN OCCUPANCY (PVHO)
  
 ADVISORY: PLEASE CONSULT WITH THE ALCOHOL AND TOBACCO
 TAX AND TRADE BUREAU (TTB) FOR DISTILLERY TESTING AND
 INSPECTION GUIDELINES.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved