| Date |
Text |
| 2017-08-14 14:55:55 | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL |
| | POSITION, 33 INCHES MINIMUM AND 36 INCHES MAXIMUM ABOVE |
| | THE FINISH FLOOR MEASURED TO THE TOP OF THE GRIPPING |
| | SURFACE. |
| | |
| | 2. THE GRAB BAR ON TH E REAR WALL SHALL COMPLY WITH FBC |
| | ACC 604.5.2 REAR WALL. |
| | THE REAR WALL GRAB BAR SHALL BE 36 INCHES (915 MM) LONG |
| | MINIMUM AND EXTEND FROM THE CENTERLINE OF THE WATER |
| | CLOSET 12 INCHES (305 MM) MINIMUM ON ONE SIDE AND 24 |
| | INCHES (610 MM) MINIMUM ON THE OTHER SIDE. |
| | |
| | 3. TOILET DISPENSER SHALL COMPLY WITH FBC ACC 604.7 |
| | DISPENSERS. |
| | TOILET PAPER DISPENSERS SHALL COMPLY WITH 309.4 AND |
| | SHALL BE 7 INCHES (180 MM) MINIMUM AND 9 INCHES (230 |
| | MM) MAXIMUM IN FRONT OF THE WATER CLOSET MEASURED TO |
| | THE CENTERLINE OF THE DISPENSER |
| | |
| | 4. THE BRANCH DRAIN FOR THE NEW MOP SINK AND BREAK ROOM |
| | SINK SHALL CONNECT TO BUILDING DRAIN DOWN STREAM OF THE |
| | BATHROOM GROUP. PER FBC PL 912.1 |
| | |
| | 5. A BACK FLOW IS REQUIRED ON THE REFRIGERATOR ICE |
| | MACHINE. PER FBC PL 608.3 |
| | |
| | 6. SHT. P3.1 THE WATER HEATER STAND AND PLATFORM |
| | DETAILS DON,T MATCH PLEASE CLARIFY. PER WPB AMEND TO |
| | FBC 107.2.1 |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |