| 2017-08-28 18:13:52 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | 1. AS THIS IS A THRESHOLD BUILDING (6 STORY), A |
| | THRESHOLD INSPECTION PLAN PREPARED BY SEOR IS REQUIRED. |
| | REVISE THE INDEX PAGE TO INCLUDE THE THRESHOLD |
| | INSPECTION PLAN (SHEET 1.1, SHOWN ON INDEX AS "NOTES"). |
| | |
| | 2. AS THIS IS A THRESHOLD BUILDING, THREE SETS OF PLANS |
| | REQUIRED (CITY, SI, JOB). |
| | |
| | 3. STRUCTURAL CALCS PREPARED WITH ENERCALC REFER TO |
| | INCORRECT (OUTDATED) CODE AND STANDARD REFERENCES, FBC |
| | CHAPTER 35. REVISE AND CHECK ALL. |
| | |
| | 4. S2.6 SPECS A 3'6" PARAPET; CALCULATIONS (ENERCALC) |
| | SPEC A 5' PARAPET, CLARIFY. S2.6 SHOULD BE REMOVED |
| | (ROOF PLAN; NOT NEEDED FOR THIS PERMIT, SEE COMMENT |
| | #5), BUT CALCULATIONS SHOULD BE CONSISTENT WITH |
| | BUILDING DESIGN. |
| | |
| | 5. PLANS HAVE TOO MUCH INFORMATION. THIS APPEARS TO BE |
| | A FULL SET OF PLANS, WHICH IS IN CONFLICT WITH THE |
| | APPLICATION (FOUNDATION ONLY). FOR FOUNDATION PERMIT, |
| | ONLY THE FOLLOWING IS REQUIRED: |
| | |
| | PERMIT APPLICATION WHICH STATES SCOPE (FOR FOUNDATION |
| | PERMIT, TYPICALLY FOOTINGS OR FOOTINGS AND SLAB) |
| | GEOTECHNICAL REPORT |
| | SURVEY DRAWING |
| | STORM WATER POLLUTION PREVENTION PLAN |
| | SITE PLAN |
| | 1ST FLOOR ARCHITECTURAL PLAN |
| | ARCHITECTURAL CROSS SECTION(S) OF THE BUILDING |
| | FOUNDATION PLAN |
| | FOUNDATION DETAILS AND CROSS SECTIONS |
| | STRUCTURAL ENGINEER'S GENERAL NOTES |
| | UNDERGROUND PLUMBING PLAN (IF APPLICABLE) |
| | ELECTRICAL PLAN SHOWING ANY UNDERGROUND CONDUIT (IF |
| | APPLICABLE) |
| | ELECTRICAL GROUNDING TO STEEL DETAIL, IF APPLICABLE (OR |
| | EXPLAIN WHY THIS IS NOT APPLICABLE FOR THIS PROJECT). |
| | IF REQUIRED, A DETAIL IS REQUIRED AS A REVIEW, PERMIT, |
| | AND INSPECTION ARE REQUIRED PRIOR TO CONCRETE POUR |
| | PLAN SHOWING UNDERGROUND FIRE LINE |
| | THRESHOLD INSPECTION PLAN OR RESIDENT INSPECTION PLAN |
| | (AS APPLICABLE) |
| | INFORMATION SPECIFICALLY REQUESTED BY FIRE OR |
| | ENGINEERING |
| | |
| | SUBMISSION OF THE SHEETS NOT REQUIRED DELAYS FOUNDATION |
| | PERMIT ISSUANCE. A REVIEW HAS NOT BEEN DONE ON SHEETS |
| | OTHER THAN THOSE ABOVE. PLEASE REMOVE SHEETS NOT LISTED |
| | ABOVE. |
| | |
| | 6. PLEASE ADVISE, WHO WILL PERFORM THE SOILS |
| | IMPROVEMENT MONITORING? THIS INFORMATION MAY BE |
| | PROVIDED IN A LETTER, ON LETTERHEAD, FBC 107. IF THE |
| | VIBROFLOTATION PERMIT HAS BEEN ISSUED BEFORE THE |
| | FOUNDATION PERMIT IS RESUBMITTED, YOU MAY DISREGARD |
| | THIS COMMENT. UPON ISSUANCE, ALL DOCUMENTS ASSOCIATED |
| | WITH A PERMIT BECOME AN OFFICIAL RECORD. |
| | |
| | 7. I WAS UNABLE TO LOCATE THE THRESHOLD STATEMENT |
| | REQUIRED BY FS 553.79(7)(D) ON THE ARCHITECT'S AND |
| | ENGINEER'S PLAN. REVISE TO INCLUDE. IF THIS IS ALREADY |
| | ON THE PLANS, PLEASE ADVISE AS TO LOCATION AND IT IS |
| | POSSIBLE THAT THIS REVIEW CAN BE PASSED WITH PROVISO. |
| | |
| | 8. PLEASE ADVISE, WILL THIS FOUNDATION PERMIT BE A |
| | PRIVATE PROVIDER PROJECT? IF YES, PLEASE PROVIDE |
| | PAPERWORK. |
| | |
| | |
| | |
| | |