| Date |
Text |
| 2017-07-13 14:59:44 | 1) WHAT IS THE GAS LINE CONNECTING TO IN THE UTILITY |
| | EASEMENT? IS THE GAS LINE IN THE EASEMENT A PUBLIC |
| | UTILITY LINE? IF SO, A PLUMBING CONTRACTOR CANNOT DO |
| | THIS SCOPE OF WORK. IT IS UNDER THE AUTHORITY OF THE |
| | PUBLIC SERVICE COMMISSION AND THE GAS PURVEYOR. |
| | CLARIFY.FL. STATUTE 489.105. |
| | 2) THE SCOPE OF WORK ON THE APPLICATION NOTES A |
| | CONNECTION TO AN EXISTING GAS METER. IF THERE IS AN |
| | EXISTING GAS METER THERE SHOULD BE AN EXISTING SERVICE |
| | LINE CONNECTION TO THIS METER.CLARIFY WHY THIS LINE IS |
| | BEING REPLACED. |
| | 3) THE SUBMITTED PLAN IS SO DEFICIENT IN THE REQUIRED |
| | INFORMATION A COMPREHENSIVE REVIEW COULD NOT BE |
| | ACCOMPLISHED. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 4) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED AND |
| | PIPE SIZE.WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | 5) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS |
| | SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 |
| | (37) OR 2014 FBC-RES. SEC. G2413. |
| | 6) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| | 2413.3. |
| | 7) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| | SEC. G2413.2. . |
| | |
| | NOTE: THE ADDITIONAL DOCUMENTS YOU HAVE SUBMITTED FOR |
| | REVIEW ARE NO BETTER THAN WHAT WAS ORIGINALLY |
| | SUBMITTED. COMPLY WITH ALL PREVIOUS PLAN REVIEW |
| | COMMENTS. I SUGGEST YOU CONTACT THIS REVIEWER TO SET UP |
| | AN APPOINTMENT TO DISCUSS THESE COMMENTS. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |