| Date |
Text |
| 2017-06-20 13:54:54 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) ALL WORK AND CONDITIONS SHALL COMPLY WITH THE |
| | APPLICABLE REQUIREMENTS OF NFPA? 820, STANDARD FOR FIRE |
| | PROTECTION IN WASTEWATER TREATMENT AND COLLECTION |
| | FACILITIES, 2012 EDITION |
| | |
| | CHAPTER 1 ADMINISTRATION |
| | 1.1 SCOPE. |
| | 1.1.1* GENERAL. THIS STANDARD SHALL ESTABLISH MINIMUM |
| | REQUIREMENTS FOR PROTECTION AGAINST FIRE AND EXPLOSION |
| | HAZARDS IN WASTEWATER TREATMENT PLANTS AND ASSOCIATED |
| | COLLECTION SYSTEMS, INCLUDING THE HAZARD CLASSIFICATION |
| | OF SPECIFIC AREAS AND PROCESSES. |
| | 1.1.2 THIS STANDARD SHALL APPLY TO THE FOLLOWING: |
| | (1) COLLECTION SEWERS |
| | (2) TRUNK SEWERS |
| | (3) INTERCEPTING SEWERS |
| | (4) COMBINED SEWERS |
| | (5) STORM SEWERS |
| | (6) PUMPING STATIONS |
| | (7) WASTEWATER TREATMENT PLANTS |
| | (8) SLUDGE-HANDLING FACILITIES |
| | (9) CHEMICAL-HANDLING FACILITIES |
| | (10) TREATMENT FACILITIES |
| | (11) ANCILLARY STRUCTURES (SEE 3.3.60.1) |
| | |
| | 1.3 APPLICATION. |
| | 1.3.1* NEW INSTALLATIONS. THE REQUIREMENTS OF THIS |
| | STANDARD SHALL APPLY TO NEW INSTALLATIONS. |
| | 1.3.1.1 WHEN ADDITIONS OR MODIFICATIONS ARE MADE TO |
| | EXISTING FACILITIES, THE MODIFICATIONS SHALL REFLECT |
| | THE REQUIREMENTS OF THIS DOCUMENT. |
| | 1.3.1.2 IN ANY EVENT, THE REQUIREMENTS OF THIS STANDARD |
| | SHALL BE USED BY OWNERS IN A RISK ASSESSMENT TO |
| | IDENTIFY THE AREAS OF A TREATMENT PLANT THAT ARE |
| | VULNERABLE TO FIRE OR OTHER LOSS. |
| | |
| | |
| | 1.3.2 TOXICITY AND BIOLOGICAL HAZARDS. |
| | 1.3.2.1 THIS STANDARD SHALL APPLY TO THE FIRE AND |
| | EXPLOSION HAZARDS OF VARIOUS SUBSTANCES ASSOCIATED WITH |
| | WASTEWATER TREATMENT AND CONVEYANCE. |
| | |
| | 1.3.3 FIRE RISK EVALUATION. A FIRE RISK EVALUATION |
| | SHALL BE INITIATED EARLY IN THE FACILITY DESIGN OR |
| | ALTERATION TO INTEGRATE THE FIRE PREVENTION AND FIRE |
| | PROTECTION REQUIREMENTS DESCRIBED IN THIS DOCUMENT. |
| | 1.3.4 VENTILATION PRACTICES. VENTILATION RATES REQUIRED |
| | BY THIS STANDARD SHALL BE TO MINIMIZE FIRE AND |
| | EXPLOSION HAZARDS, BECAUSE INSUFFICIENT VENTILATION |
| | RATES CAN EXPOSE PERSONNEL TO TOXIC AND BIOLOGICAL |
| | HAZARDS. |
| | |
| | |
| | PLEASE REVIEW AND ENSURE COMPLIANCE WHERE APPLICABLE. |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |