Plan Review Notes
Plan Review Notes For Permit 17070744
Permit Number 17070744
Review Stop E
Sequence Number 1
Notes
Date Text
2017-07-20 18:19:21FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH ED
 NFPA 70 2011 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
  
 NEED DISCONNECT AND GROUNDING ELECTRODE SYSTEM
 INSTALLED..
  
 225.30 NUMBER OF SUPPLIES
 A BUILDING OR OTHER STRUCTURE THAT IS SERVED BY A
 BRANCH CIRCUIT OR
 FEEDER ON THE LOAD SIDE OF A SERVICE DISCONNECTING
 MEANS SHALL BE
 SUPPLIED BY ONLY ONE FEEDER OR BRANCH CIRCUIT UNLESS
 PERMITTED IN
 225.30(A) THROUGH (E). FOR THE PURPOSE OF THIS SECTION,
 A MULTIWIRE
 BRANCH CIRCUIT SHALL BE CONSIDERED A SINGLE CIRCUIT.
 WHERE A BRANCH CIRCUIT OR FEEDER ORIGINATES IN THESE
 ADDITIONAL
 BUILDINGS OR OTHER STRUCTURES, ONLY ONE FEEDER OR
 BRANCH CIRCUIT
 SHALL BE PERMITTED TO SUPPLY POWER BACK TO THE ORIGINAL
 BUILDING
 OR STRUCTURE, UNLESS PERMITTED IN 225.30(A) THROUGH
 (E).
  
 225.31 DISCONNECTING MEANS
 MEANS SHALL BE PROVID ED FOR DISCONNECTING ALL
 UNGROUNDED CONDUCTORS
 THAT SUPPLY OR PASS THROUGH THE BUILDING OR STRUCTURE.
  
 250.32 BUILDINGS OR STRUCTURES SUPPLIED
 BY A FEEDER(S) OR BRANCH CIRCUIT(S)
 (A) GROUNDING ELECTRODE. BUILDING(S) OR STRUCTURE(S)
 SUPPLIED
 BY FEEDER(S) OR BRANCH CIRCUIT(S) SHALL HAVE A
 GROUNDING ELECTRODE
 OR GROUNDING ELECTRODE SYSTEM INSTALLED IN ACCORDANCE
 WI TH
 PART III OF ARTICLE 250. THE GROUNDING ELECTRODE
 CONDUCTOR(S) SHALL
 BE CON NECTED IN ACCORDANCE WITH 250.32(B) OR (C).
 WHERE THERE
 IS NO EXISTING GROUNDING ELECTRODE, THE GROUNDING
 ELECTRODE(S)
 REQUIRED IN 250.50 SHALL BE INSTALLED.