| Date |
Text |
| 2017-08-25 09:56:23 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | 1) THIS SUBMITTAL DOES NOT INCLUDE DETAILS OR EQUIPMENT |
| | THAT IS TIED IN TO A DRY DOUBLE ACTION SPRINKLER |
| | SYSTEM. |
| | |
| | PER NFPA 13, |
| | |
| | 8.15.10 ELECTRICAL EQUIPMENT. |
| | 8.15.10.1 UNLESS THE REQUIREMENTS OF 8.15.10.3 ARE MET, |
| | SPRINKLER PROTECTION SHALL BE REQUIRED IN ELECTRICAL |
| | EQUIPMENT ROOMS. |
| | 8.15.10.2 HOODS OR SHIELDS INSTALLED TO PROTECT |
| | IMPORTANT ELECTRICAL EQUIPMENT FROM SPRINKLER DISCHARGE |
| | SHALL BE NONCOMBUSTIBLE. |
| | 8.15.10.3 SPRINKLERS SHALL NOT BE REQUIRED IN |
| | ELECTRICAL EQUIPMENT ROOMS WHERE ALL OF THE FOLLOWING |
| | CONDITIONS ARE MET: |
| | (1) THE ROOM IS DEDICATED TO ELECTRICAL EQUIPMENT ONLY. |
| | (2) ONLY DRY-TYPE ELECTRICAL EQUIPMENT IS USED. |
| | (3) EQUIPMENT IS INSTALLED IN A 2-HOUR FIRE-RATED |
| | ENCLOSURE INCLUDING PROTECTION FOR PENETRATIONS. |
| | (4) NO COMBUSTIBLE STORAGE IS PERMITTED TO BE STORED IN |
| | THE ROOM. |
| | |
| | |
| | THE CONDITIONS OF 8.15.10.3 HAVE NOT BEEN MET. |
| | SPRINKLER PERMIT 17060221 HAS BEEN DENIED BASED ON THE |
| | SAME COMMENT. |
| | |
| | PLEASE COORDINATE WITH THE FIRE SPRINKLER CONTRACTOR |
| | NAD PROVIDED FOR THE REQUIRED SYSTEM PROTECTION. |
| | |
| | |
| | |
| | |
| | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | |
| | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |