| 2017-10-12 11:52:16 | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | GAS COMMENTS: |
| | |
| | 1. PLEASE PROVIDE MANUFACTURE SPECIFICATIONS FOR THE |
| | BOILER AND ASSOCIATED EQUIPMENT, TANKLESS HEATERS AND |
| | FLUE PIPING. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 2. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| | FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. |
| | |
| | 3. THE PLUMBING PLAN SHOWS 2 TANKLESS WATER HEATERS THE |
| | GAS RISER ONLY SHOWS 1 TANKLESS WATER HEATER PLEASE |
| | CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 4. SHT. G-1 GAS RISER THE BRANCH PIPING FEEDING THE |
| | TANKLESS WATER HEATERS IS UNDERSIZED FOR 2 HEATERS AS |
| | SHOWN ON PLUMBING PLAN IT SHALL BE 2". PER FBC FG TABLE |
| | 402.4(1) |
| | |
| | 5. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | FBC-2014 FUEL GAS CODE SEC. 304. |
| | |
| | 6. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014 |
| | FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 |
| | PSI. |
| | |
| | 7. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| | TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE |
| | SEC. 502 THRU 505. |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |