| 2017-10-12 05:36:15 | 1) THE OCCUPANCY CLASSIFICATION OF BUSINESS ASSIGNED TO |
| | THE PROPOSED TENANT BUILD-OUT IS BEING QUESTIONED BY |
| | THE BUILDING AND FIRE DEPT. PLANS EXAMINERS. PLEASE |
| | NOTE THAT ADDITIONAL COMMENTS MAY OCCUR, OR |
| | COMMENTS MAY BE RETRACTED BASED ON THE DESIGN |
| | PROFESSIONALS CORRECTED PLANS AND RESPONSES. |
| | 2) SHT. P301 - PROVIDE THE QUANTITY OF EACH CYLINDER OF |
| | EACH GAS AND THE CAPACITY OF EACH CYLINDER IN CUBIC |
| | FEET, |
| | 3) INDICATE HOW THE MED GAS TANKS WILL BE SECURED AND |
| | PROTECTED FORM DAMAGE- SECTION 5.1.3.3.2 NFPA 99. |
| | 4) SHOW LOCATIONS OF RELIEF VALVES AND RELIEF PIPING |
| | VENTS IN THE STORAGE ROOM AND WHERE THE VENT PIPING IS |
| | TERMINATING- NFPA 99 SECTION 5.1.3.3.3.. |
| | 5) PLEASE SUBMIT PRODUCT DATA SHEETS FOR ALL THE |
| | MEDICAL GAS SYSTEM EQUIPMENT, THE AIR COMPRESSOR, AND |
| | THE VACUUM PUMP WITH APPROVAL STAMPS BY THE EOR- |
| | SECTION 107.2.1 WPB AMENDMENTS. |
| | 6) SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE |
| | BOTTLED WATER DISPENSING STATION. THIS MAY HAVE TO |
| | COMPLY WITH THE 2014 FBC-ACCESSIBILITY CODE. |
| | 7) THE ARCHITECT'S SEAL AND SIGNATURE ON THE DEMO AND |
| | ARCHITECTURAL PAGES APPEAR TO BE A COPY OF AN ORIGINAL |
| | SEAL AND SIGNATURE. COMPLY WITH F.A.C. 61G1-16.001. |
| | 8) SUBMIT A PIPING RISER DIAGRAM FOR THE WATER PIPING |
| | SYSTEM(S) INCLUDING ANY WATER FILTRATION SYSTEM. WPB |
| | AMEND. TO FBC SEC. 107.3.5.1.3. |
| | 9) SUBMIT A PIPING RISER DIAGRAM FOR THE ENTIRE MEDICAL |
| | GAS SYSTEM ( OXYGEN, NITROUS OXIDE) AND THE AIR AND |
| | VACUUM SYSTEM.WPB AMEND. TO FBC SEC. 107.3.5.1.3. THE |
| | MEDICAL GAS, AIR AND VACUUM SYSTEMS SHALL COMPLY WITH |
| | NFPA 99-12. |
| | 10) SUBMIT TWO COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS FOR THE EMERGENCY EYE WASH UNITS.THE |
| | EYEWASH STATION SHALL COMPLY WITH 2014 FBC-PLUMBING |
| | SEC.411.1 AND ISEA Z358.1. TEMPERED WATER SHALL BE |
| | SUPPLIED TO THE EYEWASH. 2014 FBC-PLUMBING SEC.607.1. |
| | 11) *** SUBMIT TWO COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS/INSTALLATION MANUAL FOR THE AIR |
| | COMPRESSOR AND VACUUM PUMPS.THIS EQUIPMENT SHALL COMPLY |
| | WITH THE REQUIREMENTS OF NFPA 99, SECS. |
| | 12) SUBMIT TWO COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS FOR THE STERILIZATION CABINET. WPB |
| | AMEND. TO FBC SEC. 107.2.1. |
| | 13) SHT.A3.9 - DETAIL # 2 - PROVIDE AN EXPANDED DETAIL |
| | OF THE VISTA CLEAR CABINET.THE DETAIL AND THE PRINT IS |
| | SMALL AND VERY HARD TO READ. WPB AMEND. TO FBC SEC. |
| | 107.2.1.ALSO, SUBMIT MANUFACTURER'S SPECIFICATIONS FOR |
| | THIS CABINET. |
| | 14) PROVIDE TWO COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS AND INSTALLATION MANUALS FOR THE DENTAL |
| | CHAIRS. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 15) SUBMIT TWO COPIES OF THE MANUFACTURER'S |
| | SPECIFICATIONS & INSTALLATION MANUALS FOR ALL DENTAL |
| | EQUIPMENT THAT EMPLOYS A WATER OR DRAIN CONNECTION TO |
| | THE APPLIANCE/EQUIPMENT.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 16) SHT. A1.6 - CLARIFY THE ACRONYMNS "LDV" AND "HDV" |
| | ON THE VACUUM SYSTEM. |
| | 17) SHT. A1.7 - SUBMIT A MINIMUM OF TWO COPIES OF THE |
| | MANUFACTURER'S PRE-INSTALLATION GUIDE FOR THE VACUUM |
| | PIPING SYSTEM TO BE PROVIDED BY A HENRY SCHEIN |
| | EQUIPMENT SALES SPECIALIST AS REFERENCED IN THE FIRST |
| | NOTE IN THE VACUUM SYSTEM NOTES ON THIS DRAWING PAGE. |
| | WPB AMEND. TO FBC SEC.107.2.1. |
| | 18) SUBMIT TWO COPIES OF THE MEDICAL GAS SYSTEM |
| | DRAWINGS FROM HENRY SCHEIN.THESE DRAWINGS ARE REQUIRED |
| | TO BEAR THE SEAL AND SIGNATURE OF AN ENGINEER LICENSED |
| | IN THE STATE OF FLORIDA PER THE WPB AMEND. TO THE FBC |
| | SEC.105.3.1.2 (3), F.S. 471. |
| | 19) SHT.A2.4 - DETAIL # 2 - THE SPACING OF THE GRAB BAR |
| | BEHIND THE WATER CLOSET SHALL COMPLY WITH 2014 |
| | FBC-ACCESSIBILITY SEC. 604.5.2.IF THE GRAB IS LOCATED A |
| | MAXIMUM OF ONE FOOT FROM THE SIDE WALL, THEN THERE WILL |
| | NOT BE THE REQUIRED MINIMUM OF 12 INCHES EXTENDING FROM |
| | THE CENTERLINE OF THE WATER CLOSET ON ONE SIDE. THE |
| | USUAL MAXIMUM DDISTANCE IS 6 INCHES. CLARIFY. SHOW THE |
| | RREQUIRED 12 INCHES AND 24 INCHES ON THE DETAIL. |
| | 20) SHT. A3.3 - FIVE PERCENT OR A MINIMUM OF ONE OF THE |
| | SINKS IN THE DUAL USE ROOMS SHALL COMPLY WITH THE 2014 |
| | FBC-ACCESSIBILITY SECS.212.3 & 606. |
| | 21) SHT. A2.4 - DETAILS #3, #5 & #8 SHOW A VERTICAL |
| | GRAB BAR.ALTHOUGH THIS IS NOT A REQUIRED GRAB BAR, THE |
| | 2014 FBC- ACCESSIBILITY SEC.609.4 REQUIRES GRAB BARS TO |
| | BE INSTALLED IN A HORIZONTAL POSITION. CLARIFY. |
| | 22) SHT. A2.4 - DETAIL #4 - SHOW THE DIMENSIONS OF THE |
| | REQUIRED CLEAR FLOOR SPACES (LXW) FOR THE LAVATORY AND |
| | WATER CLOSET ON THE PLANS. COMPLY WITH 2014 |
| | FBC-ACCESSIBILITY SECS.604.3 & 606.2. |
| | 24) STERILIZATION APPARTUS, WATER FILTERS, TANKS AND |
| | OTHER APPLIANCES THAT HANDLE OR TREAT POTABLE WATER |
| | SHALL BE PROTECTED AGAINST CONTAMINATION PER 2014 |
| | FBC-PLUMBING SEC.608.3, 608.3.1. A BACKFLOW PREVENTER |
| | IS REQUIRED ON THESE TYPES OF EQUIPMENT. |
| | 25) A BACKFLOW PREVENTER IS REQUIRED ON THE WATER |
| | SUPPLY AT THE BEVERAGE COUNTER AND ICE MAKER. 2014 |
| | FBC-PLUMBING SEC.608.16.10. |
| | 26) A WATER HAMMER ARRESTOR CONFORMING TO ASSE 1010 |
| | SHALL BE INSTALLED WHERE QUICK-CLOSING VALVES ARE |
| | UTILIZED ON THE WATER DISTRIBUTION SYSTEM.2014 |
| | FBC-PLUMBING SEC. 604.9. |
| | 27) SHT. P001 - NOTE #16 REFERS TO SHT. A1.6 FOR A |
| | DETAIL OF A SEDIMENT TRAP. THERE IS NO DETAIL ON SHT. |
| | A1.6. CLARIFY. |
| | 28) SHT. E-3 NOTES THE ELECTRIC WATER HEATER AS 30 |
| | GALLONS AND SHT. P001 NOTES THE WATER HEATER AS 65 |
| | GALLONS. CLARIFY. |
| | 29) THE HOT WATER RECIRCULATION SYSTEM SHALL COMPLY |
| | WITH THE 2014 FBC-PLUMBING SEC.607.5 FOR THE REQUIRED |
| | PIPE INSULATION. |
| | 30) SHT. P002 - BOTTOM FED WATER HEATERS SHALL BE |
| | EQUIPPED WWITH A VACUUM RELIEF VALVE PER 2014 |
| | FBC-PLUMBING SEC. 504.2. |
| | 31) SHT. P201 - NOTE #1 INDICATES A NEW 1 1/2 " COLD |
| | WATER CONNECTION TO AN EXISTING 1 1/4 " COLD WATER |
| | LINE. SUBMIT VERIFICATION THAT THE EXISTING 1 1/4" |
| | CCOLD WATER LINE WILL SUPPLY THE REQUIRED FLOW AND |
| | PRESSURES FOR THIS SYSTEM. 2014 FBC-PLUMBING |
| | SEC.604.3.** |
| | **NOTE** - ADDITIONAL REVIEW COMMENTS MAY BE GENERATED |
| | UPON RESUBMITTAL AND RE-REVIEW OF THE PLANS. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |