| Plan Review Notes For Permit 17080149 |
| Permit Number |
17080149 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-08-09 13:07:57 | 1) SHOW THE BTU LOAD FOR EACH OF THE TIKI TORCHES. THE | | | BTU LOAD OF EACH TIKI TORCH SHALL BE ADDED TO THE TOTAL | | | LOAD OF THE GAS SYSTEM. 2014 FBC-FUEL GAS SEC. 401.4. | | | 2) SHOW THE SIZE OF THE EXISTING PIPE TO THE TIKI | | | TORCHES TO ENSURE THE EXISTING SYSTEM IS SIZED PROPERLY | | | AND TO DETERMINE IF IT HAS THE ADEQUATE CAPACITY FOR | | | THE BTU LOAD. 2014 FBC- FUEL GAS SEC.401.4, 401.8. | | | 3) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR THE | | | NEW APPLIANCES.APPLIANCES SHALL BE LISTED AND LABELED. | | | FGC SEC.301.3. | | | 4) SHOW THE SIZE AND TYPE OF PIPE DOWNSTREAM OF THE | | | REGULATOR AT THE TANKLESS WATER HEATERS. | | | 5) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLE FOR | | | THE LOW PRESSURE SYSTEM. | | | | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|