| 2018-01-26 12:35:11 | GAS COMMENTS: |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| | FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. |
| | |
| | 2. SHOW ON THE RISER TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, FOR EACH PIPE SIZE IF BEING USED. WPB |
| | AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 3. TYPE OF GAS, (LP OR NATURAL). |
| | |
| | 4. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| | AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? |
| | USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE |
| | SEC. 402.4.1. |
| | |
| | 5. THE RISER SHOWS THE TANKLESS HEATER WITH A BTU LOAD |
| | OF THE 75,200 THE EQUIPMENT SCHEDULE SHOWS 199,000 BTU |
| | CLARIFY WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 6. PLEASE INDECATE ON RISER EXISTING AND NEW PIPING. |
| | WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 7. INDICATE THE DELIVERY PRESSURE (PSI) ON THE RISER |
| | PER FBC-2014 FUEL GAS SEC. 402.2. IF NATURAL GAS |
| | SPECIFY .5 PSI OR 2 PSI. |
| | |
| | 8. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| | |
| | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |