| Date |
Text |
| 2017-08-03 10:17:39 | 1ST REVIEW: FBC 2014 5TH EDITION |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. SHT. P2-0P1, P2-0P2, P2-01, P2-02, AND P2-03 PLEASE |
| | LABEL ALL STACKS TO MATCH UP WITH ISO DRAWINGS, TO |
| | INCLUDE WATER SANITARY AND GAS. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 2. SHT. P5-03C, D, E, AND P5-23 PLEASE SHOW THE LEVELS |
| | ON ISOMETRIC DRAWINGS, AND INDICATE LOCATION ON THE |
| | ISO. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 3. PLEASE SHOW COMPLIANCE IN ALL BATHROOMS IN COMMON |
| | AREAS WITH FBC ACC |
| | A) 603.3 MIRRORS. |
| | MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALL |
| | BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING |
| | SURFACE 40 INCHES (1015 MM) MAXIMUM ABOVE THE FINISH |
| | FLOOR OR GROUND. MIRRORS NOT LOCATED ABOVE LAVATORIES |
| | OR COUNTERTOPS SHALL BE INSTALLED WITH THE BOTTOM EDGE |
| | OF THE REFLECTING SURFACE 35 INCHES (890 MM) MAXIMUM |
| | ABOVE THE FINISH FLOOR OR GROUND. |
| | B) 604.4 SEATS. |
| | THE SEAT HEIGHT OF A WATER CLOSET ABOVE THE FINISH |
| | FLOOR SHALL BE 17 INCHES (430 MM) MINIMUM AND 19 INCHES |
| | (485 MM) MAXIMUM MEASURED TO THE TOP OF THE SEAT. SEATS |
| | SHALL NOT BE SPRUNG TO RETURN TO A LIFTED POSITION. |
| | C) 604.7 DISPENSERS. |
| | TOILET PAPER DISPENSERS SHALL COMPLY WITH 309.4 AND |
| | SHALL BE 7 INCHES (180 MM) MINIMUM AND 9 INCHES (230 |
| | MM) MAXIMUM IN FRONT OF THE WATER CLOSET MEASURED TO |
| | THE CENTERLINE OF THE DISPENSER. THE OUTLET OF THE |
| | DISPENSER SHALL BE 15 INCHES (380 MM) MINIMUM AND 48 |
| | INCHES |
| | (1220 MM) MAXIMUM ABOVE THE FINISH FLOOR AND SHALL NOT |
| | BE LOCATED BEHIND GRAB BARS |
| | D) 604.5.1 SIDE WALL. |
| | THE SIDE WALL GRAB BAR SHALL BE 42 INCHES (1065 MM) |
| | LONG MINIMUM, LOCATED 12 INCHES (305 MM) MAXIMUM FROM |
| | THE REAR WALL AND EXTENDING 54 INCHES (1370 MM) MINIMUM |
| | FROM THE REAR WALL. |
| | E) 604.5.2 REAR WALL. |
| | THE REAR WALL GRAB BAR SHALL BE 36 INCHES (915 MM) LONG |
| | MINIMUM AND EXTEND FROM THE CENTERLINE OF THE WATER |
| | CLOSET 12 INCHES (305 MM) MINIMUM ON ONE SIDE AND 24 |
| | INCHES (610 MM) MINIMUM ON THE OTHER SIDE. |
| | F) 609.4 POSITION OF GRAB BARS. |
| | GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL POSITION, |
| | 33 INCHES (840 MM) MINIMUM AND 36 INCHES (915 MM) |
| | MAXIMUM ABOVE THE FINISH FLOOR MEASURED TO THE TOP OF |
| | THE GRIPPING SURFACE. |
| | G) 606.3 HEIGHT. |
| | LAVATORIES AND SINKS SHALL BE INSTALLED WITH THE FRONT |
| | OF THE HIGHER OF THE RIM OR COUNTER SURFACE 34 INCHES |
| | (865 MM) MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. |
| | |
| | 4. PLEASE SHOW COMPLIANCE IN NEW COMMON BATHROOMS WITH |
| | FBC ACC |
| | |
| | A) 604.3.1 SIZE. |
| | CLEARANCE AROUND A WATER CLOSET SHALL BE 60 INCHES |
| | (1525 MM) MINIMUM MEASURED PERPENDICULAR FROM THE SIDE |
| | WALL AND 56 INCHES (1420 MM) MINIMUM MEASURED |
| | PERPENDICULAR FROM THE REAR WALL. |
| | B) 604.2 LOCATION. |
| | THE WATER CLOSET SHALL BE POSITIONED WITH A WALL OR |
| | PARTITION TO THE REAR AND TO ONE SIDE. THE CENTERLINE |
| | OF THE WATER CLOSET SHALL BE 16 INCHES (405 MM) MINIMUM |
| | TO 18 INCHES (455 MM) MAXIMUM FROM THE SIDE WALL OR |
| | PARTITION, |
| | C) LAVATORIES 606.2 CLEAR FLOOR SPACE. |
| | A CLEAR FLOOR SPACE COMPLYING WITH 305, POSITIONED FOR |
| | A FORWARD APPROACH, AND KNEE AND TOE CLEARANCE |
| | COMPLYING WITH 306 SHALL BE PROVIDED. |
| | |
| | 5. PLEASE REMOVE OLD REVISION CLOUDS FROM ALL SHEETS IT |
| | HAS BEEN VERY DIFFICULT TO LOCATE THE CHANGES ON THIS |
| | REVISION, HERE IS A LIST OF PLAN PAGES THAT I COULD NOT |
| | SEE ANY CHANGES FROM THE APPROVED PLAN PAGE: P2.19, |
| | P1.25, P2.26, P2.53A, P2.54A, P2.54C, P2.54G, P2.56B, |
| | P2.57B, P5.01, P5.02, P5.03, P5.03B. PER WPB AMEND TO |
| | FBC 107.2.1 |
| | |
| | 6. AAV ARE NOT PERMITTED BELOW 4TH BRANCH DOWN FROM |
| | ROOF NOT STILL ON FLOOR PLANS PLEASE REMOVE SHT. |
| | P2.55A, P2.55C PLEASE CHECK ALL FLOOR PLAN SHEETS. PER |
| | FBC PL 918.3.1/ WPB AMEND TO FBC 107.2.1 |
| | |
| | 7. SHT. P5.23 IS MISSING ISO #2 FROM APPROVED PLAN |
| | SHEET. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 8. SHT. P5.03C PLEASE PROVIDE ISO THAT SHOWS SS S7, S8, |
| | AND S9 CONNECTING TO ONE SINGLE STACK AND SHOW THE |
| | LEVEL. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 9. SHT. P2.01 THE SOIL STACK ON THE BACK SIDE OF |
| | ELEVATOR #1 SHOWS A 4? PIPE SHT. P2.0P1 SHOWS A 6? AT |
| | SAME LOCATION PLEASE CLARIFY. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 10. ON THE RISER AND ISO DRAWINGS THERE ARE VENTS THAT |
| | END AND IT IS NOT CLEAR WHERE THEY CONTINUE OR |
| | TERMINATE PLEASE PROVIDE A TAG OR A WAY OF DETERMINING |
| | WHERE THEY CONTINUE OR TERMINATE. PER WPB AMEND TO FBC |
| | 107.2.1 |
| | |
| | 11. SHT. P5.03B S12 LEVEL 25 THE ISO DOES NOT MATCH THE |
| | FLOOR PLAN ON SHT. P2.61B PLEASE CLARIFY. PER WPB AMEND |
| | TO FBC 107.2.1 |
| | |
| | 12. PROVIDE ISO FOR NEW BATHROOMS ON LEVEL 1. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 13. PLEASE PROVIDE MANUFACTURE SPECIFICATIONS FOR THE |
| | LAUNDRY TRENCH DRAIN. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 14. PLEASE PROVIDE A REVISED CONDENSATE RISER. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | |
| | POOL COMMENTS : |
| | |
| | 1. SHT. W1-1.02 THE NOTE ON GUTTER DRAIN SHOULD BE 20 |
| | WITH THE ADDITIONAL DRAIN PLEASE CLARIFY. PER WPB AMEND |
| | TO FBC 107.2.1 |
| | |
| | 2. SHT. W1-2.02 SHOW THE PIPE SIZE FOR THE NEW FLOOR |
| | HYDROTHERAPY JETS ALSO CHECK THE HIS AND HERS SPAS FOR |
| | PIPE SIZES. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 3. PROVIDE MANUFACTURE SPECIFICATIONS FOR THE CHLORINE |
| | GENERATOR AND SACRIFICIAL ANODE AND STEAM UNIT. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 4. PLEASE PROVIDE PIPING DIAGRAM AND DETAILS FOR STEAM |
| | SYSTEM. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 5. SHT. W1-2.01, W1-4.01, W1-5.01, W5-1.05 THE REVISED |
| | PAGES APPEAR TO BE THE SAME AS APPROVED PAGES PLEASE |
| | CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |