Plan Review Notes
Plan Review Notes For Permit 17070060
Permit Number 17070060
Review Stop G
Sequence Number 1
Notes
Date Text
2017-07-12 09:31:421) THE SURVEY INDICATES AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM.SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS THE
 TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT THE APPLIANCE. FGC SECS.
 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR SECS.G2412.4,
 G2412.8, G2413.1, G2413.2, G2413.3.
 2) CLEARLY SHOW THE TRANSITION OF THE U/G PE PIPE TO
 THE GALVANIZED ABOVEGROUND. AS DRAWN, THE RISER APPEARS
 TO SHOW THE GALVANIZED BELOW GROUND WHICH IS NOT
 PERMITTTED BY THE GAS CODE.
 3) THE GENERATOR SPECS INDICATE A 1 " INLET BUT THE GAS
 PLAN SHOWS A 3/4'" SUPPLY. CLARIFY.
 4) INDICATE THE SIZING TABLE FROM THE 2014 FBC- FUEL
 GAS USED FOR THE LOW PRESSURE LINE DOWNSTREAM OF THE
 PRESSURE REGULATOR AT THE GENERATOR.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  