| 2018-02-27 14:52:33 | 3RD REVIEW: FBC 2014 5TH EDITION |
| | PLUMBING COMMENTS: PREVIOUS COMMENTS NOT COMPLIED WITH |
| | 1. SHT. P-904 PLEASE LABEL ALL THE FIXTURES ON THE |
| | ISOMETRIC DRAWING AND PROVIDE A PLUMBING FIXTURE |
| | SCHEDULE. PER WPB AMEND TO FBC 107.2.1. NOT ALL OF THE |
| | FIXTURES HAVE BEEN LABELED SUCH AS THE KITCHEN AREA AND |
| | FUTURE LAUNDRY, BAR AREA PLEASE CLARIFY. |
| | |
| | 3. PLEASE LABEL SEPARATELY ALL THE STACKS AND RISERS ON |
| | THE ISOMETRIC DRAWING TO MATCH THE FLOOR PLAN. PER WPB |
| | AMEND TO FBC 107.2.1 ALL THE STACKS ARE LABELED THE |
| | SAME BY THE NUMBER FROM THE KEYED NOTES PLEASE PROVIDE |
| | AN INDIVIDUAL LABEL OR TAG FOR EACH STACK TO COINCIDE |
| | WITH THE SAME TAG ON THE FLOOR PLAN. |
| | |
| | 9. PLEASE PROVIDE MANUFACTURE SIZING CALCULATIONS FROM |
| | SCHIER FOR THE GREASE AND OIL/SAND INTERCEPTORS. PER |
| | WPB AMEND TO FBC 107.2.1 THE CALCULATIONS FROM SCHIER |
| | WERE NOT PROVIDED |
| | |
| | 10. TWO WAY CLEAN OUTS ARE REQUIRED BETWEEN EACH |
| | INTERCEPTOR AND A TEST PORT ON THE DISCHARGE SIDE OF |
| | THE LAST INTERCEPTOR. PER WPB UTILITIES GREASE TRAP |
| | DETAILS FOUND IN THE FORM ON THE WPB WEBSITE UNDER |
| | DEVELOPMENT SERVICES. THE CLEAN OUTS SHOWN ON THE PLAN |
| | ARE ONE WAY CLEAN OUTS AND DO NOT COMPLY. A NOTE ON THE |
| | PLAN STATING TWO WAY CLEAN OUTS ARE REQUIRED BETWEEN |
| | EACH INTERCEPTOR WILL SUFFICE. |
| | |
| | NEW COMMENTS: |
| | |
| | 1. THE ONLY SHEETS THAT WE NEED FOR THE FOUNDATION |
| | PERMIT ARE THE CORRECTED P-002, P-102 AND P-906 ALL |
| | OTHER SHEETS SHALL BE REMOVED FROM THIS PLAN SET AND |
| | WILL BE APPROVED UNDER MAIN PERMIT. PER WPB AMEND TO |
| | FBC 107.2.1 |
| | |
| | 2. SHT. P-904 NOTE #3 LIST A 10? STORM DRAIN PIPE AT |
| | 16,300 SQFT THE ISOMETRIC SHOWS A 10? STORM PIPE AT |
| | 18,250 SQFT WHICH IS UNDERSIZED PLEASE CLARIFY. PER FBC |
| | PL TABLE 1106.3 |
| | |
| | 3. SHT. P- 904 THE FIRST SECTION OF THE HORIZONTAL |
| | STORM PIPING AT 10? 18,250 IS UNDERSIZED THE 8? AT |
| | 10050SQFT IS UNDERSIZED, THERE ARE MULTIPLE SECTIONS OF |
| | THE STORM ISOMETRIC THAT ARE UNDERSIZED PLEASE REVIEW |
| | ISOMETRIC AND CHECK THE SIZING PER FBC PL TABLE 1106.3 |
| | |
| | 4. SHT. P- 904 SOME OF THE SECTIONS OF THE SANITARY |
| | ISOMETRIC DO NOT SHOW SIZE PLEASE SHOW SIZE ON ALL |
| | SECTIONS OF PIPING. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 5. SHT. P- 904 SEVERAL SECTIONS OF THE HORIZONTAL |
| | BUILDING DRAIN AND BRANCHES ARE UNDERSIZED PLEASE SEE |
| | COMMENTS FOR SHT P-906 PLEASE CORRECT ON MAIN PERMIT |
| | SET. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 6. SHT P-906+904 THE AREA DRAINS IN INDOOR /OUTDOOR |
| | CAF? ARE NOT VENTED. PER FBC PL 901.2.1 |
| | |
| | 7. SHT. P-906 THE FOLLOWING SECTIONS OF THE HORIZONTAL |
| | BUILDING DRAIN ARE UNDERSIZED PER FBC PL TABLE 710.1(1) |
| | |
| | A) THE 4? SECTION BETWEEN X41, X43 ANDX37, X34 IS |
| | UNDERSIZED IT SHOWS 214DFU THE MAX FOR 4? AT 1/8FT IS |
| | 180DFU UPSIZE TO 6? |
| | |
| | B) THE NEXT SECTION UPSTREAM OF X32,34 SHOWS 4? 275DFU |
| | THE MAX FOR 4? AT 1/8FT IS 180DFU UPSIZE TO 6? |
| | |
| | C) THE NEXT SECTION UPSTREAM OF X33,35 IS NOT SIZED IT |
| | SHOULD BE 6?335DFU |
| | |
| | D) THE NEXT SECTION UPSTREAM OF X21,23 SHOWS 6? 820DFU |
| | THE MAX OF 6? AT 1/8FT IS 700DFU UPSIZE TO 8? |
| | |
| | E) THE NEXT SECTION DOWN STREAM OF X21,23 SHOWS |
| | 6?885DFU THE MAX OF 6? AT 1/8FT IS 700DFU UPSIZE TO 8? |
| | |
| | F) THE 4? BUILDING DRAIN BRANCH UPSTREAM OF X13,15 |
| | SHOWS 4? 250DFU THE MAX FOR 4? AT 1/8FT IS 180DFU |
| | UPSIZE TO 6? |
| | |
| | 8. SIZE ALL FIXTURE BRANCHES SOME ARE NOT SIZED. PER |
| | WPB AMEND TO FBC 107.2.1 |
| | |
| | 9. SHT. P-906 PROVIDE UNDERGROUND STORM PIPING |
| | ISOMETRIC SEE COMMENTS #2,3 AND CORRECT SIZING FOR NEW |
| | DRAWING. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |