| 2017-10-17 17:55:00 | ***PROVISOS*** |
| | |
| | 1. THRESHOLD BUILDING - THREE SETS OF PLANS REQUIRED. |
| | AFTER ISSUANCE, HAVE A FULL SIZE COPY OF THE PLANS MADE |
| | FOR THE SPECIAL INSPECTOR. |
| | |
| | 2. 110.3.7.4.3 ALL SHORING AND RESHORING PROCEDURES, |
| | PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT |
| | AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING |
| | INSTALLATION SHALL BE SUPERVISED, INSPECTED AND |
| | CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING |
| | DOCUMENTS BY THE CONTRACTOR. |
| | |
| | 3. W. P. B. 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS |
| | WHICH ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE |
| | REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF |
| | RECORD PRIOR TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| | FL 61G1-23.015 (2) THE ARCHITECT OR ENGINEER IS |
| | RESPONSIBLE FOR SUPERVISING AND REVIEWING ALL PROJECT |
| | DATA, REPORTS, SHOP DRAWINGS ETC. |
| | |
| | 4. COORDINATE WITH BUILDING INSPECTOR: WITH THE |
| | EXTERIOR STAIRS, RAMP (WEST SIDE OF THE BUILDING) AND |
| | THE ENTRY DOORS ON BOTH THE WEST AND EAST SIDES BEING |
| | REPLACED, PLEASE PROVIDE AN EGRESS PLAN OF HOW EGRESS |
| | WILL BE MAINTAINED DURING CONSTRUCTION. |
| | |
| | 2014 FBC-B 3310.2 MAINTENANCE OF MEANS OF EGRESS. |
| | REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED AT ALL |
| | TIMES DURING CONSTRUCTION, DEMOLITION, REMODELING OR |
| | ALTERATIONS TO ANY BUILDING. |
| | EXCEPTION: EXISTING MEANS OF EGRESS NEED NOT BE |
| | MAINTAINED WHERE APPROVED TEMPORARY MEANS OF EGRESS |
| | SYSTEMS AND FACILITIES ARE PROVIDED. |
| | |
| | 5. SEPARATE PERMITS REQUIRED FOR IRRIGATION, FIRE |
| | ALARM, FIRE SPRINKLER, LOW VOLTAGE. |
| | |