| 2019-04-10 15:20:49 | BUILDING PLAN REVIEW |
| | 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | |
| | CHRISTOPHER S. THROOP, C.B.O. |
| | BUILDING PLANS EXAMINER, PX3169 |
| | 1&2 FAMILY PLANS EXAMINER, SFP306 |
| | CONSTRUCTION SERVICES DIVISION |
| | TEL: 561-805-6726 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | ADVISORY: MARRIOTT HOTEL 251 NARCISSUS |
| | |
| | THIS ELEVATION CERTIFICATE SUBMITTAL IS REVOKED FOR THE |
| | FOLLOWING: |
| | |
| | DUE TO THE DATE OF APPLICATION FOR THE HOTEL ON |
| | SEPTEMBER 7, 2017, THE BUILDING COMPLIES WITH THE |
| | STANDARD AT THE TIME OF PERMIT APPLICATION. THE |
| | BUILDING IS NOT REQUIRED TO PARTICIPATE IN THE NATIONAL |
| | FLOOD INSURANCE PROGRAM AND DOES NOT REQUIRE AN |
| | ELEVATION CERTIFICATE. |
| | |
| | HISTORY: |
| | |
| | PERMIT APPLICATION FOR THE MARRIOTT HOTEL WAS SEPTEMBER |
| | 7, 2017. THE STRUCTURE IS LOCATED JUST OUTSIDE A |
| | SPECIAL FLOOD HAZARD AREA (SFHA) ON THE COMMUNITY FLOOD |
| | MAP, PANEL NUMBER 120229 0015B, EFFECTIVE DATE OF MARCH |
| | 1, 1979, UTILIZING BASE FLOOD ELEVATION (BFE) DATUM |
| | NGVD 1929. ANOTHER STRUCTURE (THE RESTERAUNT) LOCATED |
| | WITHIN THIS PROJECT IS IN FLOOD ZONE A5, WITH A MINIMUM |
| | (BFE) OF 7 FEET NGVD 29. THE CITIES LOCAL FREEBOARD |
| | REQUIREMENT, AT TIME OF PERMIT APPLICATION, WAS 1 FOOT, |
| | MAKING THE ADJACENT BUILDING (THE RESTAURANT) MINIMUM |
| | FINISHED FLOOR ELEVATION ALSO REFERRED TO AS DESIGN |
| | FLOOD ELEVATION (DFE), 8 FEET NGVD 29. THE DESIGNER |
| | PLACED BOTH RESTAURANT AND HOTEL BUILDINGS FINISHED |
| | FLOOR ELEVATION (DFE) AT 9 FEET NGVD 29. |
| | |
| | THE NEW COMMUNITY FLOOD MAPS, EFFECTIVE DATE OF OCTOBER |
| | 5, 2017, PANEL NUMBER 12099C 0583F, UTILIZES BASE FLOOD |
| | ELEVATION DATUM NAVD 1988, THIS NEW MAP PLACES THE |
| | HOTEL IN A SPECIAL FLOOD HAZARD AREA (SFHA) WITH A BASE |
| | FLOOD ELEVATION (BFE) OF 6 FEET NAVD 88. WITH THE |
| | CITY'S NEW 2 FOOT FREE BOARD, A BUILDING PERMITTED |
| | AFTER OCTOBER 5, 2017 WOULD REQUIRE A MINMUM FINISHED |
| | FLOOR ELEVATION (DFE) OF 8 FEET NAVD 88. |
| | |
| | THE AS-BUILT FINISHED FLOOR ELEVATION (DFE) OF THE |
| | HOTEL IS 9 FEET NGVD 29. IF THE HOTEL WERE PERMITTED |
| | TODAY (POST OCT. 5, 2017) THE FINISHED FLOOR ELEVATION |
| | (DFE) WOULD BE RECORDED AS 7.48 FEET NAVD 88, USING THE |
| | NEW 1988 DATUM. THIS WOULD PLACE THE HOTEL .52 FEET |
| | BELOW THE MINIMUM FINISHED FLOOR ELEVATION (DFE) OF 8 |
| | FEET NAVD 88. |
| | |
| | |
| | |
| | |