| Plan Review Notes For Permit 17060918 |
| Permit Number |
17060918 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-06-21 16:51:01 | CODES IN EFFECT: | | | FLORIDA BUILDING CODE 2014 5TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH ED | | | NFPA 70 2011 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | NEED TO REVISE PERMIT #16090649 TO SHOW NEW CONNECTION | | | FOR THE SOLAR PHOTOVOLTAIC SYSTEM | | | PLANS SHO 40A BREAKERS FOR SYSTEM ON RISER, E-4 SHOWS | | | 90A TO MDP? | | | | | | NEED TO REVISE PERMIT #16080934 TO SHOW FIRE ALARM | | | CONNECTION TO FIRE PUMP, FLOWS AND TAMPERS | | | | | | RISER SHOWS CONNECTION TO A FIRE PUMP, PLEASE SEE | | | SECTION 695 OF THE NEC FOR CONNECTION OF A FIRE PUMP | | | SYSTEM. | | | WIRING IS TO BE SEPARATE FROM ALL OTHER WIRING. | | | SHOW HOW WIRE TO FIRE PUMP IS TO BE KEPT SEPARASTE FROM | | | ALL OTHER WIRING | | | | | | SUBMIT PANEL SCHEDULES FOR MDP SHOWINF NEW | | | PHOTOVOLTALIC SYSTEM 90A SINGLE PHASE , THREE PHASE? | | | | | | PLEASE SHOW WHICH PERMIT HAS THE FIREPUMP INSTALLATION | | | ON IT? | | | WHICH PERMIT # | | | | | | |
|