Plan Review Notes
Plan Review Notes For Permit 17061197
Permit Number 17061197
Review Stop E
Sequence Number 2
Notes
Date Text
2017-08-14 10:33:49CODES IN EFFECT:
 FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH
 EDITION
 NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. RISER DIAGRAM PROVIDED DOES NOT SHOW THE REQUIRED
 EQUIPMENT GROUNDING CONDUCTOR TO THE INTERIOR PANELS.
 PROVIDE CORRECTION. NEC 250.122
 2. PLAN PROVIDED SHOWS A SEPARATE SERVICE FOR THE REAR
 BUILDING. PREVIOUS COMMENT MENTIONED THIS AND WAS NOT
 ADDRESSED SATISFACTORILY. ONLY ONE SERVICE, WITH A
 MAXIMUM OF SIX DISCONNECTS, IS PERMITTED PER CODE.
 ADDITIONALLY, FPL ELECTRIC SERVICE STANDARDS STATE THAT
 ONLY ONE SERVICE DROP IS PROVIDED PER LOT. RISER
 DIAGRAM NEEDS TO BE REVISED TO SHOW ALL METERS AT THE
 SAME LOCATION, FED FROM A SINGLE SERVICE LOCATED AT THE
 FRONT BUILDING. THE RISER DIAGRAM PROVIDED STATES THAT
 IT IS FOR THE FRONT BUILDING, BUT PLAN SUBMITTED FOR
 PERMIT 17061198 SHOWS DIFFERENT INFORMATION. PLEASE
 CLARIFY AND/OR CORRECT. NEC 230.2, 230.71,
 310.15(B)(7), FBC 107.2.1
 3. PANELS ARE SHOWN AS MAIN LUG ONLY. A DISCONNECT IS
 REQUIRED FOR SEPARATE STRUCTURES. PROVIDE CORRECTION.
 NEC 225.31, 225.32
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  