2017-07-21 06:49:071) CITY RECORDS SHOW A PREVIOUS GAS PERMIT AT THIS
 ADDRESS. THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST
 BE ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO
 ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. IF
 UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO
 ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING
 RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING
 APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE
 SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE
 DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT
 OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF
 THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN
 A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO
 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE
 EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1,
 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1,
 G2413.2, G2413.3.
 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2014 FGC SEC.410.1.
 3) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR THE GENERATOR(S) TO VERIFY
 COMPLIANCE WITH FBC-2014 FUEL GAS CODE SEC. 402.2, AND
 301.3 OR 2014 FBC-RES. SEC. G2404.3. GAS APPLIANCES
 SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS
 FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT
 THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES.
 SEC.G2408.1.
 4) SUBMIT A SITE PLAN/SURVEY SHOWING THE LOCATION OF
 THE GENERATORS AND THE DISTANCE OF THE GENERATORS FROM
 THE STRUCTURES.
 5) THE PERMIT APPLICATION IS FOR ONE GENERATOR BUT THE
 SUBMITTTED PLAN SHOWS 2 GENERATORS. CLARIFY. THE
 DESCRIPTION OF WORK ON THE APPLICATION SHALL CORRELATE
 WITH THE PLANS. WPB AMEND. TO FBC SEC. 107.2.1.
 6) THE GAS PLAN APPEARS TO SHOW GALVANIZED PIPING
 UNDERGROUND WHICH IS NOT PERMITTED BY THE 2014 FUEL GAS
 CODE SEC.404.11, 404.11.1.
 7) SHOW THE BTU LOAD FOR EACH GENERATOR. 2014 FBC-FUEL
 GAS SECS. 401.8 THROUGH 402.2.
 8) THE GENERATORS ARE REQUIRED TO MEET ZONING,
 ELECTRICAL AND BUILDING CODE REQUIREMENTS. COMPLETE
 PLANS SHALL BE SUBMITTED FOR THIS INSTALLATION. THE GAS
 PERMIT CANNOT BE ISSUED JUST FOR THE GAS INSTALLATION
 AS OTHER CODE REQUIREMENTS NEED TO BE MET.
 9) THE SIZING TABLE THAT WAS SUBMITTED IS FROM THE 2009
 INTERNATIONAL FUEL GAS CODE. THE CODE IN EFFECT IS THE
 2014 FBC-FUEL GAS CODE.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved