| 2017-10-05 17:12:55 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | 1. THIS PROJECT APPEARS TO BE A "SUBSTANTIAL |
| | IMPROVEMENT" AS THE VALUE OF THE IMPROVEMENT EXCEEDS |
| | 50% OF THE STRUCTURE VALUE PER PALM BEACH COUNTY |
| | PROPERTY APPRAISER ($310,000 PERMIT VALUE / $578,777 |
| | PAPA STRUCTURE VALUE). AS THE BFE IS 13' NGVD29, |
| | LOCATED IN FLOOD ZONE A9, PER FIRM PANEL 120229 0020B, |
| | WITH A 1' FREEBOARD PER CITY OF WEST PALM BEACH |
| | MUNICIPAL CODE 94-546(B)(2). |
| | |
| | FBC EB 403.2, THE STRUCTURE AND EQUIPMENT ARE TO COMPLY |
| | WITH THE MINIMUM DFE OF 14' NGVD29. IT APPEARS THAT THE |
| | STRUCTURE LIKELY COMPLIES (ALTHOUGH ACTUAL FFE IS NOT |
| | CLEAR, SEE OTHER COMMENT REGARDING LOWEST AND NEXT |
| | FLOOR); COMPLIANCE FOR MECHANICAL EQUIPMENT NOT CLEAR. |
| | |
| | 2. S1 DEPICTS TWO SEPARATE BUILDINGS CONNECTED WITH A |
| | COMMON WALL, BOTH LABELED AS "EXISTING ONE STORY |
| | BUILDING". THEY APPEAR TO BE ONE BUILDING, STRUCTURALLY |
| | CONNECTED. IF THEY ARE TWO BUILDINGS, REVISE PLAN TO |
| | STATE HOW THIS HAS BEEN DETERMINED. IF THEY ARE ONE |
| | BUILDING, REVISE THE LABELS. |
| | |
| | 3. PROVIDE A COPY OF THE SURVEY FOR THIS PROPERTY, FBC |
| | 107, FBC EB 403.2. |
| | |
| | 4. FBC EB 403.2, FBC B 1603.1.7, SHEET S4 SHOWS |
| | ELEVATION AS 0'0", AND REFERS TO NAVD88 ELEVATIONS ON |
| | SURVEY. NO SURVEY WAS PROVIDED. |
| | |
| | PLEASE REVISE S4 TO INCORPORATE THE EXISTING AND |
| | PROPOSED FFE. CLARIFY FFE FOR THE CONNECTED BUILDING |
| | CURRENTLY LABELED AS "EXISTING ONE STORY BUILDING". |
| | |
| | IT IS RECOMMENDED THAT, SINCE THE APPLICATION WAS |
| | SUBMITTED PRIOR TO OCTOBER 5, 2017, THAT THE VERTICAL |
| | DATUM ON THE BUILDING PLANS UTILIZE NGVD29. IF NAVD88 |
| | IS UTILIZED ON THE BUILDING PLANS, INCLUDE A CONVERSION |
| | (AND NOTE METHOD OF CONVERSION) SO COMPLIANCE WITH THE |
| | REQUIREMENTS OF FBC EB 403.2 IS CLEAR. |
| | |
| | ALL ELEVATION CERTIFICATES CERTIFIED OCTOBER 5, 2017 |
| | AND LATER ARE TO UTILIZE NAV88 AND INCLUDE A CONVERSION |
| | TO NGVD29. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS. |
| | |
| | 5. FBC EB 403.2, REVISE THE PLAN TO CLARIFY THAT FFE |
| | AND ALL EQUIPMENT SERVICING THE BUILDING ARE PROPOSED |
| | TO BE ELEVATED OR INSTALLED AT > 14'NGVD29. REVISE THE |
| | PLAN TO INCLUDE ALL EQUIPMENT SERVICING THE BUILDING. |
| | |
| | 6. FBC EB 403.2, COMMENTS REGARDING THE ELEVATION |
| | CERTIFICATE PROVIDED: |
| | |
| | A. PROVIDE A "CONSTRUCTION DRAWINGS" ELEVATION |
| | CERTIFICATE TO SHOW/CLARIFY PROPOSED CONSTRUCTION. |
| | |
| | B. ELEVATION CERTIFICATE ITEM C2(E), MECHANICAL |
| | EQUIPMENT ELEVATION IS BLANK; PLEASE REVISE WITH NOTES |
| | IF NEEDED. WATER HEATER? ROOFTOP MECHANICAL EQUIPMENT? |
| | PLEASE CONTACT ME IF YOU WISH TO DISCUSS. |
| | |
| | C. THE ELEVATION CERTIFICATE, ITEM C2A TOP OF BOTTOM |
| | FLOOR, 14.54, AND ITEM B, TOP OF NEXT FLOOR, AS 14.09. |
| | PLEASE CORRECT. FFE IS NOT CLEAR. NOTE THAT BOTH COMPLY |
| | WITH BFE + 1' FREEBOARD. |
| | |
| | D. A1, OWNER ON EC IS "HEALTHCARE REAL ESTATE CAPITAL"; |
| | THIS IS IN CONFLICT WITH PROPERTY APPRAISER RECORDS. |
| | REVISE OR CLARIFY. |
| | |
| | E. A9 INDICATES AN 1813 SF GARAGE, C2(D) ELEVATION IS |
| | "NA" AND SHEET S1 DOES NOT SHOW A GARAGE, PLEASE |
| | CORRELATE. |
| | |
| | F. C2 BENCHMARK, SEE INSTRUCTIONS: INCLUDE PERMANENT |
| | IDENTIFIER (PID). ON THE EC, BENCHMARK UTILIZED IS |
| | "LOCAL"; IT IS NOT CLEAR IF THAT MEANS A LOCAL |
| | BENCHMARK, OR IF THE NAME OF THE BENCHMARK IS "LOCAL". |
| | |
| | G. SECTION E (E1-E5), PLEASE REVISE TO INCLUDE "NA" FOR |
| | FIELDS WHICH ARE CURRENTLY. |
| | |
| | 7. THIS PERMIT WILL BE ISSUED WITH PROVISO; PRIOR TO |
| | CONCRETE POUR, A "BUILDING UNDER CONSTRUCTION" |
| | ELEVATION CERTIFICATE OR FORM BOARD SURVEY WITH |
| | ELEVATIONS WILL BE REQUIRED. PRIOR TO FINAL INSPECTION, |
| | A "FINISHED CONSTRUCTION" ORIGINAL SIGNED AND SEALED |
| | ELEVATION CERTIFICATE, WITH COLOR PHOTOGRAPHS OF ALL |
| | SIDES OF THE STRUCTURE AND EXTERIOR MECHANICAL |
| | EQUIPMENT (WITH TIE DOWNS VISIBLE IN PHOTOS) WILL BE |
| | REQUIRED. SUBMIT THE "FINISHED CONSTRUCTION" ELEVATION |
| | CERTIFICATE AT THE BUILDING DIVISION AS A SUBMITTAL (NO |
| | FEE) FOR REVIEW WHEN AVAILABLE. |
| | |
| | 8. FBC EB 301.1, THIS APPEARS TO BE A CHANGE OF |
| | OCCUPANCY (CH 10). A CURSORY LOOK INTO RECORDS FOR THIS |
| | BUILDING APPEAR TO REFLECT THAT CURRENT OCCUPANCY IS |
| | BUSINESS OR STORAGE. IF THIS IS A CHANGE OF OCCUPANCY, |
| | REVISE PLAN TO NOTE THE CHANGE OF OCCUPANCY FROM |
| | CURRENT OCCUPANCY TO MIXED OCCUPANCY F1, M, AND |
| | POSSIBLE ANOTHER OCCUPANCY (TASTING/TOURS). |
| | |
| | VIA A RECORDS RESEARCH REQUEST, PLEASE DETERMINE THE |
| | CURRENT OCCUPANCY AS PERMITTED; CONTACT |
| | [email protected]. |
| | |
| | 9. THE PROCESSING PORTION HAS TEXT WHICH STATES: |
| | "TASTING/TOURS". SEE FBC B 302: "A ROOM OR SPACE THAT |
| | IS INTENDED TO BE OCCUPIED AT DIFFERENT TIMES FOR |
| | DIFFERENT PURPOSES SHALL COMPLY WITH ALL OF THE |
| | REQUIREMENTS THAT ARE APPLICABLE TO EACH OF THE |
| | PURPOSES FOR WHICH THE ROOM OR SPACE WILL BE OCCUPIED." |
| | |
| | NOT ENOUGH INFORMATION TO DETERMINE CODE COMPLIANCE. IF |
| | THIS AREA WILL BE USED FOR TOURS/TASTING, IT APPEARS |
| | THAT THE AREA WOULD ALSO BE SUBJECT TO ACCESSIBILITY. |
| | AN F1 OCCUPANT LOAD OF 51 IS DECLARED; IS THE |
| | TOURS/TASTING OCCUPANT LOAD IN ADDITION TO THIS |
| | OCCUPANT LOAD OR INCLUSIVE? WHAT IS THE OCCUPANT LOAD |
| | ANTICIPATED FOR THE TOURS/TASTING VS. F1 OCCUPANT LOAD? |
| | |
| | 10. IF THIS IS A CHANGE OF OCCUPANCY, SEE FBC EB TABLES |
| | 1012.4 THROUGH 1012.6. IN ANY CASE WHERE CHANGE OF |
| | OCCUPANCY IS MADE TO A HIGHER HAZARD, REVISE PLAN TO |
| | SHOW COMPLIANCE. |
| | |
| | 11. SEE IMPACT FEE REVIEW. PLAN IS TO BE CLEAR AS TO |
| | PREVIOUS USE/OCCUPANCY (PERMITTED AND INSPECTED) SO |
| | THEY CAN PERFORM AN ACCURATE REVIEW. |
| | |
| | IT APPEARS THAT ADDITIONAL SQUARE FOOT AREA IS BEING |
| | ADDED (CREATING A 2ND FLOOR). REVISE THE PLAN TO |
| | CLARIFY EXISTING SF AREA, PROPOSED NEW. |
| | |
| | 12. THE DOOR TO "MOLASSES TANKS" ROOM LACKS THE |
| | MANEUVERING CLEARANCE REQUIRED BY FBC A TABLE 404.2.4.1 |
| | (A), 18" PULL SIDE. THIS APPEARS TO BE A WORK AREA; SEE |
| | FBC A 206.2.8 REGARDING EMPLOYEE WORK AREAS. IF AN |
| | EXEPTION IS APPLICABLE, REVISE PLAN TO INCLUDE |
| | EXCEPTION. |
| | |
| | 13. FBC A TABLE 404.2.4.1(A), REVISE PLAN TO SHOW 18" |
| | MANEUVERING CLEARANCE REQUIRED FOR DOOR DR 3. |
| | |
| | 14. S4, A DASHED LINE (3') AT THE ENTRY DOOR IS SHOWN. |
| | CLARIFY WHAT THIS IS. REVISE PLAN TO SHOW ACCESSIBLE |
| | ROUTE AT ENTRY DOOR WHICH COMPLIES WITH FBC A 303.2 |
| | (SEE ALSO FBC A 202.3). |
| | |
| | 15. PN25 MERCANTILE AREA, S4, ACCESSIBLE COUNTER SHOWN |
| | 30" DEPTH. PROVIDE A DETAIL OR REVISE PLAN TO SHOW |
| | COMPLIANCE WITH FBC A 902.3. |
| | |
| | PN25 TASTING TOURS AREA, PROVIDE A DETAIL TO SHOW |
| | COMPLIANCE WITH FBC A 902.3. |
| | |
| | 16. PN25, PROVIDE A DETAIL SHOWING COMPLIANCE WITH FBC |
| | A 227 (CHECK OUT AISLE). |
| | |
| | 17. NO FIRE SPRINKLER INFORMATION PROVIDED. EITHER |
| | PROVIDE A PLAN OR INCORPORATE ALL REQUIREMENTS OF FBC B |
| | 404.6 EXCEPTION INTO THE PLAN. |
| | |
| | 18. REVISE PLAN TO INDICATE FLOOR DESIGN LIVE LOAD, OR |
| | ADVISE WHERE THIS INFORMATION CAN BE LOCATED. REVISE |
| | PLAN TO INCLUDE THE REQUIREMENTS OF FBC B 106.1, 106.2: |
| | |
| | 106.1 LIVE LOADS POSTED. WHERE THE LIVE LOADS FOR WHICH |
| | EACH FLOOR OR PORTION THEREOF OF A COMMERCIAL OR |
| | INDUSTRIAL BUILDING IS OR HAS BEEN DESIGNED TO EXCEED |
| | 50 PSF (2.40 KN/M2), SUCH DESIGN LIVE LOADS SHALL BE |
| | CONSPICUOUSLY POSTED BY THE OWNER IN THAT PART OF EACH |
| | STORY IN WHICH THEY APPLY, USING DURABLE SIGNS. IT |
| | SHALL BE UNLAWFUL TO REMOVE OR DEFACE SUCH NOTICES |
| | |
| | 106.2 ISSUANCE OF CERTIFICATE OF OCCUPANCY. A |
| | CERTIFICATE OF OCCUPANCY REQUIRED BY SECTION 111 SHALL |
| | NOT BE ISSUED UNTIL THE FLOOR LOAD SIGNS, REQUIRED BY |
| | SECTION 106.1, HAVE BEEN INSTALLED. |
| | |
| | 19. LS2, TRAVEL DISTANCE IS SHOWN AS 94' TO THE BASE OF |
| | THE STAIR. SEE FBC B 1016.3, EXIT ACCESS TRAVEL |
| | DISTANCE IS TO BE MEASURED FROM THE MOST REMOTE POINT |
| | WITHIN A STORY ALONG THE NATURAL AND UNOBSTRUCTED PATH |
| | OF HORIZONTAL AND VERTICAL EGRESS TRAVEL TO THE |
| | ENTRANCE TO AN EXIT. IT APPEARS THAT THE MEASUREMENT IS |
| | TO THE BASE OF THE STAIR, AT WHICH POINT OCCUPANT IS |
| | REQUIRED TO GO THROUGH THE FIRST FLOOR TO REACH AN |
| | EXIT, PLEASE REVISE OR CLARIFY. SEE ALSO FBC B 404.9 |
| | (<200' TRAVEL DISTANCE). |
| | |
| | 20. FBC 107, PALLET RACKS, REVISE PLAN TO INCLUDE |
| | HEIGHT LIMITATION. |
| | |
| | 21. FBC A 213.1, 206.2.3, DEFINITION OF "ADDITION" |
| | 106.5, 202.2, PRIOR TO RESUBMITTING, SEND VIA EMAIL THE |
| | RATIONALE FOR NOT PROVIDING ACCESSIBLE BATHING |
| | FACILITIES ON THE FIRST FLOOR. ALSO PROVIDE RATIONALE |
| | FOR LACK OF ACCESSIBLE BATHING FACILITY ON THE 2ND |
| | FLOOR. |
| | |
| | SEE ALSO HTTPS://WWW.ACCESS-BOARD.GOV/GUIDELINES-AND-ST |
| | ANDARDS/BUILDINGS-AND-SITES/ABOUT-THE-ADA-STANDARDS/GUI |
| | DE-TO-THE-ADA-STANDARDS/CHAPTER-4-ACCESSIBLE-ROUTES |
| | |
| | 22. REVISE PLAN TO EXPLAIN PURPOSE OF INTERIOR WINDOWS |
| | ON 2ND FLOOR, FBC 107. IS THIS FOR VISITORS, EMPLOYEES, |
| | AND WHY? PLEASE SEND VIA EMAIL PRIOR TO RESUBMITTAL SO |
| | IT CAN BE DETERMINED IF ADDITIONAL INFORMATION IS |
| | REQUIRED. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS |