| 2017-08-08 04:19:02 | 1) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | GENERATOR. INDICATE THE TYPE OF PIPE TO BE USED TO |
| | CONNECT THE GENERATOR TO THE GAS SUPPLY LINE. |
| | 2) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE LOW PRESSURE GAS SYSTEM TO THE |
| | GENERATOR OR PLACE A NOTE ON THE PLANS/DRAWINGS |
| | SPECIFYING WHICH SIZING TABLE(S) FROM THE GAS CODE OR |
| | OTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS GAS |
| | SYSTEM. REFER TO THE 2014 FBC-FUEL GAS SECS. 401.4, |
| | 401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 (37) |
| | OR 2014 FBC-RES. SEC. G2412.4, G2412.8, G2413.1, |
| | G2413.2, & G2413.3. |
| | 3) SHOW THE DISTANCE OF THE LP TANK FROM THE DRIVEWAY. |
| | IF THE TANK IS LOCATED IN AREAS WHERE VEHICULAR TRAFFIC |
| | IS EXPECTED, THE INSTALLATION SHALL CCOMPLY WITH NFPA |
| | 58, SEC. 6.6.6.1 (B), (C), (E). |
| | 4) SHOW THE DISTANCE OF THE LP TANK FROM THE STRUCTURE. |
| | COMPLY WITH NFPA 58, TABLE 6.3.1. |
| | 5) THE SUBMITTED TANK ANCHORING DETAILS/ENGINEERING |
| | FROM R.F. TUCKER MUST BEAR AN ORIGINAL SEAL AND |
| | SIGNATURE PER THE FL. ADMIN. CODE RULE 61G15-23.001. A |
| | COPY OF THE ENGINEER'S SEAL AND SIGNATURE IS A |
| | VIOLATION OF THIS RULE. |
| | 6) THE GENERATOR SHALL BE INSTALLED IN ACCCORDANCE WITH |
| | THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND NFPA |
| | 37. THE GENERATOR SHALL MEET THE REQUIREMENTS OF UL |
| | 2200. 2014 FBC-FUEL GAS SEC.616.1. |
| | 7) SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE |
| | GENERATOR. FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 |
| | OR 2014 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE |
| | LISTED AND LABELED. THE INSTALLATION MANUALS FOR ALL |
| | GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME |
| | OF INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |