| 2017-07-21 06:49:07 | 1) CITY RECORDS SHOW A PREVIOUS GAS PERMIT AT THIS |
| | ADDRESS. THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST |
| | BE ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO |
| | ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. IF |
| | UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO |
| | ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING |
| | RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING |
| | APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE |
| | SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| | EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, |
| | 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, |
| | G2413.2, G2413.3. |
| | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2014 FGC SEC.410.1. |
| | 3) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR THE GENERATOR(S) TO VERIFY |
| | COMPLIANCE WITH FBC-2014 FUEL GAS CODE SEC. 402.2, AND |
| | 301.3 OR 2014 FBC-RES. SEC. G2404.3. GAS APPLIANCES |
| | SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| | FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT |
| | THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES. |
| | SEC.G2408.1. |
| | 4) SUBMIT A SITE PLAN/SURVEY SHOWING THE LOCATION OF |
| | THE GENERATORS AND THE DISTANCE OF THE GENERATORS FROM |
| | THE STRUCTURES. |
| | 5) THE PERMIT APPLICATION IS FOR ONE GENERATOR BUT THE |
| | SUBMITTTED PLAN SHOWS 2 GENERATORS. CLARIFY. THE |
| | DESCRIPTION OF WORK ON THE APPLICATION SHALL CORRELATE |
| | WITH THE PLANS. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 6) THE GAS PLAN APPEARS TO SHOW GALVANIZED PIPING |
| | UNDERGROUND WHICH IS NOT PERMITTED BY THE 2014 FUEL GAS |
| | CODE SEC.404.11, 404.11.1. |
| | 7) SHOW THE BTU LOAD FOR EACH GENERATOR. 2014 FBC-FUEL |
| | GAS SECS. 401.8 THROUGH 402.2. |
| | 8) THE GENERATORS ARE REQUIRED TO MEET ZONING, |
| | ELECTRICAL AND BUILDING CODE REQUIREMENTS. COMPLETE |
| | PLANS SHALL BE SUBMITTED FOR THIS INSTALLATION. THE GAS |
| | PERMIT CANNOT BE ISSUED JUST FOR THE GAS INSTALLATION |
| | AS OTHER CODE REQUIREMENTS NEED TO BE MET. |
| | 9) THE SIZING TABLE THAT WAS SUBMITTED IS FROM THE 2009 |
| | INTERNATIONAL FUEL GAS CODE. THE CODE IN EFFECT IS THE |
| | 2014 FBC-FUEL GAS CODE. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |