| 2017-07-19 13:43:28 | 1) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL | | | BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS | | | SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 | | | (37) OR 2014 FBC-RES. SEC. G2413. | | | 2) SHOW THE DISTANCE FROM THE POINT OF DELIVERY (GAS | | | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE | | | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 | | | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G | | | 2413.3. | | | 3) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM | | | ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. | | | SEC. G2413.2. | | | 4) ) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES | | | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE | | | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM | | | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE | | | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL | | | GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 | | | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, | | | G2412.8, G2413.1, G2413.2, & G2413.3. | | | | | | I SUGGEST YOU CONTACT THIS REVIEWER TO SET UP AN | | | APPOINTMENT TO DISCUSS THESE COMMENTS. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|