| Date |
Text |
| 2017-08-29 07:22:10 | 1ST REVIEW DENIED |
| | |
| | CITY RECORDS SHOW MUILT PERMITS ISSUED FOR .5LB GAS ON |
| | MAIN HOME. |
| | |
| | 1) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS |
| | SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 |
| | (37) OR 2014 FBC-RES. SEC. G2413 |
| | |
| | 2) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | |
| | 3 )SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| | APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| | BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR. FGC |
| | SEC.304.9.3 OR FBCR G2407.9.3. |
| | |
| | 4) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. FBC-FUEL GAS SEC.409.4, |
| | FBC-RESIDENTIAL SEC. G 2420.4 |
| | |
| | 5) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| | LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| | TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| | SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| | SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| | SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| | THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| | APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| | APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| | PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. |
| | FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR |
| | SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| | |
| | 6) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2014 FGC SEC.410.1. |
| | |
| | 7) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2014 FBC-FUEL GAS TABLE 402.4 |
| | (28) FOR THE PROPER PIPE SIZE AND BTU LOAD. |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | 561-805-6695 |
| | [email protected] |
| | |
| | |
| | |
| | |