Plan Review Notes
Plan Review Notes For Permit 17070568
Permit Number 17070568
Review Stop G
Sequence Number 2
Notes
Date Text
2017-11-03 13:42:401) SUBMIT TWO COMPLETE COPIES OF THE GENERATOR
 INSTALLATION MANUAL FOR REVIEW, NOT JUST ONE OR TWO
 PAGES. WPB AMEND. TO FBC SEC. 107.2.1
 2) THE SHEETS PROVIDED FROM THE GENERATOR MANUAL REFER
 TO A 13 KW GENERATOR BUT THE PLAN REVIEW NOTES
 SUBMITTED FOR THE ELECTRICAL PLAN REVIEWER REFER TO THE
 INSTALLATION OF A 25 KW GENERATOR. WHICH IS IT? SUBMIT
 TWO COPIES OF THE CORRECT INSTALLATION MANUAL FOR THE
 UNIT BEING INSTALLED. WPB AMEND. TO FBC SEC. 107.2.1.
 3) SHOW ON THE PLANS THE SPECIFIC BTU LOAD OF THE
 TANKLESS WATER HEATER. THE UNIT HAS A RANGE OF 15,000
 BTU'S UP TO 157,000 BTU'S.
 4) SPECIFICATIONS FOR A GAS RANGE HAS BEEN SUBMITTED
 BUT A GAS RANGE IS NOT SHOWN ON THE GAS DRAWING.
 CLARIFY.
 5) THE GAS SIZING TABLE THAT HAS BEEN SUBMITTED IS FOR
 A NORITZ TANKLESS WATER HEATER MODEL NR98-SV BUT THE
 MODEL NOTED ON THE GAS PLAN IS A NORITZ MODEL NRC
 711-OD. CLARIFY.
 6) THE GAS SIZING TABLE THAT HAS BEEN SUBMITTED IS
 UNACCEPTABLE. IT IS FROM THE 1997 UPC WHICH IS AN
 OUTDATED CODE AND THE UPC IS NOT A RECOGNIZED STANDARD
 IN THE 2014 FBC. THIS GAS SYSTEM SHALL BE SIZED
 UTILIZING THE 2014 FBC-FUEL GAS CODE OR NFPA 54.
 7) THE GAS PLAN SHOWS A POOL HEATER. IS IT NEW OR
 EXISTING? INDICATE ON THE PLAN. WPB AMEND. TO FBC SEC.
 107.2.1.
 8) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC.
 G2413.
 9) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED AND
 ALL PIPE SIZES.WPB AMENDMENTS TO FBC SEC.107.2.1.
 10) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS
 SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4
 (37) OR 2014 FBC-RES. SEC. G2413.
 11) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014
 FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G
 2413.3.
 12) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES.
 SEC. G2413.2. .
 13) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4,
 G2412.8, G2413.1, G2413.2, & G2413.3.
 14) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3.
 15) SUBMIT TWO COMPLETE SETS OF PLANS COMPLYING WITH
 ALL OF THE ABOVE INFORMATION AND REMOVE ALL OLD SHEETS
 THAT DO NOT APPLY. WPB AMEND. TO FBC SEC. 107.1.
 16) THE GENERATOR SHALL MEET THE REQUIREMENTS OF UL
 2200.2014 FBC-FUEL GAS SEC.616.1. SUBMIT MANUFACTURER'S
 SPECIFICATIONS SHOWING COMPLIANCE.
 17) THE GENERATOR SHALL BE INSTALLED IN ACCORDANCE WITH
 THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND NFPA
 37. 2014 FBC-FUEL GAS SEC. 616.1.
 18) INDICATE ON THE SPECIFICATIONS WHAT MODEL OF THE
 GENERATOR IS BEING INSTALLED.
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  