2017-12-22 11:24:511ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17090272
 12/22/17
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE LS-1 PLAN IS MISSING FROM ONE OF THE RESUBMITTED
 PLAN SETS.
  
 2) SHEETS LS-1, M-1, & M-2: THE VENTILATION
 CALCULATIONS BASED ON WAREHOUSE AND SALE AREA DO NOT
 CLEARLY REPRESENT THE ACTUAL USES OF THE TENANT SPACE.
 THE LS-1 IS INDICATING F-1 WHICH IS A FACTORY
 OCCUPANCY, AND THE PLANS ARE INDICATING A BAR AND
 TABLES FOR OCCUPANTS TO GATHER FOR SAMPLING OF THE RUM.
 PLEASE REFER TO SECTION 403.3 AND TABLE 403.3 TO FIND
 THE MOST SIMILAR OCCUPANCIES. UNDER WORK ROOMS THE
 FACTORY OR DISTILLERY AREA WOULD BE MOST SIMILAR TO
 MEAT PROCESSING- 51 PERSONS AT 15 CFM PER OCCUPANT= 765
 CFMS. THE BAR AREA MUST BE SEPARATELY CALCULATED FROM
 THE SALES AREA (CALCULATED AT 15 PERSONS PER SQ. FT.)
 BECAUSE BARS ARE CALCULATED AT 100 PERSONS PER SQ. FT.
 PLEASE REVISE THE CALCULATIONS.
  
 3) SHEET P3: SECOND REQUEST FOR THE MECHANICAL PLAN FOR
 THE DISTILLERY. THE RESUBMITTED PLAN DOES NOT INCLUDE
 THE STEAM PIPING FROM THE BOILER TO THE DISTILLERY
 TANKS.
  
 4) IN RESPONSE TO COMMENT #S 6A & 6C, THE ENGINEER OF
 RECORD IS STATING THAT NO DATA SHEETS ARE AVAILABLE FOR
 THE DISTILLERY TANKS AND THAT THE TANKS AND THE
 PROCESSING EQUIPMENT ARE USED AND BEING RELOCATED TO
 THE NEW FACILITY. PLEASE SEE SECTION 101.9.1 WPB
 AMENDMENTS TO THE FBC. USED MATERIALS AND EQUIPMENT.
  
 "THE USE OF USED MATERIALS WHICH MEET THE REQUIREMENTS
 OF THIS CODE FOR NEW MATERIALS IS PERMITTED. USED
 EQUIPMENT AND DEVICES SHALL NOT BE REUSED UNLESS
 APPROVED BY THE BUILDING OFFICIAL."
  
 THE DISTILLERY TANKS AND EQUIPMENT ARE NOT APPROVED AT
 THIS TIME WITHOUT FURTHER EVIDENCE OF COMPLIANCE WITH
 THE GOVERNING TESTING AGENCY FOR DISTILLERY TANKS AND
 EQUIPMENT. DISTILLERY TANKS AND EQUIPMENT ARE NOT
 SPECIFICALLY ADDRESSED IN THE MECHANICAL CODE, HOWEVER
 IN ACCORDANCE WITH SECTION 1003.1 FBC-14 MECHANICAL:
  
 "ALL PRESSURE VESSELS SHALL BE IN ACCORDANCE WITH THE
 ASME BOILER AND PRESSURE VESSEL CODE, SHALL BEAR THE
 LABEL OF AN APPROVED AGENCY AND SHALL BE INSTALLED IN
 ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION
 INSTRUCTIONS."
  
 PRESSURE VESSEL DEFINITION - SCOPE
  
 THESE SCOPES ARE BASED ASME CODE SEC VIII DIV 1
 THE VESSEL WITH MAXIMUM ALLOWABLE WORKING
 PRESSURE(MAWP) HIGHER THAN 15 PSI
 INSIDE DIAMETER TO BE HIGHER THAN 152 MM
 NO PIPING OR PIPING COMPONENT
 NO ROTATING OR RECIPROCATING EQUIPMENT
 NOT WATER VESSEL UP TO 300PSI OR 210?F
 NOT WITHIN THE SCOPE OF OTHER SECTIONS
 ALSO FOR GAS FIRED DOUBLE SHELL HEAT EXCHANGERS < 50
 PSI
 NOT STEAM BOILERS WITH DIRECT FIRING
 NOT FOR HUMAN OCCUPANCY (PVHO)
  
 ADVISORY: PLEASE CONSULT WITH THE ALCOHOL AND TOBACCO
 TAX AND TRADE BUREAU (TTB) FOR DISTILLERY TESTING AND
 INSPECTION GUIDELINES.
  
 5) THE SUBMITTED ENERGYGAUGE COMPLIANCE REPORT IS
 INDICATING AHU-1 TO HAVE A DESIGN EFFICIENCY RATING OF
 12 EER, HOWEEVER THE EQUIPMEBNT SCHEDULE ON SHEET M-2
 INDICATES 11.2 EER.
  
 6) THE REQUESTED ENGINEERING FOR INSTALLATION OF THE
 CHILLER AS SHOWN ON SHEET S-15 IS INCOMPLETE. MISSING
 FROM THE DETAIL IS THE WIND LOAD DESIGN CRITERIA PER
 SECTION 1609 FBC-14 BUILDING, AND ALSO SPECIFICATIONS
 AND DETAILS FROM THE CHILLER MANUFACTURER. PLEASE NOTE
 THAT COMPLETE ENGINEERING MAY BE A DEFERRED SUBMITTAL
 IF NECESSARY.
  
 1) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 2) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved