| Date |
Text |
| 2017-10-16 17:56:39 | 1ST REVIEW FBC-2014 MECHANICAL, EXISTING BUILDING, |
| | ENERGY CONSERVATION CODES. |
| | PERMIT #17090272 |
| | 10/16/17 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) REFER TO SECTIONS C101.4.4 AND C101.4.5 FBC-14 |
| | ENERGY CONSERVATION: THE PROPOSED PROJECT IS DETERMINED |
| | TO BE A CHANGE OF OCCUPANCY AND ALSO A CHANGE IN SPACE |
| | CONDITIONING WHICH REQUIRES FULL COMPLIANCE WITH THE |
| | CURRENT ENERGY CODE. THE SUBMITTED FORM C402-2014 IS A |
| | COMPLIANCE FORM USED FOR ALTERATIONS AND CANNOT BE USED |
| | IN THIS CASE- SECTION C101.5.1.1. PLEASE |
| | |
| | SEE SECTION C401.2 AND SUBMIT AN ENERGY COMPLIANCE FORM |
| | UTILIZING ONE OF THE METHODS DESCRIBED THERE. |
| | |
| | 2) REFER TO SECTION 809.2 FBC-14 EXISTING BUILDING CODE |
| | AND PROVIDE MINIMUM VENTILATION CALCULATIONS FOR ALL |
| | ROOMS AND SPACES PER TABLE 403.3 FBC-14 MECHANICAL. |
| | PROVIDE A SCHEDULE THAT INDICATES THE REQUIRED AND |
| | PROVIDED CFMS OF OUTDOOR AIR. CLARIFY IF VENTILATION |
| | FOR THE BOILER ROOM AND THE MOLASSES TANK ROOM IS TO BE |
| | PROVIDED, AND IN ACCORDANCE WITH WHICH CODE STANDARD |
| | |
| | OR BY MANUFACTURER'S SPECIFICATIONS. |
| | |
| | 3) CORRECT KEYNOTE 1 ON SHEET M-1 WHICH IS INDICATING |
| | BATHROOM EXHAUST AT THE O/A INTAKE FOR THE RELOCATED 10 |
| | TON AC SYSTEM. NOTE 1 IS ALSO INCORRECTLY SHOWN AT THE |
| | COMBUSTION AIR OPENING FOR THE BOILER ROOM- PLEASE |
| | CORRECT. REFER TO SECTION 401.4(2): THE LOCATION OF THE |
| | O/A INTAKE APPEARS TO BE WITHIN 10' OF THE STREET- |
| | PLEASE RELOCATE THE INLET. |
| | |
| | 4) AC SYSTEMS: A) NON-COMBUSTIBLE DOORS ARE REQUIRED |
| | FOR THE SECOND FLOOR MECHANICAL ROOM AND THE STORAGE 2 |
| | ROOM WHERE THE AIR HANDLERS ARE LOCATED- SEE SECTION |
| | C403.2.7.2 FBC-14 ENERGY CONSERVATION AND SECTION 602 |
| | FBC-14 MECHANICAL. B) PROVIDE CONDENSATE DISPOSAL |
| | PLANS- SECTION 307. C) PROVIDE STRUCTURAL ENGINEERING |
| | FOR INSTALLATION OF THE CONDENSER PADS AND |
| | |
| | ANCHORING DETAILS FOR MOUNTING THE CONDENSERS TO THE |
| | PADS- SECTION 301.15. D) FLOOD HAZARD- SEE SECTION |
| | 301.16: THE CONDENSERS SHALL BE INSTALLED AT OR ABOVE |
| | THE ELEVATION REQUIRED BY SECTION 1612 FBC-14 BUILDING. |
| | REFER ALSO TO BUILDING REVIEW COMMENTS REQUIRING A |
| | SURVEY AND ELEVATION CERTIFICATES. |
| | |
| | 5) BOILER: A) PROVIDE COMBUSTION AIR CALCULATIONS AND |
| | INDICATE HOW COMBUSTION AIR IS BEING PROVIDED PER |
| | SECTION 304 FBC-14 FUEL GAS. B) PROVIDE A VENTING PLAN |
| | INDICATING THE TYPE AND SIZE OF FLUE PIPE, LENGTH OF |
| | THE VENT RUN, TERMINATION HEIGHT ABOVE THE ROOF, AND |
| | CLEARANCE DISTANCES TO GRAVITY AND MECHANICAL AIR |
| | INTAKES- SECTION 503 FBC-14 FUEL GAS. C) SUBMIT |
| | MANUFACTURER'S |
| | |
| | SPECIFICATIONS FOR THE BOILER AND ALL ASSOCIATED |
| | EQUIPMENT- SECTION 631. |
| | |
| | 6) PROVIDE A MECHANICAL PLAN FOR THE DISTILLERY |
| | PROCESS: A) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR |
| | THE CHILLER, AND ALL DISTILLERY TANKS AND EQUIPMENT |
| | LISTED IN THE KEYNOTES ON S4- PN-32, 33, 34, 35, 36, |
| | 37, 38, 39, 40, & 41. B) PROVIDE A CHILLED WATER PIPING |
| | LAYOUT PLAN. C) PROVIDE TANK VENTING DETAILS. D) |
| | PROVIDE WIND LOAD ENGINEERING FOR INSTALLATION OF THE |
| | CHILLER, AND VERIFY |
| | |
| | COMPLIANCE WITH FLOOD ELEVATION. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |